Kawkawa Lake Forrest Crescent culvert replacement at Thacker Creek in 2025. This important infrastructure upgrade was 100% funded through a provincial grant and improves stormwater capacity during extreme weather events, strengthening the community’s long- term climate resilience in alignment with the District’s Stormwater Master Plan. Forrest Crescent Culvert Replacement (Completed) Following damage caused by the 2021 atmospheric river event, the District completed the Stormwater The District of Hope is responsible for managing a complex and aging stormwater system valued at approximately $28 million. It includes nearly 37 km of storm pipe, hundreds of manholes and catch basins, and around 50 discharge points such as outfalls, rock pits, and infiltration areas. This infrastructure is essential for protecting the community from flooding, erosion, and environmental damage.
Anderson Park
Replacement Culvert
Planning for the Future The Stormwater Master Plan (2022) recommends a combination of capital upgrades and policy changes to address aging infrastructure and increasing climate pressures. With a current infrastructure deficit estimated at $6.5 million, continued investment and innovation are essential to ensure long-term system resilience.
For more information, please visit our website to view the Stormwater Master Plan.
32
Made with FlippingBook Digital Proposal Creator