Fuquay Varina Pedestrian Plan - Adopted 8-1-2022

Map 12: Priority Projects RECOMMENDATIONS

Ä 55

APEX

PRIORITY PROJECT CHECKLIST The five project sheets below fill key gaps in the pedestrian network, and have been identified as the highest priority projects. The prioritization criteria in the table below are commonly utilized during pedestrian infrastructure project development processes. They generally align with CAMPO’s LAPP prioritization criteria.

HOLLY SPRINGS

CARY

GARNER

Connects Equity Analysis

Within 1/4 mile of a park or recreation center

Within 1/4 mile of a school

Access to downtown cores/ business areas

Near Ped Crash

Supported in Public Feedback

(High Social Vulnerability Area)

In an adopted plan

Map ID

Missing Link

Priority Project

Downtown(s) Crossing Improvements

1

√ √

D ICKENS RD

£ 401

OLD POWELL RD

Downtown Railroad Crossings Lincoln Heights Connectors Depot Greenway Extension/Gap Fuquay-Varina Middle School Connectors

2

√ √

3

2

3

4

4

1

E

5

Ä 55

√ √

5

Ä 42

JUDD

PRIORITY PROJECT SHEETS The following series of project summaries can be used when applying for future funding, or when communicating the priority project details to potential partners during implementation. The project sheets that follow show an analysis of the priority segments, including factors of feasibility identified by the project team. It serves as an inventory of the alignment factors at play, providing guidance for the next steps in implementation.

£ 401

ANGIER

0

0.5

1MILES

NOTE: This figure is intended only for reference, conceptual planning, and informational purposes. This figure should not be used to establish boundaries, property lines, location of objects, or to provide any other information typically needed for final design, construction or any other purpose when engineered plans are required.

RECOMMENDATIONS

FEATURES AND BOUNDARIES SCHOOL

EXISTING FACILITIES

EXISTING GREENWAY EXISTING SIDEPATH EXISTING SIDEWALK

PROPOSED GREENWAY PROPOSED SIDEPATH PROPOSED SIDEWALK

PARK

STREAM/RIVER

PEDESTRIAN CROSSING SIGNAL HIGH VISIBILITY CROSSWALK

RAILROAD

IN DEVELOPMENT

FUQUAY-VARINA JURISDICTION

PRIORITY PROJECTS

TWO-BAR CROSSWAK ARTISTIC CROSSWALK

OTHER MUNICIPAL BOUNDARY

COUNTY BOUNDARY

52

53

FUQUAY-VARINA PEDESTRIAN PLAN

CHAPTER 3: INFRASTRUCTURE RECOMMENDATIONS