HOW TO INSTALL MESH STAIR RAILING/ CONTINUED TREX SELECT ®
Measuring and Cutting Bottom and Top Anti-Rattle Gaskets
10b.Using same
10b
measurement from side verticals subtract 1 3/4" and cut side gaskets at same angles as the verticals.
12a
X minus 1-3/4"
12a. Align bottom and top channel so they run parallel to bottom rail, ensuring the opening on the channels are facing each other, mark at location where these intersect with the side verticals, and cut both bottom and top channel to this length.
Installing Vertical Channels
11
12b
X+1"
12b. Using same measurement and orientation from top/bottom channels, add 1" and cut top and bottom anti-rattle gaskets to this measurement.
11. Center vertical channel between posts, and attach screws into channel using three #8-18 x 1/14" self- drilling screws (C3). Install lower and upper screws approximately 1" from each end of channel. Center and install remaining screws.
NOTE: Both sides will have to be cut to accommodate angle.