Fuquay Varina Pedestrian Plan - Adopted 8-1-2022

Map 11: Projects In Development RECOMMENDATIONS

PROJECTS IN DEVELOPMENT Building on the existing pedestrian network, the Town of Fuquay-Varina is already in the process of implementing several facilities that are funded and will be constructed in the near term, or will be constructed as part of an upcoming development. An overview of each of these projects is provided in the table below and in Map 11. These are key building blocks for pedestrian network planning.

Ä 55

APEX

HOLLY SPRINGS

CARY

GARNER

Map ID

Projects In Development Alston Ridge/Bass Lake Greenway - This greenway project will be constructed in the near term, and will connect Alston Ridge Park (and surrounding neighborhood) to Bass Lake in Holly Springs. The Varina Gateway Townes development will include a greenway connection to Alston Ridge Park and the existing greenway that will eventually link to Bass Lake in Holly Springs. The Midtown Subdivision will include a short greenway link to Dr. William Freeman Park with sidewalk connectivity also to the Wake Chapel Rd/Railroad St/Main St intersection. The Currin Property development will include a sidewalk segment along Coley Farm Rd (in addition to an internal trail section as well with sidewalk connectivity to Washington St). The Jones St sidewalk project will connect Main St directly to Fuquay-Varina Middle School. The Parker Station development will include a greenway spine along the old railroad bed, with sidewalk connectivity to the adjacent neighborhood streets and businesses. The North St and Ransdell Rd sidewalk project will connect Fuquay-Varina High School with downtown Varina. A short sidewalk gap on the southeastern section of Judd Pkwy will be completed in the near term. Multiple internal sidewalk networks and sidepaths along Angier Rd and Purfoy Rd are being constructed in this areas as part of multiple ongoing subdivision developments. The Hidden Valley Greenway is being constructed as part of multiple ongoing subdivision developments, serving as a spine for adjacent residential sidewalk networks. Sidepaths will be constructed as part of the new roadway that will connect NC 42 across US 401 and Mill Creek Dr. As part of the Crossings Apartments Development, sidepath connectivity will be extended along Judd Pkwy and sidewalk connectivity will be extended between Judd Pkwy and Penmon Dr.

1

1

2 3 4 5 6 9 8 7

2

D ICKENS RD

£ 401

OLD POWELL RD

7

11

12

3

4

6

E

Ä 55

5

Ä 42

8

JUDD

11 10

10

£ 401

9

12

Existing data as of November, 2021

ANGIER

0

0.5

1MILES

NOTE: This figure is intended only for reference, conceptual planning, and informational purposes. This figure should not be used to establish boundaries, property lines, location of objects, or to provide any other information typically needed for final design, construction or any other purpose when engineered plans are required.

RECOMMENDATIONS

FEATURES AND BOUNDARIES SCHOOL

EXISTING FACILITIES

EXISTING GREENWAY EXISTING SIDEPATH EXISTING SIDEWALK

PROPOSED GREENWAY PROPOSED SIDEPATH PROPOSED SIDEWALK

PARK

STREAM/RIVER

PEDESTRIAN CROSSING SIGNAL HIGH VISIBILITY CROSSWALK

RAILROAD

IN DEVELOPMENT

FUQUAY-VARINA JURISDICTION

TWO-BAR CROSSWAK ARTISTIC CROSSWALK

OTHER MUNICIPAL BOUNDARY

COUNTY BOUNDARY

50

51

FUQUAY-VARINA PEDESTRIAN PLAN

CHAPTER 3: INFRASTRUCTURE RECOMMENDATIONS

Made with FlippingBook - PDF hosting