Element B Requirements
Location in Plan (section and/or page number)
Met / Not Met
Section 4.5.5, p.148-155
Met
B2-c. Does the plan address NFIP-insured structures within each jurisdiction that have been repetitively damaged by floods?
Concur
ELEMENT B REQUIRED REVISIONS
Required Revision: NCEM 1st Review: No revisions required.
Element C: Mitigation Strategy Element C Requirements
Location in Plan (section and/or page number)
Met / Not Met
C1. Does the plan document each participant’s existing authorities, policies, programs and resources and its ability to expand on and improve these existing policies and programs? (Requirement 44 CFR § 201.6(c)(3))
C1-a. Does the plan describe how the existing capabilities of each participant are available to support the mitigation strategy? Does this include a discussion of the existing building codes and land use and development ordinances or regulations? C1- b. Does the plan describe each participant’s ability to expand and improve the identified capabilities to achieve mitigation?
Section 5, p.272-291
Met
Concur
Section 5, p.272-291
Met
Concur
C2. Does the plan address each jurisdiction’s participation in the NFIP and continued compliance with NFIP requirements, as appropriate? (Requirement 44 CFR § 201.6(c)(3)(ii))
C2-a. Does the plan contain a narrative description or a table/list of their participation activities?
Section 5.3.1, p.278- 285, Table 5.2
Met
Concur, 127, 137, 146, 287, 289-292, 298
C3. Does the plan include goals to reduce/avoid long-term vulnerabilities to the identified hazards? (Requirement 44 CFR § 201.6(c)(3)(i))
C3-a. Does the plan include goals to reduce the risk from the hazards identified in the plan?
Section 6.1, p.292- 293 Concur
Met
WSP June 2024 Page A.11
Wake County, NC Multi-Jurisdictional Hazard Mitigation Plan
Made with FlippingBook interactive PDF creator