Fuquay Varina Pedestrian Plan - Adopted 8-1-2022

PRIORITY PROJECT #1: DOWNTOWN INTERSECTION IMPROVEMENTS

S Main St and Vance St: Upgrade crosswalk striping with high visibility crosswalks; add lead pedestrian interval phasing; add audible function to pedestrian signal. Depot St between S Spring Ave and S Main St: Create a festival street by closing this section of Depot St to automobile traffic. This creates space for prioritized

9

N Main St and N Ennis St: Upgrade crosswalk striping with high visibility crosswalks; add lead pedestrian interval phasing; add audible function to pedestrian signal. Main St and Academy St: Upgrade crosswalk striping with high visibility crosswalks; add lead pedestrian interval phasing; add pedestrian crossing signals (with audible function).

6

7

Burton St

P i ne Acres Community Center & Park

Ä 55

E Broad St

Acti on Park

10

8

7

Faucette St

L i nco l n Hei ghts Elementary

Wi l l i am Freeman Park

pedestrian travel and for adjacent businesses to utilize this space.

Norwood St

Church St

Fuquay-Varina M i dd l e Schoo l

Aiken Pkwy

CORNER DESIGN CONSIDERTAIONS The size of a curb’s radius can have a significant impact on pedestrian comfort and safety. A smaller curb radius provides more pedestrian area at the corner, allows more flexibility in the placement of curb ramps, results in a shorter crossing distance and requires vehicles to slow more on the intersection approach. During the design phase, the chosen radius should be the smallest possible for the circumstances and consider the effective radius in any design vehicle turning modeling. For further information, see Alta Planning + Design’s ‘Corner Design for All Users’ white paper - https://altago.com/ resources/corner-design-for-all-users/

James A. Campbe l l Park

Eppsfield Ln

8

El l is St

1

Fa l con Park

Ä 42

10

R d

E Academy St

The Museums at Ashworth Park

3

Fi rst St

4

Proposed Crossing Improvement

2

W Vance St

Dog Park

E Van c

9

Existing Sidewal k

£ 401

ACCESSIBLE CURB RAMPS • Curb ramps shall slope no more than 1:10, with a maximum cross slope of 2.0%. A slope of no more than 1:12 is desirable. • If the ramp runs directly into a crosswalk, the landing at the bottom will be in the roadway. • The level landing at the top of a ramp shall be a minimum of 5’-0” long (in the direction of the ramp run) and at least as wide as the ramp. If there is a change in direction between ramps and landings, the landing should be a minimum of 5’-0” wide. • Curb ramps shall be located so that they do not project into vehicular traffic lanes, parking spaces, or parking access aisles. Three configurations are illustrated above. • Diagonal curb ramps are not

r

5

FEET

Fuquay M i nera l Spr i ng Park

0

500

1,000

Sunset Dr

MAP NOTES

Estimated Construction Costs: $739,000

Fuquay Ave and E Academy St: Upgrade crosswalk striping with high visibility crosswalks; replace sidewalk/curb corners; add pedestrian crossing signals (with audible function). S Fuquay Ave and Raleigh St; Upgrade crosswalk striping with high visibility crosswalks; replace sidewalk/curb corners; add stop signs to create an all- way stop. S Spring Ave and Depot St: Upgrade crosswalk striping with high visibility crosswalks; replace sidewalk/curb corners; add stop signs to create an all- way stop.

S Spring Ave and W Vance St: Upgrade crosswalk striping with high visibility crosswalks; replace sidewalk/curb corners; add in-street yield to pedestrian signage. S Spring Ave and W Spring St: Upgrade crosswalk striping with high visibility crosswalks; replace sidewalk/curb corners; add in-street yield to pedestrian signage.

1

4

2

5

3

6

Broad St: At middle of block replace crosswalk striping.

recommended. If used, diagonal ramps shall include a clear space of at least 48” within the crosswalk for user maneuverability.

54

55

FUQUAY-VARINA PEDESTRIAN PLAN

CHAPTER 3: INFRASTRUCTURE RECOMMENDATIONS