I. INTRODUCTION | 4 |
I.A PURPOSE OF TEST | 4 |
I.B LABORATORY | 4 |
I.C DESCRIPTION OF UNIT | 4 |
I.D REPORT ORGANIZATION | 5 |
II. SUMMARY | 5 |
II.A PRETEST INFORMATION | 5 |
II.B INFORMATION LOG | 6 |
II.B(1) TEST STANDARD | 6 |
II.B(2) Deviation from Standard Method | 6 |
II.C SUMMARY OF TEST RESULTS | 6 |
II.D DESCRIPTION OF TEST RUNS | 6 |
II.D SUMMARY OF OTHER DATA | 7 |
TABLE 1. – Data Summary Part A | 7 |
TABLE 3. – WEIGHTED AVERAGE | 8 |
TABLE 5. - GENERAL SUMMARY OF RESULTS | 8 |
III. PROCESS DESCRIPTION | 9 |
III.A TEST SET-UP DESCRIPTON | 9 |
III.B AIR SUPPLY SYSTEM | 9 |
III.C TEST FUEL PROPERTIES | 9 |
IV. SAMPLING SYSTEMS | 9 |
IV.A. SAMPLING LOCATIONS | 9 |
IV.A.(1) DILUTION TUNNEL | 10 |
IV.B. OPERATIONAL DRAWINGS | 11 |
IV.B.(1) STACK GAS SAMPLE TRAIN | 11 |
IV.B.(2). DILUTION TUNNEL SAMPLE SYSTEMS | 12 |
V. SAMPLING METHODS | 12 |
V.A. PARTICULATE SAMPLING | 13 |
VI. QUALITY ASSURANCE | 13 |
VI.A. INSTRUMENT CALIBRATION | 13 |
VI.A. (1). DRY GAS METERS | 13 |
VI.A.(2). STACK SAMPLE ROTAMETER | 14 |
VI.A.(3). GAS ANALYZERS | 14 |
VI.B. TEST METHOD PROCEDURES | 14 |
VI.B.(1). LEAK CHECK PROCEDURES | 14 |
VI.B.(2). TUNNEL VELOCITY/FLOW MEASUREMENT | 15 |
VI.B.(3). PM SAMPLING PROPORTIONALITY | 15 |
VII. CONCLUSION | 15 |
Made with FlippingBook - professional solution for displaying marketing and sales documents online