Select Mesh Railing Installation Instructions

HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®

Installing Vertical Channels

Installing Bottom Channel

11

13

6' Section = Minimum 4 screws 8' Section = Minimum 5 screws

13. Center and install bottom channel using #8-18 x 1 1/4" self-drilling screws (provided), minimum 4 screws for 6' section and 5 screws for 8' section. Measuring and Cutting Top and Bottom Anti-Rattle Gaskets

11.  Center vertical channel between posts, and attach screws into channel using three #8-18 x 1/14" self- drilling screws (provided). Install lower and upper screws approximately 1" from each end of channel. Center and install remaining screws.

14

Measuring and Cutting Bottom and Top Channel

12

X+1"

12.  Align bottom and top channel so they run parallel to bottom rail, mark at location where these inter- sect with the side verticals, and cut both bottom and top channel to this length.

14.  Using same measurement from top/bottom

channels (see step 12, add 1" and cut top and bottom anti-rattle gaskets to this measurement).

NOTE: Both sides will have to be cut to accommodate angle.

5

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SMST-0125