Wake County Hazard Mitigation Plan - Adopted 10-21-2024

Element B Requirements

Location in Plan (section and/or page number)

Met / Not Met

Section 4.5.5, p.148-155

Met

B2-c. Does the plan address NFIP-insured structures within each jurisdiction that have been repetitively damaged by floods?

Concur

ELEMENT B REQUIRED REVISIONS

Required Revision: NCEM 1st Review: No revisions required.

Element C: Mitigation Strategy Element C Requirements

Location in Plan (section and/or page number)

Met / Not Met

C1. Does the plan document each participant’s existing authorities, policies, programs and resources and its ability to expand on and improve these existing policies and programs? (Requirement 44 CFR § 201.6(c)(3))

C1-a. Does the plan describe how the existing capabilities of each participant are available to support the mitigation strategy? Does this include a discussion of the existing building codes and land use and development ordinances or regulations? C1- b. Does the plan describe each participant’s ability to expand and improve the identified capabilities to achieve mitigation?

Section 5, p.272-291

Met

Concur

Section 5, p.272-291

Met

Concur

C2. Does the plan address each jurisdiction’s participation in the NFIP and continued compliance with NFIP requirements, as appropriate? (Requirement 44 CFR § 201.6(c)(3)(ii))

C2-a. Does the plan contain a narrative description or a table/list of their participation activities?

Section 5.3.1, p.278- 285, Table 5.2

Met

Concur, 127, 137, 146, 287, 289-292, 298

C3. Does the plan include goals to reduce/avoid long-term vulnerabilities to the identified hazards? (Requirement 44 CFR § 201.6(c)(3)(i))

C3-a. Does the plan include goals to reduce the risk from the hazards identified in the plan?

Section 6.1, p.292- 293 Concur

Met

WSP June 2024 Page A.11

Wake County, NC Multi-Jurisdictional Hazard Mitigation Plan

Made with FlippingBook interactive PDF creator