Wake County Hazard Mitigation Plan - Adopted 10-21-2024

Element B Requirements

Location in Plan (section and/or page number)

Met / Not Met

B2. Does the plan include a summary of the jurisdiction’s vulnerability and the impacts on the community from the identified hazards? Does this summary also address NFIP-insured structures that have been repetitively damaged by floods? (Requirement 44 CFR § 201.6(c)(2)(ii))

Section 4.3, p.69-70; Section 4.5, (p. 85-271 “Vulnerability Assessment” subheadings) Annexes Dam Failure 104-105 Drought 110-112 Earthquake 121-126 Extreme Heat 127-131 Flood 147-156, 164-165 Hurricane / Tropical Storm 173-180 Landslide 193-194 Severe Weather 208-215 Severe Winter Storm 221-222 Tornado 229-236 Wildfire 247-251 51, 59-61, 80-93, Annex A

Met

B2-a. Does the plan provide an overall summary of each jurisdiction’s vulnerability to the identified hazards?

Section 4.5, p.85-272, Annexes Dam Failure 103-105 Drought 110-112 Earthquake 120-125 Extreme Heat 129-132 Flood

Met

B2-b. For each participating jurisdiction, does the plan describe the potential impacts of each of the identified hazards on each participating jurisdiction?

139-144, 146-165

Hurricane / Tropical Storm

168-180

Landslide

191-194

Severe Weather

197, 199-215

Severe Winter Storm

218-222

Tornado

226-236

Wildfire 247-251 40, 43, 53-56, 59, 61-70, 80-81

WSP June 2024 Page A.10

Wake County, NC Multi-Jurisdictional Hazard Mitigation Plan

Made with FlippingBook interactive PDF creator