Fuquay Varina Pedestrian Plan - Adopted 8-1-2022

PLANNING ESTIMATE FUQUAY-VARINA PEDESTRIAN PLAN

PLANNING ESTIMATE FUQUAY-VARINA PEDESTRIAN PLAN

NC License #P-1301

NC License #P-1301

PRIORITY PROJECT #4: DEPOT GREENWAY EXTENSION

PRIORITY PROJECT #3: LINCOLN HEIGHTS CONNECTORS

LOCATION:

LOCATION: DESCRIPTION:

SIGNAGE ON CHERRY ST, WASHINGTON ST, DOGWOOD, ST

1250 LF 10' WIDE ASPHALT GREENWAY FROM PARKER STATION SEGMENT TO JUDD PKWY PEDESTRIAN HYBRID BEACON IMPROVEMENT AT JUDD PKWY CROSSING 1170 LF 10' WIDE ASPHALT GREENWAY FROM JUDD PKWY TO E. ACADEMY ST/ BRAMBLEHILL DR 510 LF 10' WIDE CONCRETE SIDE PATH ALONG FUTURE E. ACADEMY ST

DESCRIPTION:

520 LF 10FT WIDE ASPHALT GREENWAY FROM LAWRENCE ST TO EASTERN EDGE OF WILLIAM FREEMAN PARK PEDESTRIAN CROSSING OF RAILROAD (INACTIVE) FROM DOGWOOD ST TO LAWRENCE ST 2000 LF 10FT WIDE ASPHALT GREENWAY FROM CHERRY ST TO ACTION PARK AND COBBLESTONE APARTMENTS INTERSECTION IMPROVEMENTS AT WASHINGTON ST / BRIDGE ST AND CHERRY ST / BRIDGE ST

4650 LF 10' WIDE ASPHALT GREENWAY FROM OLD HONEYCUTT RD TO PURFOY RD PEDESTRIAN HYBRID BEACON IMPROVEMENT AT PURFOY RD CROSSING 1700 LF 10' WIDE ASPHALT GREENWAY FROM PURFOY RD TO BER CREEK DR 780 LF 5' WIDE CONCRETE SIDEWALK ALONG BER CREEK DR 620 LF 10' WIDE ASPHALT GREENWAY FROM BER CREEK DR TO HONEYCUTT RD PARK GREENWAY 3970 LF 10' WIDE CONCRETE SIDE PATH ALONG FOLD HONEYCUTT RD FROM JUDD PL DR JUST WEST OF BER CREEK DR

1.1 MILES

TOTAL LENGTH:

COUNTY:

WAKE

DIVISION:

5

ITEM NO.

UNIT PRICE

AMOUNT

ITEM DESCRIPTION

QUANTITY UNIT

DESC. NO.

SECT. NO.

TRAIL ITEMS

2.8 MILES

TOTAL LENGTH:

MOBILIZATION CONSTRUCTION SURVEYING

LS LS LS

0000100000-N 0000400000-N 0043000000-N 1121000000-E 1523000000-E 1575000000-E 2549000000-E 2591000000-E 2605000000-N 4025000000-E 4072000000-E 4102000000-N 4399000000-N

800 801 226 520 610 620 846 848 848

1 1 1

$36,000.00 $20,000.00 $244,000.00

$36,000.00 $20,000.00 $244,000.00 $45,600.00 $64,000.00 $16,000.00 $2,400.00 $4,480.00 $9,000.00 $4,680.00 $7,020.00 $3,900.00 $30,000.00 $20,000.00

COUNTY:

WAKE

DIVISION:

5

GRADING

AGGREGATE BASE COURSE

TON TON TON

1,140

$40.00 $200.00 $800.00 $80.00 $80.00

ITEM NO.

UNIT PRICE

ASPHALT CONC SURFACE COURSE, TYPE S9.5C

320

ITEM DESCRIPTION

QUANTITY UNIT

AMOUNT

DESC. NO.

SECT. NO.

ASPHALT BINDER FOR PLANT MIX 2'-6" CONCRETE CURB & GUTTER 4" CONCRETE SIDEWALK

20 30 56

LS EA LF SY EA LF SF EA

TRAIL ITEMS

MOBILIZATION CONSTRUCTION SURVEYING

LS LS LS

0000100000-N 0000400000-N 0043000000-N 1121000000-E 1523000000-E 1575000000-E 2549000000-E 2591000000-E 2605000000-N 2647000000-E 4399000000-N

800 801 226 520 610 620 846 848 848 852

1 1 1

$172,000.00 $110,000.00 $819,000.00

$172,000.00 $110,000.00 $819,000.00 $232,000.00 $117,000.00 $54,000.00 $162,000.00 $270,600.00 $78,000.00 $7,000.00 $50,000.00 $300,000.00

CONCRETE CURB RAMP CONTR FURN, ***SIGN (E)

3

$3,000.00

GRADING

234 351

$20.00 $20.00 $150.00

AGGREGATE BASE COURSE

TON TON TON

5,800 1,170

$40.00 $100.00 $720.00 $40.00 $50.00

SUPPORTS, 3-LB STEEL U-CHANNEL

903 904

ASPHALT CONC SURFACE COURSE, TYPE S9.5C

SIGN ERECTION, TYPE E

26

ASPHALT BINDER FOR PLANT MIX 2'-6" CONCRETE CURB & GUTTER 4" CONCRETE SIDEWALK

75

TEMPORARY TRAFFIC CONTROL

1105

1 2

$30,000.00 $10,000.00

EA LS SY SY EA LF

4,050 5,412

PEDESTRIAN RAILROAD CROSSING (INACTIVE RR LINE, PAVING FOR SIDEWALK APPROACH ONLY,ASSUMES NO SIGNALS/ARMS REQUIRED) RECTANGULAR RAPID FLASHING BEACON CROSSING (EA SIGN)

EA

1

$25,000.00

$25,000.00

5" MONOLITHIC CONCRETE ISLANDS (SURFACE MOUNTED) CONCRETE CURB RAMP

26 28

$3,000.00

DRAINAGE ALLOWANCE PEDESTRIAN BRIDGE

LS LS LS LF

20

$3,000.00 $20,000.00 $40,000.00 $31,000.00

$60,000.00 $20,000.00 $40,000.00

$250.00

1 1

PEDESTRIAN HYBRID BEACON TEMPORARY TRAFFIC CONTROL

1105

1 2

$50,000.00 $150,000.00

EROSION CONTROL ALLOWANCE

MINOR ITEMS (5%)

PEDESTRIAN TRAFFIC SIGNALS: OLD HONEYCUTT / PUROFY - ADD PEDESTRIAN SIGNALS (3 LEGS)

1 $31,000.00 CONSTRUCTION COST SUBTOTAL $683,080.00 CONTINGENCY (30%) $204,930.00 OPINION OF PROBABLE CONSTRUCTION COST $888,010.00 $177,602.00 OPINION OF TOTAL CONSTRUCTION COST (2022) $1,066,000.00 NCDOT ADMINISTRATION FEE (20%)

LS

1

$20,000.00

$20,000.00

PEDESTRIAN BRIDGE

LS LS LS LF LF

30

$3,000.00

$90,000.00 $102,000.00 $260,000.00 $200,000.00

10' CLEAR WIDTH WOOD BOARDWALK

170

$600.00

DRAINAGE ALLOWANCE

1 1

$260,000.00 $200,000.00 $144,000.00

EROSION CONTROL ALLOWANCE

MINOR ITEMS (5%)

1 $144,000.00 CONSTRUCTION COST SUBTOTAL $3,187,600.00 CONTINGENCY (30%) $956,280.00 UTILITIES (ABOVE GROUND) $10,000.00 OPINION OF PROBABLE CONSTRUCTION COST $4,153,880.00 $830,776.00 OPINION OF TOTAL CONSTRUCTION COST (2022) $4,985,000.00 NCDOT ADMINISTRATION FEE (20%)

CONSTRUCTION ENGINEERING AND INSPECTION (15%) (2022)

$160,000.00

NOTE:

ESTIMATE IS NOT BASED ON AN ENGINEERING DESIGN, AND IS FOR PLANNING PURPOSES ONLY. BASED ON 2022 UNIT PRICES, INFLATION NOT INCLUDED

ASSUMES LAP FUNDING REQUIRING NCDOT ADMINISTRATION FEE.

EXCLUDES RIGHT-OF-WAY, DESIGN, AND PERMITTING. UNDERGROUND UTILITY COORDINATION/RELOCATION COSTS UNKNONWN AND NOT INCLUDED.

CONSTRUCTION ENGINEERING AND INSPECTION (15%) (2022)

$748,000.00

COMPUTED BY

CJA

NOTE:

ESTIMATE IS NOT BASED ON AN ENGINEERING DESIGN, AND IS FOR PLANNING PURPOSES ONLY. BASED ON 2022 UNIT PRICES, INFLATION NOT INCLUDED.

6/24/2022

DATE

ASSUMES LAP FUNDING REQUIRING NCDOT ADMINISTRATION FEE.

EXCLUDES RIGHT-OF-WAY, DESIGN, AND PERMITTING. UNDERGROUND UTILITY COORDINATION/RELOCATION COSTS UNKNONWN AND NOT INCLUDED.

THE SIDE PATH ALONG THE FUTURE ACADEMY STREET ASSUMES THE ROAD WILL BE CONSTRUCTED UNDER SEPARATE COST PRIOR TO TRAIL CONSTRUCTION, AND THAT THE ROAD CONSTRUCTION WILL PROVIDE A GRADED SHOULDER AND ANY NECESSARY DRAINAGE TO ACCOMMODATE THE TRAIL.

COMPUTED BY

CJA

DATE

6/24/2022

N:\Shared\PROJECTS\2021\00-2021-074 Fuquay-Varina, NC Pedestrian Plan\Products\Estimate (Planning)\2021-074_Planning Estimate_#3_Lincoln Heights .xlsx 1

N:\Shared\PROJECTS\2021\00-2021-074 Fuquay-Varina, NC Pedestrian Plan\Products\Estimate (Planning)\2021-074_Planning Estimate_#4_Depot Greenway.xlsx 1

144

145

APPENDIX E: PRIORITY PROJECT COST ESTIMATES

FUQUAY-VARINA PEDESTRIAN PLAN

Made with FlippingBook - PDF hosting