TREX SELECT ® COMPOSITE STAIR MESH RAILING Installation Instructions
HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®
15a
13
6' Section = Minimum 4 screws 8' Section = Minimum 5 screws
Measuring and Cutting Mesh Panels 15b. Rest mesh panel on stair treads, and ensure mesh
15b
13. Center and install bottom channel using #8-18 x 1 1/4" self-drilling screws (C3).
Cutting Top Rail and Attaching Top Stair Brackets
14
panel is running parallel to bottom rail. Mark mesh where this intersects at inside of rails and posts.
14. C ut top rail at previous marked locations. Center top stair brackets on each end of TOP RAIL. Ensure back of bracket is flush with end of rail, and attach using three #8-18 x 1 1/4" self-drilling screws (C3).
6 15a. Clamp or loosely place top rail onto side channels.
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SMST-0726
Made with FlippingBook flipbook maker