11.2 Maintenance Schedule
11.2.1 Daily I nspection
11.2.1.1 Che ck exhaus t fo r visible d ust, r efe r to t roubleshooting. 11.2.1.2 Che ck compressed a i r system for air leakage (lo w p ressure) ; re p air as
necessary.
11.2.1.3 Empty d us t drawers.
11.2.2 Weekly I nspection
11.2.2.1 Inspe ct spar k baffles. Cle an if n ecessary.
11.2.3 Monthly I nspection
11.2.3.1 Che ck filte r cartridges for leaks a nd p rope r fastening; r ep air o r replace a s
necessary.
11.2.3.2 Open t he air t an k drain cock located u nde r the air t an k to exp e l a ny
condensation.
11.2.3.3 Che ck the co mpressed air lin e r egulator, d ryer, a nd filter for prope r operation .
(by o thers)
11.2.4 Three M onths
11.2.4.1 Che ck the fil te r cartridges. 11.2.4.2 Che ck all ele ctrical apparatus for prope r operation. 11.2.4.3 Che ck discharge air c ondition for s igns o f d ust.
Page 14
sales@clean-air.com
1-866-665-1829
www.clean-air.com
Made with FlippingBook Online newsletter maker