adopted_mtp_june_9_2026 (1)

Major Employers within a 15-minute Driveshed

High VC Ratio Corridors

Roadway Gap Closures (< 5 miles)

Commute Gaps

Combined Gaps and Intersections

Roadway Gap Closures (0.5-1 mile)

Figure 6.4: Network Needs Analysis Maps

170

Fort Worth Master Transportation Plan | Multimodal Gap Analysis

Made with FlippingBook Annual report maker