Figure 10: Conceptual Servicing Strategy of Candidate Location 2B at 6th Avenue Fairgrounds

Should an off-season drainage connection be incorporated into the final design, it could be routed to the municipal drainage system using a manually operated diversion valve but limited information is available on the drainage infrastructure in the parking lot adjacent to the site. The servicing to this location would likely require the shortest overall service connection lengths of all the candidate locations and additionally would require the least amount of disturbance to paved areas, minimizing pavement restoration costs. Overall, Candidate Location 2B can be serviced using existing municipal infrastructure with no significant servicing constraints identified at the feasibility stage. Final utility alignments and construction requirements will be confirmed during detailed design. 4. OPERATIONS AND MAINTENANCE REQUIREMENTS Once constructed, a spray park would require routine seasonal operation and maintenance similar to other municipal recreation assets. The level of maintenance depends largely on the mechanical system selected, with flow-through systems requiring simpler daily operation and recirculation systems requiring additional water treatment and monitoring.

Page 24

File: 5260-25

Made with FlippingBook - professional solution for displaying marketing and sales documents online