District of Hope 2025 Annual Report

Utilities Water : We maintain four water systems, including 60 km of pipes and assets valued at $55 million. 87 m and 138 m pressure zones in the central area; Silver Creek; East Kawkawa Lake; Lake of the Woods Groundwater is the primary water source used by the District. One exception to this is the Lake of the Woods area, which is a small system using surface water.

For more information on the District of Hope water systems; please refer to the Water Master Plan, available on our website.

Sanitary Sewer : A $57 million system with 49 km of gravity pipes and 7 km of force mains, with upgrades spanning decades. The existing wastewater collection and treatment system has been constructed in the period since the early 1960's. Some key dates in the development of the system include: 1960's First sewers constructed in the Town of Hope. 1970's Trunk sewer constructed to a new treatment plant in Silver Creek. Sewers constructed in the Kawkawa Lake area. 1980's Sewers constructed in Silver Creek. 1980's Construction of original Pollution Control Centre and outfall. 1993 District takes responsibility for the Pollution Control Centre. 1999 Third treatment cell added at the Pollution Control Centre. 2017 Pollution Control Centre lagoons re-configured and aeration replaced. 2018 Dissolved air flotation system constructed at Pollution Control Centre.

Aerated Treatment Lagoons Desludging

Aerated Treatment Lagoons Desludging

For more information on the District of Hope Sanitary Sewer System; please refer to the Sanitary Sewer Master Plan, available on our website.

31

Made with FlippingBook Digital Proposal Creator