Modern Methods of Construction Awards Guide

PROJECT OF THE YEAR – EDUCATION (SECONDARY AND HIGHER)

The shortlisted entry and why they should win...

Chilmington Green School - Stride Treglown

Chilmington Green School exemplifies MMC leadership, integrating pioneering offsite timber MMC systems, passivedesign, and renewables with an innovative thermal labyrinth beneath the teaching block. The project has achieved significant embodied carbon savings, proving MMC’s power for creating high-performance,sustainable, and inspiring learning spaces with exceptional efficiency and community benefit. Leeds City College - McAvoy Leeds City College Park Lane showcases how modular construction can deliver sustainable, high-performanceeducation environments at speed and scale. Combining digital innovation, social value and exemplary collaboration,the project has created a future-ready facility that is transforming student learning and providing new opportunitiesfor students in a deprived area. impact on the local community is significant, providing vital educationcapacity where it is needed most, while minimising carbon, disruption and environmental impact. Ground- breakingengineering and sensitive design ensure the building stands out through performance, while fitting seamlessly intoits setting. Largest temporary school in company’s history - Premier Modular A challenging project in terms of scale and complexity, the team worked tirelessly to navigate DfE requirements,technical specifications and site restrictions, without compromising on safety or sustainability. Innovation andcollaboration were vital to delivering the largest rental school in Premier Modular’s history while ensuring Middlesbrough College - Pickerings Hire Do not judge this project by its size. Its

SHORTLIST CONTINUES...

#MMCAwards awardsmmc.com

Made with FlippingBook Annual report maker