TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

NOTES: » TREX SIGNATURE ® RAILINGS ARE DESIGNED TO BE ATTACHED WITH POSTS INSTALLED AT A CLEAR SPAN OF 6' (1.83 M) OR 8' (2.44 M). » IF INSTALLING AT EXACT SPAN LENGTHS OF 6' (1.83 M) OR 8' (2.44 M), AND USING POST-TO-POST CONFIGURATION, THE BOTTOM RAIL WILL NOT NEED TO BE CUT, BUT THE TOP RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. » IF INSTALLING AT EXACT SPAN LENGTHS OF 6' (1.83 M) OR 8' (2.44 M), AND USING CROSSOVER POST CONFIGURATION (SPANS FROM ONE CROSSOVER POST TO ANOTHER CROSSOVER POST), BOTH THE BOTTOM RAIL AND TOP RAIL WILL NOT NEED TO BE CUT. » IN ADDITION, AT ALL FINAL END POST CONFIGURATIONS, TOP RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. » A LL TREX SIGNATURE ® SPANS OVER 6' WILL REQUIRE THE USE OF A FOOT BLOCK. THUS THESE RAILING SPANS MUST BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. Trex Signature ® Posts (black only) can also be purchased with brackets installed, eliminating steps 1-4 in instructions. Sku numbers are as follows: SCAN QR CODE IF INSTALLING COCKTAIL RAIL APPLICATIONS WITH TREX METAL RAILING SYSTEMS.

SKU NUMBER DESCRIPTION BKAL252537RCAPCNR2G Signature Post 37" Corner Post BKAL252537RCAPEND2G Signature Post 37" End Post BKAL252537RCAPLINE2G Signature Post 37" Inline Post

SKU NUMBER

DESCRIPTION

BKAL252543RCAPCNR2G BKAL252543RCAPEND2G

Signature Post 43" Corner Post

Signature Post 43" End Post BKAL252543RCAPLINE2G Signature Post 43" Inline Post

BALUSTER OPTIONS

PARTS

K

K

C

A

P

I

I

D

F

E

J

Square Round

B

H

G

DETERMINING BALUSTERS NEEDED

H

L

Baluster Type Per 6' Section Per 8' Section Square 15 20 Round 15 20

N

M

O

NOTE: THIS IS AN OVERVIEW OF ALL RAILING COMPONENTS FOR TREX SIGNATURE HORIZONTAL APPLICATIONS – REFER TO DETAILED INSTRUCTIONS FOR SPECIFIC RAILING CONFIGURATIONS. J. Trex Signature crossover post*

A. Trex Signature top rail and crowned cover - 6 ' (actual length 73.5 " [186.7 cm]) - 8 ' (actual length 97.5 " [247.7 cm]) B. Trex Signature bottom rail and flat cover

- 36" (actual length 34.5" [87.6 cm]) - 42" (actual length 40.5" [102.9 cm]) K. Trex Signature post cap or post sleeve cap* L. Trex decking M. Trex fascia N. Code-approved wood joist 2 x 8 (5.1 cm x 20.3 cm) or larger O. Code-approved wood rim joist 2 x 8 (5.1 cm x 20.3 cm) or larger P. Crossover bracket cover (supplied with crossover post) * Item not included in Trex Signature Railing kits. ** Required ONLY for All Clear Span Applications over 6' (1.83 m) when smaller fixed baluster is fully centered, or unsupported spans greater than 5' (1.52 m) (example: 8' (2.44 m) span cut into one 5' (1.52 m) span and one 3' (0.91 m) span would require foot block under 5' (1.52 m) span since smaller fixed baluster is no longer centered). Included with 8' (2.44 m) railing kits. *** Both 4 x 4 (10.2cm x 10.2cm) and 6 x 6 (15.2cm x 15.2 cm) post sleeves are designed to fit over a 4 x 4 pressure treated post. NOTE: If installing 42" (106.7 cm) railing, and using pressure-treated posts with Trex post sleeves, ensure that a longer pressure-treated post is used along with longer post sleeve, both cut to a height of 46" (116.8 cm) from decking surface.

- 6 ' (actual length 71.5 " [181.6 cm]) - 8 ' (actual length 95.5 " [242.6 cm])

C. Trex Signature upper rail bracket and cover D. Trex Signature lower rail bracket and cover E. Trex Signature balusters (square or round) F. Trex Signature center baluster (square or round) G. Trex Signature foot block** H. Trex Signature post skirt or post sleeve skirt* I. Trex Signature post*

- 36 " (actual length 37 " [94.0 cm]) - 42 " (actual length 43 " [109.2 cm]) or Trex -4 x 4 post sleeve *** -6 x 6 post sleeve

-Trex 4 x 4 Aluminum Post Sleeve

NOTE: MUST USE TREX DECK MOUNT POST HARDWARE AND METAL PLATE WHEN ATTACHING SIGNATURE POSTS.

1

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL RAILING BRACKETS

NOTES: »  FOR EASE OF INSTALLATION, IT IS RECOMMENDED TO USE THE TREX SIGNATURE RAIL TEMPLATES TO ATTACH BRACKETS TO SIGNATURE POSTS OR 4 X 4 POST SLEEVES (SOLD SEPARATELY). » DO NOT USE IMPACT DRIVER WHEN INSTALLING SIGNATURE ® RAILING, ONLY USE STANDARD DRILL FOR SCREW ATTACHMENT OF BRACKET TO POSTS AND RAILS. »  SEE OTHER NOTES BELOW DEPENDING ON THE POST/POST SLEEVE THAT IS BEING INSTALLED BEFORE INSTALLATION OF BRACKETS. IMAGES BELOW DO NOT REFLECT SPECIFIC POST/POST SLEEVE APPLICATION. »  U SE A CLAMP TO HELP HOLD BRACKETS IN PLACE WHILE FASTENING WITH SCREWS.

HOW TO INSTALL HORIZONTAL FIXED BRACKETS

1

4

1. M easure 1-7/8" (4.8 cm) up from deck surface. Mark with light line.

4A. If installing Signature post, center upper

bracket on post above marked line and attach using three self-tapping screws (provided) .

1-7/8" (4.8 cm)

4B. If installing 4 x 4 post sleeve or Aluminum post sleeve, center upper bracket on post above marked line and attach using three 2" (5.1 cm) wood screws (provided) . 4C. If installing 6x6 post sleeve, center upper bracket on post above marked line and attach using three 2-1/2" (6.4 cm) wood screws (not provided) . NOTES: • IMPORTANT – If installing a post sleeve with a one-piece skirt, ensure the skirt is installed BEFORE installing lower bracket. • Upper bracket is not required in Signature crossover post configuration.

2

2. M easure 34 1/2" (87.6

cm) for 36" (92 cm) rail height or 40 1/2" (102.8 cm) for 42" (107 cm) rail height up from decking surface.* Mark with light line.

34-1/2" (87.6 cm) or 40-1/2" (107 cm)

3

3A. If installing Signature post, center lower bracket on post above the marked line and attach using two self-tapping screws (provided) .

3B. If installing 4 x 4 post

sleeve or Aluminum post sleeve, center lower

bracket on post above the marked line and attach using two 2" (5.1 cm) wood screws (provided) .

3C. If installing 6 x 6 post sleeve, center lower bracket on post above the marked line and attach using two 2-1/2" (6.4 cm) wood screws (not provided) .

2

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

HOW TO INSTALL RAILING BRACKETS

HOW TO INSTALL HORIZONTAL SWIVEL BRACKETS

1

1. M easure 1-7/8" (4.8 cm) up from deck surface. Mark with light line.

4a. If installing Signature post, center lower bracket on post above the marked line and attach using four self-tapping screws (provided).

4

1-7/8" (4.8 cm)

4b. If installing 4 x 4 post sleeve or Aluminum post sleeve, center lower bracket on post above the marked line and attach using four 2" (5.1 cm) wood screws (provided). 4c. If installing 6 x 6 post sleeve, center lower bracket on post above the marked line and attach using four 2-1/2" (6.4 cm) wood screws (not provided). NOTES: •  IMPORTANT - If installing a post sleeve with a one- piece skirt, ensure the skirt is installed BEFORE installing lower bracket.

2

2a. If installing Signature post, center lower bracket on post above the marked line and attach using four self-tapping screws (provided).

2b. If installing 4 x 4 post

sleeve or Aluminum post sleeve, center lower

bracket on post above the marked line and attach using four 2" (5.1 cm) wood screws (provided).

2c. If installing 6 x 6 post sleeve, center lower bracket on post above the marked line and attach using four 2-1/2" (6.4 cm) wood screws (not provided).

3

3.  Measure up from

decking surface 34- 3/16" (86.8 cm) for 36" (92 cm) tall railing, or 40-3/16" (102.1 cm) for 42" (107 cm) tall railing. Mark with a light line.

34-3/16" (86.8 cm) or 40-3/16" (102.1 cm)

3

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL RAILING POST TO POST

NOTES: » TREX SIGNATURE RAILINGS ARE DESIGNED TO BE ATTACHED WITH POSTS

Cutting Bottom Rail and Bottom Rail Cover

INSTALLED AT A CLEAR SPAN OF 6' (1.83 M) OR 8' (2.44 M). » IF INSTALLING AT EXACT SPAN LENGTHS OF 6' (1.83 M) OR 8'

KEY Mark Cut

KEY

2

(2.44 M), AND USING POST-TO-POST CONFIGURATION, THE BOTTOM RAIL WILL NOT NEED TO BE CUT, BUT THE TOP RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. » FOR ODD SPAN LENGTHS, BOTH TOP RAIL AND BOTTOM RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. ENSURE THAT BALUSTERS ARE SPACED WITH AN EQUAL DISTANCE ON EACH SIDE OF THE POST. » WHEN RAILINGS ARE CUT TO ODD SPANS, ALL SPANS GREATER THAN 5' (1.52 M) (EXAMPLE: 8' (2.44 M) SPAN CUT INTO ONE 5' (1.52 M) SPAN AND ONE 3' (0.91 M) SPAN) WOULD REQUIRE FOOT BLOCK UNDER 5' (1.52 M) SPAN SINCE SMALLER FIXED BALUSTER IS NO LONGER CENTERED.

Bottom rail

1/4" (0.6 cm)

1/4" (0.6 cm)

2. C ut each end of bottom rail 1/4" (0.6 cm) shorter than mark on each end to allow for fit into bottom rail brackets.

3

Bottom rail

How to Measure and Cut Bottom and Top Railings (When Required)

3/4" (1.9 cm)

3/4" (1.9 cm)

1

3. S lide rail insert out and cut 3/4" (19 mm) FROM EACH SIDE of insert, then slide back inside rail and center.

Bottom rail

4

4. M ark and cut bottom rail cover the same length as bottom rail.

Center slot for fixed baluster

Bottom rail

Top rail

1. P osition bottom and top rails between posts and align with bottom bracket. Align the center baluster slot in both rails with the middle of the span between posts.* This will allow an equal number of baluster holes on each side of center slot. Mark bottom rail and top rail at each end (ensure both rails are centered between posts). * In some cases, due to odd railing spans, the center baluster may need to be offset in one direction to ensure there is enough room at both post locations for balusters to be placed, review this BEFORE cutting any railings to ensure all balusters are equally spaced.

Bottom rail cover

4

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

HOW TO INSTALL HORIZONTAL RAILING POST TO POST/ CONTINUED TREX SIGNATURE ®

Cutting Top Rail

Attaching Center Baluster to Bottom Rail

KEY Mark Cut

KEY

Center balluster slot

5

8

Top rail

Inverted Bottom view

1/4" (0.6 cm)

1/4" (0.6 cm)

5. C ut each end of top rail 1/4" (0.6 cm) shorter than mark to allow for fit into top rail brackets. Cutting Top Rail Insert and Cover

8. A ttach shorter, center baluster in center slot in bottom rail using two #8 x 1-1/4" (3.2 cm) screws (provided). Attaching Bottom Rail Cover

6

9

Top rail

3/4" (1.9 cm)

3/4" (1.9 cm)

9. A lign flat cover on one side of bottom rail in slot on side of rail. Then starting from one end of rail snap cover onto opposing slot working down the length of rail. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening.

6. S lide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center.

7

7. M ark and cut top rail cover same length as top rail for all top rail configurations.

Top rail

Top rail cover

5

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL RAILING POST TO POST/ CONTINUED

13

Attaching Foot Block (when required) Required ONLY for All Clear Span Applications over 6' (1.83 m) when shorter fixed baluster is centered, or unsupported spans greater than 5' (1.52 m) (example: 8' (2.44 m) span cut into one 5' (1.52 m) span and one 3' (0.91 m) span would require foot block under 5' (1.52 m) span since shorter fixed baluster is no longer centered). Included with 8' (2.44 m) railing kits.

Installing Lower Rail to Brackets 13. Place adhesive strips

(provided) into bottom rail brackets, and then place bottom rail into brackets.

1

NOTE: Make sure surface is clean and dry.

10

Installing Remaining Balusters into Bottom Rail

14

2

10. Temporarily set bottom rail into bottom brackets, and place foot block under center of bottom rail. Mark to provide placement location of base. Remove bottom rail.

14. Place remaining balusters into holes in lower rail by snapping fully into place. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening. Attach Upper Railings

11

15

11. P lace base (smaller side facing down) on decking surface. Pre-drill using a 3/16" bit. Attach base of foot block using one screw at an angle through base and into decking.

12

12. A fter attached, use a rubber mallet along with scrap piece of

wood to tap foot block until it locks into place.

15. Working from one end of upper rail, snap balusters into upper rail working down length of rail. Fasten center baluster into center slot using two #8 x 1-1/4" (3.2 cm) screws (provided).

6

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

HOW TO INSTALL HORIZONTAL RAILING POST TO POST/ CONTINUED TREX SIGNATURE ® 16 20 21

16. Attach top rail to top bracket using two #10 x 1" self-tapping screws (provided) on each side of bracket.

Post sleeve

® Trex Signature ™ post

20. Attach post caps to Trex Signature posts. (Use of rubber .mallet may be required for secure attachment.) 21. Attach post caps to post sleeves using external grade PVC construction adhesive (apply adhesive on the inside self-centering/corner tabs).

17

17. A ttach “crowned” upper rail cover to upper rail by aligning cover on one side of rail. Then starting from one end of rail, snap cover onto opposing slot working down length of rail. GENTLE tapping with a rubber mallet may facilitate fastening. Attachment of Bracket Covers, Skirts, and Caps

18

19

Trex Signature ™ post ®

18. Attach corresponding bracket covers over opening in upper and bottom rails. 19. A ttach provided post skirt to bottom of posts when using Trex Signature post or composite two piece skirt to post sleeve (not shown).

7

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL RAILING POST TO CROSSOVER POST

NOTES: » TREX SIGNATURE RAILINGS ARE DESIGNED TO BE ATTACHED WITH POSTS INSTALLED AT A CLEAR SPAN OF 6' (1.83 M) OR 8' (2.44 M). » IF INSTALLING AT EXACT SPAN LENGTHS OF 6' (1.83 M) OR 8' (2.44 M), AND USING POST-TO-CROSSOVER POST CONFIGURATION, THE BOTTOM RAIL WILL NOT NEED TO BE CUT, BUT THE TOP RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. » AT ALL FINAL END POST CONFIGURATIONS, TOP RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. » FOR ODD SPAN LENGTHS, BOTH TOP RAIL AND BOTTOM RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. ENSURE THAT BALUSTERS ARE SPACED WITH AN EQUAL DISTANCE ON EACH SIDE OF THE POST. » WHEN RAILINGS ARE CUT TO ODD SPANS, ALL SPANS GREATER THAN 5' (1.52 M) (EXAMPLE: 8' (2.44 M) SPAN CUT INTO ONE 5' (1.52 M) SPAN AND ONE 3' (0.91 M) SPAN) WOULD REQUIRE FOOT BLOCK UNDER 5' (1.52 M) SPAN SINCE SMALLER FIXED BALUSTER IS NO LONGER CENTERED.

Cutting Bottom Rail and Bottom Rail Cover ONLY

KEY Mark Cut

KEY

2

Bottom rail

1/4" (0.6 cm)

1/4" (0.6 cm)

2. C ut each end of bottom rail 1/4" (0.6 cm) shorter than mark on each end to allow for fit into bottom rail brackets.

3

Bottom rail

How to Measure, Mark and Cut Bottom and Top Railings (When Required)

3/4" (1.9 cm)

3/4" (1.9 cm)

1

Bottom rail

3. S lide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center.

Center slot for fixed baluster

4

4. M ark and cut bottom rail cover the same length as bottom rail.

Bottom rail

Top rail

Important: DO NOT cut top rail the same length as bottom rail. 1. P osition bottom and top rails between posts and align with bottom bracket. Align the center baluster slot in both rails with the middle of the span between posts.* This will allow an equal number of baluster holes on each side of center slot. Mark bottom rail and top rail at each end (ensure both rails are centered between posts). * In some cases, due to odd railing spans, the center baluster may need to be offset in one direction to ensure there is enough room at both post locations for balusters to be placed. Review this BEFORE cutting any railings to ensure all balusters are equally spaced.

Bottom rail cover

8

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

HOW TO INSTALL HORIZONTAL RAILING POST TO CROSSOVER POST/ CONTINUED TREX SIGNATURE ®

Cutting Top Rail

Attaching Center Baluster to Bottom Rail

KEY Mark Cut

KEY

Center balluster slot

5

8

Top rail

Inverted Bottom view

1/4" (0.6 cm)

3/4" (1.9 cm)

5. Top rail must be cut differently on each side of the rail. Railing side that attaches to standard post should be cut 1/4" (0.6 cm) shorter than the mark to allow for fit into top rail bracket. Railing side that attaches to the crossover post should be cut 3/4" (1.9 cm) LONGER than the mark to allow for fit into the crossover post bracket. Cutting Top Rail Insert and Cover

8. A ttach shorter, center baluster in center slot in bottom rail using two #8 x 1-1/4" (3.2 cm) screws (provided). Attaching Bottom Rail Cover

9

6

Top rail

9. A lign flat cover on one side of bottom rail in slot on side of rail. If using tabbed brackets, the bottom rail cover will also have to be centered on bottom rail to allow for fit into tabbed bracket. Then starting from one end of rail snap cover onto opposing slot working down the length of rail. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening.

3/4" (1.9 cm)

3/4" (1.9 cm)

6. S lide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center.

10. Attaching Foot Block (when required) See instructions on page 6.

7

7. M ark and cut top rail cover same length as top rail for all top rail configurations.

Top rail

Top rail cover

9

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL RAILING POST TO CROSSOVER POST/ CONTINUED

16

Installing Lower Rail to Brackets

14. Attach top rail

to top bracket using two #10 x 1" self-tapping screws (provided) on each side of bracket.

11

11. P lace adhesive strips (provided) into bottom rail brackets, and then place bottom rail into brackets (proceed to step 12). NOTE: Make sure surface is clean and dry.

1

15. At crossover post

15

location, using a 7/64" (0.28 cm) drill bit, pre- drill at marked location for attachment of

Installing Remaining Balusters into Bottom Rail

2

12

railing to crossover post bracket. Attach fasten upper rail to crossover post bracket by installing screws diagonally through upper rail into post using two self-tapping screws each side (provided) . NOTE: Pre-drilling is required. Its best practice to pre-drill a single hole, then attach screw, and continue in this order. 1 7/64" (.28 cm)

12. P lace remaining balusters into holes in lower rail by snapping fully into place. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening. Attach Upper Railings

16

13

16. A ttach “crowned” upper rail cover to upper rail by aligning cover on one side of rail. Then starting from one end of rail, snap cover onto opposing slot working down length of rail. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening.

13. Working from one end of upper rail, snap balusters into upper rail working down length of rail. Fasten center baluster into center slot using two #8 x 1-1/4" (3.2 cm) screws (provided).

10

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

HOW TO INSTALL HORIZONTAL RAILING POST TO CROSSOVER POST/ CONTINUED TREX SIGNATURE

Attachment of Bracket Covers, Skirts, and Caps

21

21. For crossover post

17

18 Trex

configuration, attach crossover post cap to crossover post.

Signature post

17. Attach corresponding bracket covers over opening in upper and bottom rails. 18. A ttach provided post skirt to bottom of posts when using Trex Signature post or composite two piece skirt to post sleeve (not shown).

20

19

Post sleeve

Trex Signature post

19. Attach post caps to Trex Signature ® posts. (Use of rubber .mallet may be required for secure attachment). 20. Attach post caps to post sleeves using external grade PVC construction adhesive (apply adhesive on the inside self-centering corner tabs).

HOW TO INSTALL HORIZONTAL RAILING CROSSOVER POST TO CROSSOVER POST– TREX SIGNATURE ® NOTES:

» TREX SIGNATURE ® RAILINGS ARE DESIGNED TO BE ATTACHED WITH POSTS INSTALLED AT A CLEAR SPAN OF 6' (1.83 M) OR 8' (2.44 M). » IF INSTALLING AT EXACT SPAN LENGTHS OF 6' (1.83 M) OR 8' (2.44 M), AND USING POST-TO-CROSSOVER POST CONFIGURATION, THE BOTTOM RAIL WILL NOT NEED TO BE CUT, BUT THE TOP RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. » FOR ODD SPAN LENGTHS, BOTH TOP RAIL AND BOTTOM RAIL WILL NEED TO BE MEASURED (MAKING SURE BALUSTERS LINE UP VERTICALLY) AND CUT. ENSURE THAT BALUSTERS ARE SPACED WITH AN EQUAL DISTANCE ON EACH SIDE OF THE POST. » WHEN RAILINGS ARE CUT TO ODD SPANS, ALL SPANS GREATER THAN 5' (1.52 M) (EXAMPLE: 8' (2.44 M) SPAN CUT INTO ONE 5' (1.52 M) SPAN AND ONE 3' (0.91 M) SPAN) WOULD REQUIRE FOOT BLOCK UNDER 5' (1.52 M) SPAN SINCE SMALLER FIXED BALUSTER IS NO LONGER CENTERED.

11

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL RAILING CROSSOVER POST TO CROSSOVER POST/ CONTINUED

How to Measure, Mark and Cut Bottom and Top Railings (When Required) Important: DO NOT cut top rail the same length as bottom rail.

3

1

Bottom rail

3/4" (1.9 cm)

3/4" (1.9 cm)

Bottom rail

Center slot for fixed baluster

3. S lide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center.

Top rail

4

4. M ark and cut bottom rail cover the same length as bottom rail.

1. Position bottom and top rails between posts and align with bottom bracket. Align the center baluster slot in both rails with the middle of the span between posts.* This will allow an equal number of baluster holes on each side of center slot. Mark bottom rail and top rail at each end (ensure both rails are centered between posts). * In some cases, due to odd railing spans, the center baluster may need to be offset in one direction to ensure there is enough room at both post locations for balusters to be placed. Review this BEFORE cutting any railings to ensure all balusters are equally spaced. Cutting Bottom Rail and Bottom Rail Cover ONLY

Bottom rail

Bottom rail cover

Cutting Top Rail

KEY Mark Cut

KEY

5

KEY Mark Cut

KEY

2

Top rail

3/4" (1.9 cm)

3/4" (1.9 cm)

Bottom rail

1/4" (0.6 cm)

1/4" (0.6 cm)

5. Cut each end of top rail 3/4" (1.9 cm) LONGER than the mark to allow for fit into the crossover post bracket on each side.

2. C ut each end of bottom rail 1/4" (0.6 cm) shorter than mark on each end to allow for fit into bottom rail brackets.

12

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

HOW TO INSTALL HORIZONTAL RAILING CROSSOVER POST TO CROSSOVER POST/ POST/ CONTINUED – TREX SIGNATURE ®

Cutting Top Rail Insert and Cover

Attaching Bottom Rail Cover

6

9

Top rail

3/4" (1.9 cm)

3/4" (1.9 cm)

9. A lign flat cover on one side of bottom rail in slot on side of rail. Then starting from one end of rail snap cover onto opposing slot working down the length of rail. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening. 10. Attaching Foot Block (when required) See instructions on page 6. Installing Lower Rail to Brackets 11. P lace adhesive strips 11

6. S lide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center.

7

7. M ark and cut top rail cover same length as top rail for all top rail configurations.

Top rail

(provided) into bottom rail brackets, and then place bottom rail into brackets (proceed to step 12).

Top rail cover

1

Attaching Center Baluster to Bottom Rail

Center balluster slot

8

NOTE: Make sure surface is clean and dry. Installing Remaining Balusters into Bottom Rail

12

Inverted Bottom view

8. A ttach shorter, center baluster in center slot in bottom rail using two #8 x 1-1/4" (3.2 cm) screws (provided).

12. P lace remaining balusters into holes in lower rail by snapping fully into place. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening.

13

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL HORIZONTAL RAILING CROSSOVER POST TO CROSSOVER POST/ CONTINUED Attach Upper Railings Attachment of Bracket Covers, Skirts, and Caps

16

13

17

Trex Signature post

16. Attach corresponding bracket covers over opening in bottom rails. 17. A ttach provided post skirt to bottom of posts when using Trex Signature post or composite two-piece skirt to post sleeve (not shown).

13. Working from one end of upper rail, snap balusters into upper rail working down length of rail. Fasten center baluster into center slot using two #8 x 1-1/4" (3.2 cm) screws (provided).

18

18. A ttach crossover post cap to crossover post.

14

14. At crossover post

locations using a 7/64" (0.28 cm) drill bit, predrill for attachment of railing to crossover post

2

bracket. Attach fasten upper rail to crossover post by installing screws diagonally through upper rail into post using two self-tapping screws each side (provided) . 1 7/64" (.28 cm)

NOTE: Pre-drilling is required. Its best practice to pre-drill a single hole, then attach screw, and continue in this order.

15

15. A ttach “crowned” upper rail cover to upper rail by aligning cover on one side of rail. Then starting from one end of rail, snap cover onto opposing slot working down length of rail. GENTLE tapping with a rubber mallet may facilitate fastening.

14

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

INSTALLATION OF HORIZONTAL SWIVEL RAILING T REX SIGNATURE ® » WHEN USING TREX SIGNATURE HORIZONTAL SWIVEL BRACKETS, BOTH BOTTOM AND TOP RAILS WILL NEED TO BE MEASURED AND CUT TO APPROPRIATE LENGTHS. » HORIZONTAL SWIVEL BRACKETS CAN BE USED UP TO A 50° ANGLE FOR TREX SIGNATURE RAILINGS. » WHEN USING HORIZONTAL SWIVEL BRACKETS VERY IMPORTANT TO LAY OUT LOCATION AND ORIENTATION OF POSTS AND SWIVEL BRACKETS BEFORE INSTALLING SWIVEL BRACKETS. » WHEN RAILINGS ARE CUT TO ODD SPANS, ALL SPANS GREATER THAN 5' (1.52 M) (EXAMPLE: 8' (2.44 M) SPAN CUT INTO ONE 5' (1.52 M) SPAN AND ONE 3' (0.91 M) SPAN) WOULD REQUIRE FOOT BLOCK UNDER 5' (1.52 M) SPAN SINCE SMALLER FIXED BALUSTER IS NO LONGER CENTERED.

How to Measure and Cut Bottom and Top Railings 1. With brackets in correct swivel location, measure distance from inside of bracket to inside of bracket. ENSURE THAT BEFORE CUTTING, BALUSTERS HOLES ON BOTH BOTTOM AND TOP RAIL LINE UP. ALSO MAKE SURE CENTER BALUSTER SLOT IS AS CLOSE TO THE MIDDLE OF THE SPAN AS POSSIBLE. In some cases, due to odd railing spans, the center baluster may need to be offset in one or the other direction to ensure there is enough room at both post locations for balusters to be placed.

1

Center slot for fixed baluster

Cutting Bottom Rail and Bottom Rail Cover

Cutting Top Rail Option 1: For Post-to Post Configuration

2

KEY Mark Cut

KEY

5a

1/4" (0.6 cm)

Bottom rail

1/4" (0.6 cm)

Top rail

5a. C ut top rail to the measurement between the top swivel brackets. For standard post-to-standard post configurations this would be same dimensions as that of the bottom rail. Cutting Top Rail Option 2: For Post-to-Crossover Post Configuration

2. Cut bottom rail to the measurement between the bottom swivel brackets.

3

5b

Standard post

3/4" (1.9 cm)

3/4" (1.9 cm)

Bottom rail

Crossover post

3. S lide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center. 4. M ark and cut bottom rail cover the same size as bottom rail.

5b. .When going from standard-post to crossover post, measurement must be taken from inside of top horizontal swivel bracket to inside lip of crossover bracket (which is attached to top of crossover post).

15

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® HORIZONTAL RAILING Installation Instructions

INSTALLATION OF HORIZONTAL SWIVEL RAILING/ CONTINUED

11.  Installing Remaining Balusters into Bottom Rail  See instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post. 12.  Attach Upper Railings S ee instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post. 13. Attachment of Bracket Covers, Skirts, and Caps  See instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post.

Cutting Top Rail Insert and Cover

6

Top rail

3/4" (1.9 cm)

3/4" (1.9 cm)

6. Slide rail insert out and cut 3/4" (1.9 cm) FROM EACH SIDE of insert, then slide back inside rail and center.

7. M ark and cut top rail cover same length as top rail for all top rail configurations. 8.  Attaching Center Baluster to Bottom Rail See instructions on page

7

Top rail

Top rail cover

5—Post-to-Post or 8— Post-to- Crossover Post. 9. Attaching Foot Block (when required) See instructions on page 6. 10.  Attaching Bottom Rail Cover and Bottom Rail to Brackets  See instructions on page 4 Post-to-Post or page 8 Post-to-Crossover Post.

16

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-HZSIGNATURE-0426

TREX SIGNATURE ® STAIR RAILING Installation Instructions

BRACKET HARDWARE – STAIR APPLICATIONS (INCLUDING STAIR SWIVEL BRACKETS, STAIR CROSSOVER BRACKET, AND COMPOUND SWIVEL BRACKETS)

SCAN QR CODE IF INSTALLING COCKTAIL RAIL APPLICATIONS WITH TREX METAL RAILING SYSTEMS.

FIXED BRACKET – STAIR HARDWARE

DD

AA. B ottom Stair Bracket and Cover – Lower Rail BB. Top Stair Bracket and Cover – Lower Rail CC. Fastener Pack DD. Bottom Stair Bracket and Cover – Upper Rail EE. Top Stair Bracket and Cover – Upper Rail

AA

EE

BB

SWIVEL BRACKET – STAIR HARDWARE

FF

FF. Swivel Top Rail Bracket and Cover – Stair GG. Swivel Bottom Rail Bracket and Cover – Stair HH. Fastener Covers II. Fastener Pack

II

GG

HH

COMPOUND SWIVEL BRACKET – STAIR HARDWARE

JJ. Compound Swivel Top Rail Bracket and Cover – Stair KK. Compound Swivel Bottom Rail Bracket and Cover – Stair LL. Fastener Covers MM. Fastener Pack

LL

JJ

KK

MM

SWIVEL CROSSOVER BRACKET KIT – STAIR HARDWARE

NN. Swivel Crossover Bracket – Stair OO. Post-to-Bracket Fasteners

NN

OO

1

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGN-ST-0426

TREX SIGNATURE ® STAIR RAILING Installation Instructions

HOW TO INSTALL STAIR POSTS AND STAIR RAILING

IMPORTANT NOTES: » FOR A 6' OR 8' STAIR RAIL, POST TO POST SPAN WILL BE LESS THAN 6' OR 8'. PRIOR TO INSTALLING STAIR POSTS CALCULATE POST TO POST SPAN USING A MAXIMUM STAIR RAIL LENGTH REQUIRED AND THE ANGLE (32°-37°) AT WHICH THE STAIR RAILS WILL BE INSTALLED. DO NOT INSTALL STAIR POSTS AT 6' OR 8' SPAN, AS STAIR RAILINGS WILL THEN BE TOO SHORT. » All Trex Signature ® stair installations require the use of 53" (134.6 CM) stair post, measured and cut to appropriate length if required. » If crossover stair post is required, use stair post (again cut to appropriate length if required) and use swivel crossover bracket. » Trex Signature ® Stair fixed brackets are designed to work only with stair slopes of 32°-37°. » For smaller (less than 32°) or larger angles (greater than 37°), use the Trex Signature ® Stair Swivel brackets. » Trex Signature ® Compound swivel stair brackets are designed for flared stair designs. » At all final end post configurations, top stair rail will need to be measured (making sure balusters line up vertically) and cut. » For odd span lengths, both bottom and top stair rails will need to be measured (making sure balusters line up vertically) and cut. Also, ensure that balusters are spaced with equal distance on each side of the post. » Rails that do not require cutting must be oriented in the correct direction to ensure balusters are spaced properly when installed in brackets. On both bottom and top stair railings, .baluster hole closest to the end of each stair rail is to be installed at the top of the stair section. Ensure that both bottom and top rails are correct and balusters line up vertically before INSTALLING.

Installing Standard Trex Signature ® Stair Posts, Trex Signature ® Stair Crossover Posts, or Pressure- treated Post, Post Sleeves and Skirts 1.  Make sure 53 " (135.6 cm) posts are used for all stair posts. 2. If Trex Signature ® stair

2

posts are used, install at nose of stair tread directly under required blocking. See Trex Signature horizontal post instructions.

Installing Pressure-Treated Posts » P LEASE REFER TO LOCAL BUILDING CODE REQUIREMENTS PRIOR TO ATTACHING PRESSURE TREATED POSTS. » P RESSURE TREATED POSTS MUST BE INSTALLED ON INSIDE OF STAIR STRINGER AND AT NOSE OF STAIR TREAD. » P OST TO POST SPAN WILL BE LESS THAN 6' OR 8'. PRIOR TO INSTALLING POSTS CALCULATE POST TO POST SPAN USING A MAXIMUM RAIL LENGTH REQUIRED AND THE ANGLE (32°-37°) AT WHICH THE RAILS WILL BE INSTALLED. DO NOT INSTALL STAIR POSTS AT 6' OR 8' SPAN, AS STAIR RAILINGS WILL THEN BE TOO SHORT. » In most cases, a post and post sleeve longer than 39" (991 mm) will be needed on the lower section of stair rail to accommodate stair angle.

» Foot Blocks for stairs are sold separately and recommended for use in Signature ® Cocktail applications.

2

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGN-ST-0426

ATTACHING FIXED STAIR BRACKETS AND RAILS TO POSTS AND PRESSURE- TREATED POST AND POST SLEEVES TREX SIGNATURE ® NOTES: » All Trex Signature ® fixed stair brackets work ONLY with stair slopes of 32°-37°. How to Measure Bottom Stair Railing (WHEN REQUIRED)

» Illustrations shown are representations when using Trex Signature ® post, but same rules apply if using pressure-treated posts and post sleeves. » Use a clamp to help hold stair brackets in place while fastening with screws. IMPORTANT NOTE: » BEFORE ATTACHING ANY UPPER BRACKETS MAKE SURE PROPER RAILING HEIGHTS ARE ACHIEVED. RAILING HEIGHTS AND UPPER BRACKET HEIGHTS MAY NEED TO BE ADJUSTED, HOWEVER, DO NOT REDUCE HEIGHTS BASED ON YOUR RAILING CODE REQUIREMENTS. MEASURE CAREFULLY AS DIMENSION HEIGHTS MAY NEED TO BE ADJUSTED!

3

Top stair post

Bottom stair post

1

1" (2.5 cm)

3 Position bottom stair rail along the nose of the stair treads. Ensure that before cutting, balusters holes are centered in between the posts and also allow for clearance for attachment to brackets. On top stair post location, mark UNDERSIDE of lower rail. On bottom stair post location mark TOPSIDE of lower rail at angled intersection of the bracket.

1. Lay bottom stair rail on steps beside posts. Position bottom rail at least 1" (2.5 cm) above nose of stair tread . Tip: Use a 1" (2.5 cm) deck board as a spacer board and clamp rails to post. Mark where lower brackets are to be attached to both posts. Mark at underside of railing location. . Installing Lower Fixed Stair Brackets

KEY Mark Cut

KEY

4

Bottom stair rail

1/4" (0.6 cm)

2 Bottom stair bracket – bottom rail

1/4" (0.6 cm)

Top stair bracket – bottom rail

4. Cut each end of the bottom stair rail, rail insert, and bottom rail cover 1/4" (0.6 cm) shorter than the mark on each end to allow for fit into bottom stair rail brackets. NOTE: Railing does not need to be cut at angle. Brackets are designed to allow for railing to be installed with standard straight cut.

2. Center lower stair bracket on post above the marked line and attach using two self-tapping screws (provided) . In some cases it may be difficult to attach the stair bracket on the lower stair post. A 90° cordless drill is recommended to attach screws in this area.

3

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGN-ST-0426

TREX SIGNATURE ® STAIR RAILING Installation Instructions

ATTACHING FIXED STAIR BRACKETS AND RAILS TO POSTS AND PRESSURE- TREATED POST AND POST SLEEVES/CONTINUED

7

5

7. P lace base (smaller side facing down) on decking surface. Pre-drill using a 3/16" bit. Attach base of foot block using one screw at an angle through base and into decking.

5. A ttach “flat” bottom stair rail cover to bottom stair rail. Align cover on one side of the bottom rail in slot on side of rail. Then starting from one end of rail snap cover onto opposing slot working down the length of the rail. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening. Attaching Foot Block (where recommended) Recommended for all spans over 6' for Signature Cocktail applications).

8

8. A fter attached, use a rubber mallet along with scrap piece of

wood to tap foot block until it locks into place.

6

9

2

4

9. S et bottom stair rail into bottom stair rail brackets. Attach bottom stair rail to bottom stair bracket using two self-tapping screws (provided) on each side of bracket. Installing Upper Fixed Stair Brackets and Measuring Upper Rail IMPORTANT NOTE:

6. Temporarily set bottom rail in bottom brackets, and place foot block towards the nose of the stair tread along the side of the bottom rail. Mark location of angle on foot block and cut on mark. Then place foot block under the center of the bottom rail. Mark placement location of the base. Remove lower rail.

BEFORE CUTTING ANY TOP RAILS, MAKE SURE THAT ALL BALUSTER HOLES LINE UP PARALLEL WHEN MEASURING! 10. Place two balusters into lower rail at each end closest to post.

10

4

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGN-ST-0426

ATTACHING FIXED STAIR BRACKETS AND RAILS TO POSTS AND PRESSURE- TREATED POST AND POST SLEEVES/CONTINUED TREX SIGNATURE ®

Top stair post

14

11

Bottom stair post

11. Position top stair rail onto balusters ensuring balusters are fully seated in top rail (position to side of post) and ENSURE that balusters are parallel with post.

14. O n top stair post location, mark UNDERSIDE of upper rail. On bottom stair post location mark TOPSIDE of upper rail at angled intersection inside the bracket. Cutting Top Stair Rail Cover, and Attachment of Top Stair Rail Cover

12

KEY Mark Cut

KEY

15

Top stair rail

1/4" (0.6 cm)

12. Mark a light line on posts at UNDERSIDE of rail to show the location of the fixed stair brackets.

1/4" (0.6 cm)

15. .C ut each end of top stair rail along with rail insert 1/4" (0.6 cm) shorter than mark to allow for fit into top stair rail bracket. NOTE: Railing does not need to be cut at angle. Brackets are designed to allow for railing to be installed with standard straight cut.

13

Top stair bracket – top rail

Bottom stair bracket – top rail

16. Mark and cut top rail cover same length as top rail for all top rail configurations.

16

13. R emove upper stair rail and center upper stair fixed bracket on post above the marked line and attach using two self-tapping screws (provided) .

5

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGN-ST-0426

TREX SIGNATURE ® STAIR RAILING Installation Instructions

ATTACHING FIXED STAIR BRACKETS AND RAILS TO POSTS AND PRESSURE- TREATED POST AND POST SLEEVES/CONTINUED

Attachment of Stair Bracket Covers, Skirts, and Caps 21. Attach corresponding

17

21

bracket covers over opening in upper and bottom rails.

17. A ttach “crowned” upper stair rail cover to upper stair rail by aligning cover on one side of rail. Then starting from one end of stair rail, snap cover onto opposing slot working down length of stair rail. GENTLE tapping with a rubber mallet may facilitate the fastening. Installing Balusters into Bottom Stair Rail 18. P lace balusters into 18

22. Attach provided post skirt to bottom of posts when using Trex Signature posts.

22 Trex

Signature post

holes in lower stair rail by snapping fully into place. In some cases, GENTLE tapping with a rubber mallet may facilitate fastening.

24

23

Post sleeve

Trex Signature post

Attaching Upper Stair Rails

20

19

23. A ttach post caps to Trex Signature posts (use of rubber mallet may be required for secure attachment). 24. .Attach post caps to post sleeves using external grade PVC construction adhesive (apply adhesive on the inside self-centering/corner tabs).

19. W orking from one end of upper stair rail, snap balusters into upper stair rail working down length of rail. 20. A ttach top stair rail to top stair bracket (all types) using two self-tapping screws (provided) on each side of stair bracket.

6

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGN-ST-0426

ATTACHING STAIR SWIVEL/COMPOUND SWIVEL BRACKETS AND RAILS TO POSTS AND PRESSURE-TREATED POST AND POST SLEEVES TREX SIGNATURE ® NOTES:

How to Measure Bottom Stair Railings (WHEN REQUIRED)

» Illustrations shown are representations when using Trex Signature ® posts, but same rules apply if using pressure-treated posts and post sleeves. » Use a clamp to help hold stair brackets in place while fastening with screws. IMPORTANT NOTE: » BEFORE ATTACHING ANY UPPER BRACKETS, MAKE SURE PROPER RAILING HEIGHTS ARE ACHIEVED. RAILING HEIGHTS AND UPPER BRACKET HEIGHTS MAY NEED TO BE ADJUSTED, HOWEVER, DO NOT REDUCE HEIGHTS BASED ON YOUR RAILING CODE REQUIREMENTS. MEASURE CAREFULLY AS DIMENSION HEIGHTS MAY NEED TO BE ADJUSTED!

3

1

3. W ith brackets in correct swivel locations, measure distance from inside of swivel bracket to inside of swivel bracket. Ensure that before cutting, balusters holes are parallel and centered in between the posts and also allow for clearance for attachment to brackets. Mark bottom stair rail at each intersection. Cutting Bottom Stair Rail, Bottom Stair Rail Cover, and Attachment of Bottom Stair Rail Cover

1" (2.5 cm)

1. Lay bottom stair rail on steps beside posts. Position bottom rail at least 1" (2.5 cm) above nose of stair tread . Tip: Use a 1" (2.5 cm) deck board as a spacer board and clamp rails to post. Mark where lower brackets are to be attached to both posts. Mark at underside of railing location. Installing Lower Stair Swivel and Compound Swivel Brackets

4

Mounting Holes

2

4. C ut each end of the bottom rail, rail insert, and bottom rail cover at the mark on each end to allow for fit into bottom stair rail brackets. NOTE: Railing does not need to be cut at angle. Brackets are designed to allow for railing to be installed with standard straight cut.

2. Center lower stair swivel bracket on post above the marked line and attach using four self-tapping screws (provided). In some cases it may be difficult to attach the stair bracket on the lower stair post. A 90° cordless drill is recommended to attach screws in this area.

7

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com