Workwear MANUAL

Delivery Lead times

China typically 4 months from placement of order using existing fabric and design includes shipping and clearance at port. Fiji 1- 2 months depending on fabric availability Any new developments in fabric and design follow the new style development process and would take much longer dependant on the product.

In work wear we offer a range of fabric and GSM (Grams per Square Metre) options:

Fabric Construction – Fabric construction defines the most basic elements of a fabric’s structure. It specifies whether it is a (knit, woven, or non- woven), type of structure. Additionally, the specification includes both size and weight.

P a g e 5 | 42

Made with FlippingBook flipbook maker