Ardmac Commercial & Industrial

30

CASE STUDY Boston Scientific, Clonmel

Client:

Boston Scientific Clonmel, Meath

Location:

Project Size:

80,000 sqft 24 weeks

Duration:

As part of Boston Scientific’s ongoing expansion at its Life Sciences Facility in Clonmel, Ardmac was appointed as the construction partner to transform fallow first- floor space within the Administration Building into a vibrant, multifunctional work environment. The project supported the client’s strategic objectives: to enhance staff amenities, expand lab and production areas, and improve circulation routes connecting new and existing spaces via the atrium and reception. The transformation delivered a high-spec, agile workspace aligned with Boston Scientific’s global workplace strategy. Previously unused floor area was reimagined to include open-plan offices, collaborative meeting zones, a Townhall-style canteen, and flexible working areas. Biophilic design elements, acoustic enhancements such as felt wall panels and baffles, and a white noise system were integrated to foster employee well-being and ensure privacy in a dynamic, open-plan setting. Ardmac also delivered a striking new entrance to the Administration Building, improving accessibility and creating a seamless connection between old and new areas. Executed within a live pharmaceutical facility, the works demanded full GMP compliance and minimal disruption to operations.

Ardmac’s experience in controlled environments, paired with its SMART project delivery methods, ensured the highest standards of quality and safety throughout. The fit-out included raised access flooring, new partitions, ceilings, specialist joinery, acoustic treatments, and full integration of client direct packages—AV, IT, and security systems—through detailed coordination and real-time communication tools. Impressed by Ardmac’s precision and consistent delivery, Boston Scientific extended the contract to include the construction of new cleanroom spaces and a circulation corridor. The success of this project not only reflects Ardmac’s capability to deliver within complex, live environments but also solidifies their role as a trusted long-term partner on Boston Scientific’s evolving Clonmel campus. “I wanted to thank each and every one of you for everything you done throughout the project and delivering a very special space on time. The feedback from employees has been unbelievable all week. All your hard work and effort was really appreciated.’

- Shane Walsh, Boston Scientific

Made with FlippingBook - professional solution for displaying marketing and sales documents online