MDTA Capital Committee Meeting Materials

Wes Moore, Governor Aruna Miller, Lt. Governor Kathryn Thomson, Chairman Board Members: Dontae Carroll

Cynthia D. Penny-Ardinger

Jeffrey S. Rosen

Maricela Cordova William H. Cox, Jr.

Samuel D. Snead, MCP, MA

Mario J. Gangemi, P.E. John F. von Paris Bruce Gartner, Executive Director

MEMORANDUM

TO:

DEPUTY DIRECTOR OF PROJECT DEVELOPMENT, NAFIZ ALQASEM, P.E.

FROM:

ETL PROGRAM MANAGER, MEGAN PEAL, P.E.

SUBJECT:

CONTRACT NO. KH 3043-0000 MD 152 PARK AND RIDE RELOCATION

DATE:

SEPTEMBER 11, 2026

On September 10, 2026, six (6) bids were opened for the referenced Contract. The bid amounts were:

DXI Construction Inc. Allan Myers MD, Inc.

$4,768,367.85 $5,617,777.00 $6,386,190.00 $6,765,058.55 $7,171,210.75

• • • • • •

Urban N. Zink Contractor Inc. Pessoa Construction Company Inc.

Gray & Son, Inc

P. Flanigan & Sons, Inc. $9,366,684.00 The Engineer’s Estimate (EE) for this project is $6,066,753.75. The low bidder’s bid price is about 21% lower than the EE. An evaluation and justification of the bids was performed by the project team. The Engineer’s Estimate (EE) was $1,295,025.90 higher than DXI Construction Inc.’s bid. A review of the bid schedule determined that approximately $1.18 million of the variance is attributable to three earthwork items; Modified Common Borrow (Item 2001), Class 1 Excavation (Item 2002), and Class 2 Excavation (Item 2004). The Engineer’s Estimate for Item 2001, Modified Common Borrow, was $1,135,580.00 and DXI’s bid price is $428,681.45 for a difference of $706,898.55. Item 2002, Class 1 Excavation, was estimated at $600,640.00 and DXI’s bid price is $172,684.00 for a difference of $427,956.00. Item 2004, Class 3 Excavation, was estimated at $78,190.00 and DXI’s bid price is $28,483.50 for a difference of $49,706.50. The three earthwork quantities detailed above account for a total difference of $1,184,561.05 which accounts for nearly all of the $1,295,025.90 variance between the engineers estimate and DXI’s bid price. DXI is currently working on an adjacent MDTA project with significant earthwork. A possible reason for the variance in these three bid items is that the company already has existing crews and equipment in place for the earthwork and an existing stockpile of Modified Common Borrow that would allow them to bid lower than other Contractors on these major earthwork items.

2310 Broening Highway • Baltimore, MD 21224 • mdta@mdta.maryland.gov • 410.537.1000 • 711 (MD Relay) • mdta.maryland.gov • ezpassmd.com