Spray Park Feasibility Study
August 5, 2026
District of Hope – Engineering Department
Version 1.0
existing water and sanitary sewer infrastructure, with final servicing requirements to be confirmed during detailed design.
The study also evaluated the capacity of the District's broader municipal infrastructure, including the gravity sewer network, Coquihalla Lift Station, Pollution Control Centre, and potable water supply. While a future spray park would increase seasonal demands on these systems, preliminary review indicates that the existing infrastructure can accommodate anticipated flows. Additional engineering analysis will be required during detailed design to confirm long-term system capacity and identify any required upgrades. Operational requirements were reviewed for both mechanical system types. Routine maintenance is expected to include seasonal startup and winterization, daily inspections, cleaning, and minor repairs. Recirculation systems require additional responsibilities related to water treatment, filtration, and regulatory water quality monitoring, while flow-through systems have simpler operational requirements and lower long-term maintenance demands. Public health and safety considerations were also assessed. Appropriate design features (including slip-resistant surfacing, regulatory signage, effective drainage, and routine inspections) can help provide a safe and enjoyable environment for park users. Spray parks are regulated as public pools under Fraser Health, and the selected design will require regulatory review and operating approval prior to construction and operation. Beyond technical feasibility, a spray park has the potential to provide significant recreational and community benefits. It would create a free, inclusive outdoor recreation opportunity that supports healthy lifestyles, encourages family gathering, enhances accessibility, and contributes to Hope's parks and recreation network. Site-specific considerations, including parking, community events, accessibility, and compatibility with existing park uses, should continue to be evaluated during future planning. The candidate locations identified in this study are conceptual and intended to support feasibility analysis only. Final site selection will be subject to future Council direction, public engagement, detailed design, and funding considerations. Based on the findings of this study, the development of a spray park in the District of Hope is considered technically feasible. While each candidate location presents unique opportunities and design considerations, no significant technical barriers were identified that would prevent the project from moving forward.
Page 3
File: 5260-25
Made with FlippingBook - professional solution for displaying marketing and sales documents online