Recommended Actions
Transportation Improvements
Utility Improvements
Vulnerability Improvements
• Causeway Boulevard to end – Complete street improvements including sidewalks and shared lane markings (pg. 34-35), pavement repair (preventative treatment) (pg. 24-26) • Causeway Boulevard to Madison Avenue – Complete street improvements including speed reduction and dedicated pedestrian and bike facilities (pg. 34- 35), and pavement repair (preventative treatment) (pg. 24-26)
• Causeway Boulevard to end – Sewer system extension (septic to sewer conversion), water system extension (pg. 42-43)
• Causeway Boulevard to end – Roadway flood exposure improvements, high criticality (pg. 53-65) • Progress Village Fire Station – Area flood exposure improvements • Causeway Boulevard to Madison Avenue – Roadway and area flood exposure improvements, high criticality (pg. 53-65)
70th Street Area
• Causeway Boulevard to Madison Avenue – Sewer system extension (septic to sewer conversion) (pg. 42-43)
78th Street Area
Next Steps • Complete detailed safety analysis of high crash areas identified in matrix • Complete hydraulic capacity analysis of water/sewer transmission mains, including coordination with City of Tampa based on collection and transmission systems ownership • Evaluate a combination of gray, green and blue infrastructure techniques to mitigate flood exposure • Coordinate with County departments, including Public Works, to identified ongoing projects and plans in the area • Further identify infrastructure project scopes and related funding sources, including public engagement and coordination with leading and coordinating agencies based on infrastructure and right-of-way ownership including: • Florida Department of Transportation • City of Tampa • CSX • Port Tampa Bay
70 Palm River Redevelopment Area Infrastructure Assessment Hillsborough County
Made with FlippingBook Learn more on our blog