A PROJECT FOR:
T OWN of W AKE F OREST P ARKS , R ECREATION & C ULTURAL R ESOURCES A C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS D esign W orkbook
July 15, 2020
L andscape A rchitecture by :
A rt D irection B y :
421 F ayetteville S t . S uite 600 R aleigh , NC 27601 919. 835.1494
4319 M c C amey D rive M atthews , NC 28104 704.322.3094
301 S. B rooks S t . W ake F orest , NC 27587 919.435.9560
T able of C ontents D esign W orkbook A cknowledgements S ummary C olors , S ymbols , & T ypography
i
ii
iii
S ign D etails
C
A
A.1.0 A.2.0 A.3.0 A.4.0
C olors & T ypography A menity S ymbols R egulatory S ymbols A rtwork
C.1.0 C.1.0
p aver e Dge r esTrainT p osT C ap C onCreTe p aver s ign s urrounD
C.2.0 C.2.0 –C.2.2
C onCreTe p aver s ign s urroun DS ON G REENWAY C ONCRETE P AVER S IGN S URROUNDS ON S IDEWALK C onCreTe f ooTing T AMPER R ESISTANT H ARDWARE
S ign T ypes
C. 3 .0 C.3.0 C. 4 .0
B
B.1.0 – B.1.1 B. 2.0 – B.2.1 B. 3.0 B.8.0 – B.8.1 B.4.0 B.5.0 B.6.0 B.7.0 – B.7.1
p ark e nTranCe s ign (e1) g reenWay e nTranCe s ign (e2)
a meniTy i.D. s ign (a1) a meniTy i.D, s ign (a2) a meniTy i.D. s ign (a3) a meniTy i.D. s ign (a4) a meniTy i.D. s ign (a5) D ireCTional s ign (D1) r ules & r egulaTions s ign (r1) D og p ark r ules & r egulaTions s ign (r2) r ules & r egulaTions s ign (r3) r egulaTory s ign (r4) i nformaTion s ign (i1) m ileage m arker (mm1) m ileage m arker (mm2) i nTerpreTive s ign (l1) s Top & n o m oTor v ehiCles s ign (g1 & g2) b anner s ign (b1)
s ign L OCATION M APS — PARKS
D
D.2.0–D.13.0 D .1.0
S IGN L OCATION M AP I NSTRUCTIONS p ARKS
s ign L OCATION M APS — GREENWAYS
E
B.9.0 – B.9.1 B.10.0 – B.10.1 B. 11.0 – B.11.1 B. 12.0 C. 13.0 – B.13.1 B. 14.0 B.15.0 B. 16.0 – B.16.1 B. 17.0 B.18.0 B.19.0 –B.19.1
G REENWAYS
E.1.0–E.4.0
s ign M ESSAGING
F
F.2.0–F.2.2 F.1.0–F.1.6
P ARKS G REENWAYS
e mergenCy s ign (em1 & EM2 ) C learanCe W arning s ign (W1) s lippery W arning s ign (W2)
B.20.0 B.21.0 B.22.0 B.23.0 B.24.0
m ileage m arker (mm3) T RAILHEAD M ARKER ( E3 ) D ONOR s ign ( F1 )
i
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
A cknowledgements T own of W ake F orest Vivian A. Jones, Mayor
C onsultants K imley -H orn & A ssociates , I nc . Sal Musarra, Principal-in-Charge Brandon White, Project Manager Trung Vo Melissa Moeller
B oard of C ommissioners Zachary Donahue
Jim Thompson Greg Harrington Anne M. Reeve Margaret Stinnett
D awa , I nc . Kirk Lohry
P roject C ore C ommittee Project Manager: Candace Davis, Senior Planner (Transportation) - Planning Department
Jan Ammons, Chair – Greenway Advisory Board Jim Hirschfield – Public Artist Randy Hoyle, Maintenance Crew Supervisor – Parks, Recreation & Cultural Resources Sonya Ishii – Public Artist Bess Martinson, Communications Specialist – Communications Department Michelle Michaels, Senior Planner (Historic Preservation) - Planning Department Holly Miller, PE, Assistant Town Engineer – Engineering Department John Pelosi, Chair - Public Art Commission Chris Ray – Greenway Advisory Board Pamela Stevens, Renaissance Centre Manager – Parks, Recreation & Cultural Resources Jimmy Thrift, Park Maintenance Superintendent – Parks, Recreation & Cultural Resources Terry Trummer – Greenways Advisory Board Ruben Wall, Director – Parks, Recreation & Cultural Resources Jim Wallace – Public Art Commission
ii
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
S ummary The Comprehensive Wayfinding Plan for Parks and Greenways will establish an overall signage and wayfinding system to improve visitors experience to Wake Forest by assisting them in reaching their desired destination, increasing the visibility of the Town’s park system through the preservation of the Wake Forest Parks, Recreation, and Cultural Resources brand, and strengthening the community’s sense of place. The Town of Wake Forest currently has 12 parks and 12.7 miles of greenway within the Town limits and unincorporated areas. These parks are maintained by the Town’s Parks, Recreation, & Cultural Resources Department. Recently, the Town identified the need to develop a wayfinding program as a part their overall vision in their adopted Master Parks & Recreation Plan and Open Space & Greenways Plan. Kimley-Horn & Associates, along with Dawa, Inc. (Design Team), was retained by the Town of Wake Forest to assess the Town’s park system signage and develop a new comprehensive wayfinding plan working with Town staff, the Project Core Committee, and the public artists, Jim Hirshfield and Sonya Ishii. The core committee included members from the Town’s Public Art Commission (PAC), Greenways Advisory Board (GAB), and Parks, Recreation, & Cultural Resources Advisory Board (PRCR). The Design Workbook is a comprehensive wayfinding system for the Town of Wake Forest’s parks and greenways. It is intended to be used as a guide for all future signage implementation and will, undoubtedly, grow with the Town over time.
iii
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
C olors , S ymbols , & T ypography
A
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
D igital G raphics
V inyl C olors
P1
V1
O racal
O racal 010 8800 Translucent Premium Cast
MP
070 Black Opaque Premium Cast
L ANDSCAPE A RCHITECTURE BY :
V1.5
V1.1
D1.1
O racal 331 951 Opaque Premium Cast
O racal
MP
031 Red Reflective Premium Cast
A RT D IRECTION BY:
V1.4
V1.2
D1.2
P aint C olors
O racal 5700 010 White Reflective Engineering Grade
P1
V1.3
C olors , S ymbols , & T ypography
Pantone 357C Forest Green
Pantone 144C Sun Orange
Pantone C
Yellow
P1.3
P1.5
P1.1
C olors & T ypography
Pantone 294C
Pantone 368C Grass Green
RAL 8007
N otes :
Blue
Brown
P1.4
P1.2
P1.6
T ypography
T1
T 1.1
T 1.6
T1. 2
D irectional S ymbols
S1
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
T1. 3
S1.1
S1.5
S1.2
T1. 4
7
S cale :
-
S1.3
T1. 5
S1.4
A.1.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
A menity S ymbols
S 2
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
R estrooms
P layground
B aseball
S 2.1
S 2.7
S 2.13
C olors , S ymbols , & T ypography
A menity S ymbols
T ennis / P ickle B all
D og P ark
S 2.2
S 2.8
F ishing
S 2.14
N otes :
F lower G arden
B iking
S 2.3
S 2.9
S occer
G reenway
S 2.4
S 2.10
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
B asketball
P icnic A reas
S 2.5
S 2.11
7
S cale :
-
S wimming
G rills
A.2.0
S 2.6
S 2.12
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
R egulatory S ymbols
S 3
L ANDSCAPE A RCHITECTURE BY :
C lean U p A fter D ogs
F ires P rohibited
L ock Y our V ehicle
A RT D IRECTION BY:
S 3.1
S 3.14
S 3.8
C olors , S ymbols , & T ypography
W ear a H elmet
D ispose of L itter P roperly
M otor B oats P rohibited
R egulatory S ymbols
S 3.9
S 3.2
S 3.15
N otes :
R un / W alk with a B uddy
O pen D awn until D usk
S wimming P rohibited
S 3.3
S 3.10
S 3.16
S lippery when W et
K eep P ets L eashed
S 3.4
S 3.11
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
S moking P rohibited
S 3.5
ADA A ccessible
S 3.12
7
S cale :
-
A lcohol P rohibited
G rills P rohibited
A.3.0
S 3.7
S 3.13
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
A rtwork A 1
L ANDSCAPE A RCHITECTURE BY :
V ariations :
A RT D IRECTION BY:
C olors , S ymbols , & T ypography A rtwork
A1.1
A1.2
A1.3
T own of W ake F orest
N otes :
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
-
A.4.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
S ign T ypes
B
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
P ark E ntrance S ign (E1)
P1.3
N otes :
T1.4
V1.5 M1
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.).
V1.5
P1.1
T1.4
V1.3 M2
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
F ront & B ack E levation
S ide E levation
S ide E levation (S treet S ide )
7
S cale :
1/2”=1’-0”
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
B.1.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
P lan
S ign T ypes
P ark E ntrance S ign (E1)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). SIGNAGE DETAILS SHOWN FOR REFERENCE ONLY. CONTRACTOR TO SUBMIT SHOP DRAWINGS SIGNED BY LICENSED ENGINEER FOR APPROVAL BY TOWN OF WAKE FOREST PRIOR TO FABRICATION AND INSTALLATION OF SIGN.
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
1/2”=1’-0”
F ront & B ack S ection
S ide S ection
S ide S ection (S treet S ide )
B.1.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
T1.4 V1.3 M3
E ntrance S ign (E2)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.).
P1.3
T1.4
V1.5 M1
V1.3 M2 T1.4
P1.1
A1.3 D1.1
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
F ront & B ack E levation
S ide E levation
S ide E levation (S treet S ide )
7
S cale :
1/2”=1’-0”
B.2.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
P lan
A RT D IRECTION BY:
S ign T ypes
E ntrance S ign (E2)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). SIGNAGE DETAILS SHOWN FOR REFERENCE ONLY. CONTRACTOR TO SUBMIT SHOP DRAWINGS SIGNED BY LICENSED ENGINEER FOR APPROVAL BY TOWN OF WAKE FOREST PRIOR TO FABRICATION AND INSTALLATION OF SIGN.
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
1/2”=1’-0”
B.2.1
F ront & B ack S ection
S ide S ection
S ide S ection
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
T1.1
V1.2
M1
A menity I.D. S ign (A1)
P1.1
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
V1.2 M2
T1.1
A1.3 D1.1
P1.1
P anel E nlargement S cale : 1”=1’-0”
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.2
V1.2 S
P1.6
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
B ack E levation
S ide E levation
B.3.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
S ign T ypes
A menity I.D. S ign (A2)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
T1.1 V1.2 M1
P1.1
I ssue : 1 2 3 4 5 6
A1.3 D1.1
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
V1.2 M2 T1.1
F ront E levation
7
S cale :
1”=1’-0”
B.4.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
A menity I.D. S ign (A3)
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
V1.2 M1
T1.2
P1.1
V1.2
T1.2
P1.1
A1.3 D1.1
P anel E nlargement S cale : 1”=1’-0”
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.2
V1.2
S
EM1 M2
P1.3
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
B ack E levation
S ide E levation
B.5.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
A menity I.D. S ign (A4)
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.1
T1.2 V1.2
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
A1.3 D1.1
F ront E levation
7
S cale :
1”=1’-0”
B.6.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
A RT D IRECTION BY:
S ign T ypes
A menity I.D. S ign (A5)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
V1.2 M1 T1.1
A1.3 D1.1
P1.1
P anel A E nlargement S cale : 1”=1’-0”
P1.2
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
S
V1.2
EM1 M2
7
P anel B E nlargement S cale : 1”=1’-0”
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
XB.37.02
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
S ign T ypes
A menity I.D. S ign (A5)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.1
P1.3
P1.3
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.4 EM1
7
S cale :
3/4”=1’-0”
B ack E levation
S ide E levation
B.7.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
L ANDSCAPE A RCHITECTURE BY :
V1.3
S.1.2
M2
A RT D IRECTION BY:
M4
V1.2
T1.2 M1
S ign T ypes
P1.1
D irectional S ign (D1)
M3
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, SHALL BE PLACED ON THE SIGN AS SHOWN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
S1.1 V1.2
B lade E nlargement S cale : 1”=1’-0”
V1.2
T1.2
M5
M6
I ssue : 1 2 3 4 5 6
M7
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.2
EM1 M8
P anel E nlargement S cale : 1”=1’-0”
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
T ypical E xample of E. C arroll J oyner L oop T rail W ayfinding S cale : 1”=1’-0”
XB.83.02
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
P1.1
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
M4
M3
T1.2 V1.2
S ign T ypes
M2
P1.1
M1
D irectional S ign (D1)
P1.3
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, SHALL BE PLACED ON THE SIGN AS SHOWN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.2
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
EM1
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
B.8.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
L ANDSCAPE A RCHITECTURE BY :
V1.2
T1.1
A RT D IRECTION BY:
S ign T ypes
R ules & R egulations S ign (R1)
T1.2 V1.2
N otes :
SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). RULES AND REGULATIONS SHOWN FOR GRAPHIC PURPOSES ONLY. FINAL MESSAGE TO BE PROVIDED BY THE TOWN OF WAKE FOREST PRIOR TO FABRICATION OF SIGN. ALL TEXT, REGARDLESS OF MESSAGE, SHALL BE PLACED ON THE SIGN AS SHOWN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.2
P1.1
P anel A E nlargement S cale : 1”=1’-0”
I ssue : 1 2 3 4 5 6
S
V1.2
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
EM1
P anel B E nlargement S cale : 1”=1’-0”
7
P1.6
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
XB.93.02
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
S ign T ypes
R ules & R egulations S ign (R1)
N otes :
SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). RULES AND REGULATIONS SHOWN FOR GRAPHIC PURPOSES ONLY. FINAL MESSAGE TO BE PROVIDED BY THE TOWN OF WAKE FOREST PRIOR TO FABRICATION OF SIGN. ALL TEXT, REGARDLESS OF MESSAGE, SHALL BE PLACED ON THE SIGN AS SHOWN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.1
P1.3
P1.3
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.4 EM1
7
S cale :
3/4”=1’-0”
B ack E levation
S ide E levation
B.9.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
A RT D IRECTION BY:
V1.2
T1.1
S ign T ypes
D og P ark R ules & R egulations S ign (R2)
N otes :
SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). RULES AND REGULATIONS SHOWN FOR GRAPHIC PURPOSES ONLY. FINAL MESSAGE TO BE PROVIDED BY THE TOWN OF WAKE FOREST PRIOR TO FABRICATION OF SIGN. ALL TEXT, REGARDLESS OF MESSAGE, SHALL BE PLACED ON THE SIGN AS SHOWN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.1
T1.2 V1.2
P anel A E nlargement S cale : 1”=1’-0”
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
S
V1.2
EM1
7
S cale :
3/4”=1’-0”
P anel B E nlargement S cale : 1”=1’-0”
F ront E levation
S ide E levation
BX.1.30..20
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
D og P ark R ules & R egulations S ign (R2)
N otes :
SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). RULES AND REGULATIONS SHOWN FOR GRAPHIC PURPOSES ONLY. FINAL MESSAGE TO BE PROVIDED BY THE TOWN OF WAKE FOREST PRIOR TO FABRICATION OF SIGN. ALL TEXT, REGARDLESS OF MESSAGE, SHALL BE PLACED ON THE SIGN AS SHOWN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.1
P1.3
P1.3
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
EM1 P1.4
7
S cale :
3/4”=1’-0”
B ack E levation
S ide E levation
B.10.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
A RT D IRECTION BY:
S ign T ypes
R ules & R egulations S ign (R3)
V1.2 T1.2
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.1
A1.3 D1.1
P anel A E nlargement S cale : 1”=1’-0”
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
S
V1.2
EM1
7
P anel B E nlargement S cale : 1”=1’-0”
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
BX..131..20
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
R ules & R egulations S ign (R3)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.1
P1.3
P1.3
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.4 EM1
7
S cale :
3/4”=1’-0”
B ack E levation
S ide E levation
B.11.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
R egulatory S ign (R4)
N otes :
T1.2 V1.2
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
A1.3 D1.1
P anel E nlargement S cale : 1”=1’-0”
P1.1
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.3
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
B ack E levation
S ide E levation
B.12.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
A RT D IRECTION BY:
S ign T ypes
V1.2 T1.1
I nformation S ign (I1)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.2
P1.3
P1.1
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P anel E nlargement S cale : 1”=1’-0”
EM1
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
B.13.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
S ign T ypes
I nformation S ign (I1)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.3
P1.1
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.3
7
S cale :
3/4”=1’-0”
B ack E levation
S ide E levation
B.13.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
M ileage M arker (MM1)
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
A1.3 D1.1
V1.3 M1
T1.1
P1.3
P1.3
M2 V1.2 T1.2
P lan V iew
E levation B & C E nlargement S cale : 1”=1’-0”
V1.3
T1.1
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
M3
P1.4
E levation A E nlargement S cale : 1”=1’-0”
7
S cale :
3/4”=1’-0”
B.14.0
E levation A (F acing G reenway )
E levation B & C (F acing D irection of T ravel )
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
V1.3 M1
T1.1
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
P1.3
S ign T ypes
P1.3
M ileage M arker (MM2)
E levations B & C E nlargement S cale : 3”=1’-0”
A1.3 D1.1
P lan V iew
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
P1.3
V1.3
T1.1
P1.4
M1
E levation A E nlargement S cale : 3”=1’-0”
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
3/4”=1’-0”
BX.1.35..20
E levation B
E levation A (G reenway S ide )
E levation C
E levation D
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
P1.2
S ign T ypes
I nterpretive S ign (L1)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
S ide E levation
B ack E levation
P1.2
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P anel E nlargement S cale : 1”=1’-0”
7
S cale :
3/4”=1’-0”
S ide E levation
F ront E levation
B.16.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
I nterpretive S ign (L1)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
F ront L eft P erspective
F ront R ight P erspective
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
-
B ack R ight P erspective
B ack L eft P erspective
B.16.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
S ign T ypes
S top & N o M otor V ehicles S ign (G1 & G2)
G2 E nlargement S cale : 1”=1’-0”
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
V1.3
G1
G2
P1.1
V1.3
T1.2 V1.3
G1
V1.4
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.3
P1.3
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
F ront E levation
S ide E levation
B.17.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
L ANDSCAPE A RCHITECTURE BY :
T1.1
V1.2 M1
A RT D IRECTION BY:
P1.1
S ign T ypes
T ypical F ront E levation (E xample A)
B anner S ign (B1)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
T ypical F ront E levation (E xample A)
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
B ack E levation
S cale :
3/4”=1’-0”
BX.1.38..20
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
P1.4
S ign T ypes
E mergency S ign (EM1)
M1
V1.3 T1.1
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
F ront E levation
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
3”=1’-0”
B ack E levation
S ide E levation
B.19.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
E mergency S ign (EM2)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
EM1
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
P1.6
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
B.24.0 .19 1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
S ign T ypes
C learance W arning S ign (W1)
P1.1
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
T1.2 V1.3
P1.3
P1.5
E nlargement S cale : 1”=1’-0”
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
3/4”=1’-0”
F ront E levation
B ack E levation
S ide E levation
B.20.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
S ign T ypes
S lippery W arning S ign (W2)
P1.1
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
V1.3
P1.3
P1.5
E nlargement S cale : 1”=1’-0”
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
3/4”=1’-0”
F ront E levation
B ack E levation
S ide E levation
B.21.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
A RT D IRECTION BY:
S ign T ypes
M ileage M arker (MM3)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
M1
T1.1
V1.3
M2
T1.2
V1.3
A1.3
D1.1
I ssue : 1 2 3 4 5 6
F ront E levation
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
3”=1’-0”
B.22.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
T railhead M arker (E3)
N otes :
MESSAGES AND SYMBOLS SHOWN FOR GRAPHIC PURPOSES ONLY, SEE MESSAGE SCHEDULE FOR ACTUAL MESSAGING AND SYMBOLS (TYP.). ALL TEXT, REGARDLESS OF MESSAGE, IS TO BE CENTERED ON THE SIGN AND SIZED TO FILL THE SIGN AREA PROPORTIONALLY.
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
3/4”=1’-0”
F ront E levation
F ront E levation
S ide E levation
S ide S ection
B.23.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
S ign T ypes
SIGN NOTES: 1. TAMPER RESISTANT HARDWARE REQUIRED (SEE C.4.0) 2. ANTI-GRAFFITI LAMINATE TO BE USED ON SIGN PANELS
D onor S ign (F1)
N otes :
ARTWORK TO BE PROVIDED BY THE TOWN OF WAKE FOREST.
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
E nlargement S cale : NTS
P1.6
7
S cale :
3/4”=1’-0”
F ront E levation
S ide E levation
B.24.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
S ign D etails
C
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
D etails
D etails
N otes :
DETAILS SHOWN FOR REFERENCE ONLY. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO THE TOWN OF WAKE FOREST FOR APPROVAL PRIOR TO CONSTRUCTION.
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
-
C.1.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
D etails
D etails
N otes :
DETAILS SHOWN FOR REFERENCE ONLY. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO THE TOWN OF WAKE FOREST FOR APPROVAL PRIOR TO CONSTRUCTION.
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
-
D esign I ntent scale : not to scale
C.2.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
D etails
TURF
D etails
GRAVEL
N otes :
DETAILS SHOWN FOR REFERENCE ONLY. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO THE TOWN OF WAKE FOREST FOR APPROVAL PRIOR TO CONSTRUCTION.
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
CONCRETE PAVER D1 SIGN SURROUND ON GREENWAY
7
C.2.1
S cale :
-
C.2. 1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
D etails
D etails
N otes :
DETAILS SHOWN FOR REFERENCE ONLY. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO THE TOWN OF WAKE FOREST FOR APPROVAL PRIOR TO CONSTRUCTION.
2
C.2. 2 1
I ssue : 1 2 3 4 5
C.2. 2
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 0 6 . 24 .20 16 0 7 . 15 .20 20
7 6
S cale :
-
C.2. 2
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
D etails
D etails
N otes :
DETAILS SHOWN FOR REFERENCE ONLY. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO THE TOWN OF WAKE FOREST FOR APPROVAL PRIOR TO CONSTRUCTION.
I ssue : 1 2 3 4 5 6
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 06.24.2016 0 7 . 15 .20 20
7
S cale :
-
SIGN SURROUND ON SIDEWALK
C.3.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
L ANDSCAPE A RCHITECTURE BY :
A RT D IRECTION BY:
D etails
D etails
N otes :
DETAILS SHOWN FOR REFERENCE ONLY. CONTRACTOR TO SUBMIT SHOP DRAWINGS TO THE TOWN OF WAKE FOREST FOR APPROVAL PRIOR TO CONSTRUCTION.
I ssue : 1 2 3 4 5
12.15.2014 09.11.2015 10.09.2015 11.24.2015 12.10.2015 0 6 . 24 .20 16 0 7 . 15 .20 20
7 6
TAMPER RESISTANT HARDWARE
C .4.0 1
S cale :
-
PLAN
C. 4 . 0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
S ign L ocation M aps : P arks
D
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
S ign L ocation M ap I nstructions T his sign location map uses a specific code system . T he first part of the code is a series of letters denoting the name of the park where the signs are to be located . T he second part of the code is a series of numbers standing for the number of the sign . T he final part of the code is a series of letters and numbers that indicates the sign type at that location . refer back to section b for additional information on sign type .
REGULATORY SIGN AMENITY I.D. SIGN ENTRANCE SIGN SIGNAGE LEGEND
LOOP LEGEND
FIELD & GARDEN FARM WEST MEADOW GARDEN EAST MEADOW
DIRECTIONAL SIGN INFORMATION SIGN INTERPRETIVE SIGN STOP & NO VECHICLES SIGN BANNER SIGN GREENWAY MILEAGE MARKER
D.1.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Ailey Young Park (AYP)
AYP, 100, E2
AYP, 102, R1 AYP, 106, I1
AYP, 104, D1
FIELD 1
D.2.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
E. Carroll Joyner Park (ECJ)
ECJ, 104, D1
ECJ, 110, R1
ECJ, 100, E1 ECJ, 102, G1 & G2 ECJ, 114, G1 & G2
ECJ, 106, R1 ECJ, 108, D1
ECJ, 112, D1
ECJ, 128, E2
ECJ, 116, R1
LOOP LEGEND
FIELD & GARDEN FARM WEST MEADOW GARDEN EAST MEADOW
SEE ENLARGEMENT ON SHEET D.3.1
ECJ, 118, D1
ECJ, 124, E2
ECJ, 126, R1
ECJ, 120, D1
ECJ, 122, MM2
D.3.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
E. Carroll Joyner Park (ECJ)
ECJ, 200, D1
ECJ, 198, D1
ECJ, 202, G1 & G2
ECJ, 186, G1 & G2
ECJ, 188, L1
ECJ, 196, D1
ECJ, 184, R4
ECJ, 190, D1
ECJ, 192, G1 & G2
LOOP LEGEND
ECJ, 182, R4
ECJ, 194, D1
ECJ, 178, G1 & G2
FIELD & GARDEN FARM WEST MEADOW GARDEN EAST MEADOW
ECJ, 180, R4
ECJ, 150, R4
ECJ, 152, R1
ECJ, 148, R4
ECJ, 144, G1 & G2
ECJ, 176, L1
ECJ, 170, A1
ECJ, 136, R1 ECJ, 142, D1
ECJ, 146, R4
ECJ, 140, MM2
ECJ, 174, L1
ECJ, 172, L1
ECJ, 138, G1 & G2
ECJ, 168, A1
ECJ, 154, D1
ECJ, 158, L1
ECJ, 156, A1
ECJ, 204, I1
ECJ, 160, A1
ECJ, 162, A1
RESTROOMS & PARKING
PERFORMANCE GARDEN
ECJ, 166, D1
ECJ, 164, A1
ECJ, 134, D1
ECJ, 132, D1
ECJ, 130, D1
D.3.1
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
H.L. Miller Park (HLM)
HLM, 100, E2
HLM, 102, R1 HLM, 110, I1
HLM, 104, R1
HLM, 106, R1 HLM, 108, E2
D.4.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Heritage High Park (HH)
FIELD 2 (ADA)
HH, 114, D1
HH, 104, A2
HH, 102, R1
HH, 116, R3
HH, 112, A1
HH, 110, A1
HH, 100, E1
HH, 108, D1
HH, 106, A2 HH, 118, I1
FIELDS 3 & 4
D.5.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Holding Park / Forrest Field (HF)
FORREST FIELD
HF, 106, D1
HF, 118, A5 HF, 102, R1
HF, 108, A1
HF, 100, E1
HF, 116, I1
HF, 114, A3
HF, 110, A1
HF, 104, A1
HF, 112, D1
D.6.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
J.B. Flaherty Park (JBF)
JBF, 104, E1
JBF, 144, A2
COMMUNITY CENTER
TENNIS COURTS
JBF, 142, A2
JBF, 146, R1 JBF, 140, A5
JBF, 102, D1
JBF, 138, D1
JBF, 100, E1
JBF, 106, A2 JBF, 108, R2
JBF, 110, I1
COMMUNITY CENTER
JBF, 112, A2 JBF, 114, R2
JBF, 130, D1
JBF, 116, A1
JBF, 126, R1
JBF, 128, I1
JBF, 118, A2 JBF, 120, A4
JBF, 136, A3
JBF, 122, A2 JBF, 124, A4
JBF, 132, A2 JBF, 134, A4
D.7.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Kiwanis Park & Greenway (KIW)
KIW, 100, E2
KIW, 102, R1
KIW, 114, A3
KIW, 112, E2
KIW, 110, R1 (LOCATED AT APPROXIMATELY 1/8 MILE)
KIW, 108, MM2 (LOCATED AT APPROXIMATELY 1/4 MILE)
KIW, 116, I1
KIW, 104, E2
KIW, 106, R1 (LOCATED AT APPROXIMATELY 1/8 MILE)
D.8.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Plummer Park (PLU)
PLU, 100, E2
PLU, 102, R1
PLU, 104, I1
D.9.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
SCS, 100, E1
Smith Creek Trail Soccer Fields (SCS)
SCS, 106, D1
SCS, 102, R1
SCS, 108, A1
SCS, 120, I1
SCS, 104, R1
SCS, 116, MM2
SCS, 110, A1
SCS, 112, A1 SCS, 114, D1
SCS, 118, MM1 (NORTH SIDE OF EXISTING BRIDGE)
D.10.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Taylor Street Park (TAY)
TAY, 100, E2
TAY, 104, R1
TAY, 102, R1
TAY, 108, I1
TAY, 110, A1
TAY, 106, R1
D.11.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Tyler Run Park (TYL)
TYL, 100, E2
TYL, 102, R1
TYL, 110, A2 TYL, 114, I1
TYL, 108, R1
TYL, 106, A1
TYL, 112, A3
TYL, 104, E2
D.12.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Wake Forest Reservoir (WFR)
WFR, 132, MM2
WFR, 130, MM2
WFR, 128, MM2
WFR, 126, MM2
WFR, 124, MM2
WFR, 106, D1
WFR, 122, MM2
RESERVOIR SOFT TRL
WFR, 120, MM2
WFR, 114, MM2 WFR, 116, MM2 WFR, 118, MM2
WFR, 104, D1 WFR, 134, I1
WFR, 112, MM2
WFR, 110, MM2
WFR, 108, D1
WFR, 102, R1
SCALE: 1 : 2,000
RESERVOIR PARK
WFR, 100, E2
D.13.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
S ign L ocation M aps : G reenways
E
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Dunn Creek Greenway (DUN)
DUN, 116, MM1 DUN, 122, B1
DUN, 100, B1
DUN, 106, R1
DUN, 118, MM2
DUN, 104, D1 DUN, 102, E2
DUN, 124, I1
DUN, 108, MM1
HERITAGE GREENS DR
DUN, 114, R1 DUN, 120, MM2
DUN, 112, D1
DUN, 110, E2
E.1.0
C OMPREHENSIVE W AYFINDING P LAN FOR P ARKS AND G REENWAYS
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Page 55 Page 56 Page 57 Page 58 Page 59 Page 60 Page 61 Page 62 Page 63 Page 64 Page 65 Page 66 Page 67 Page 68 Page 69 Page 70 Page 71 Page 72 Page 73 Page 74 Page 75 Page 76 Page 77 Page 78 Page 79 Page 80 Page 81 Page 82Made with FlippingBook - professional solution for displaying marketing and sales documents online