HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®
Installing Vertical Channels
Installing Bottom Channel
11
13
6' Section = Minimum 4 screws 8' Section = Minimum 5 screws
13. Center and install bottom channel using #8-18 x 1 1/4" self-drilling screws (provided), minimum 4 screws for 6' section and 5 screws for 8' section. Measuring and Cutting Top and Bottom Anti-Rattle Gaskets
11. Center vertical channel between posts, and attach screws into channel using three #8-18 x 1/14" self- drilling screws (provided). Install lower and upper screws approximately 1" from each end of channel. Center and install remaining screws.
14
Measuring and Cutting Bottom and Top Channel
12
X+1"
12. Align bottom and top channel so they run parallel to bottom rail, mark at location where these inter- sect with the side verticals, and cut both bottom and top channel to this length.
14. Using same measurement from top/bottom
channels (see step 12, add 1" and cut top and bottom anti-rattle gaskets to this measurement).
NOTE: Both sides will have to be cut to accommodate angle.
5
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SMST-0125
Made with FlippingBook flipbook maker