Table 8.4 provides a summary of the 2026 investment cycle projects, including limits and improvement types. Detailed cost information and PE Report documentation are included in Appendix H.

Table 8.4: 2026 Investment Cycle Projects: Summary of Improvements # Project ID Project Sponsor Facility From To Scope

Investment Cycle Activities

COFW Funding Need

Other Funding

Federal Funding

Chapin School Rd (RM 2871) IH-20

City Limit / Aledo Rd SH 170 (Alliance Gtwy) Park Vista Blvd

Reconstruct and widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR Design, NEPA, ROW $5,000,000

1

111

TxDOT

High Mesa Rd SH 170 (Alliance Gtwy) Old Decatur Rd Wagley Robertson Rd

Construct a (4)-lane divided roadway with a single bridge over the creek and floodplain

Design, NEPA, ROW $500,000

$9,250,000

$5,000,000

City of Fort Worth

2

116

Westport Pkwy

Construct a (4)-lane divided roadway

Design

$300,000

$4,200,000

Future Willow Springs

Construct a (4)-lane divided roadway with a single bridge over the RR and (2) bridge class culverts over the floodplain Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths

Heritage Trace Pkwy Heritage Trace Pkwy Heritage Trace Pkwy

3

105 City of Fort Worth

Design, NEPA, ROW $3,600,000

$3,000,000

$2,000,000

Boulder Oak Blvd

4

105 City of Fort Worth

Design, NEPA, ROW $5,100,000

5

at BNSF Fort Worth Subdivision

105 City of Fort Worth

Design, NEPA, ROW $10,000,000

$8,000,000

City of Fort Worth

E Bailey Boswell Rd

Blue Mound Rd/FM 156 Cobb Park Dr

Horseman Rd US 287 (MLK Fwy)

6 7 8

104

Construct a (4)-lane divided roadway

Construction Design, Construction Design, Construction

$49,700,000

$2,500,000

Reconstruct four (4)-lane divided roadway with TWLTL Reconstruct and widen from (2)-lane to (4)-lane divided roadway with shared-use paths

112 City of Fort Worth E Berry St

$11,250,000

$14,750,000

City of Fort Worth City of Fort Worth City of Fort Worth City of Fort Worth

204

W Risinger Rd Crowley Rd Hemphill St

$3,800,000

$8,300,000 $41,800,000

Saginaw Main St (BUS 287) Boat Club Rd (FM 1220)

E Bonds Ranch Rd E Bonds Ranch Rd E Bonds Ranch Rd

9

107

Blue Sky Dr Construct a (4)-lane divided with a bridge over the RR

Design, ROW

$2,500,000 $15,000,000 $29,000,000

Saginaw Main St (BUS 287)

10

106

Widen from (2)-lane to (4)-lane divided roadway Design, Construction

$14,800,000

$11,380,000

Wagley Robertson Rd

11

107

Blue Sky Dr

Widen from (2)-lane to (4)-lane divided roadway Design, Construction

$50,700,000

$11,958,280

Lon Stephenson Rd

12

0

TxDOT

Forest Hill Dr

Bluebell Dr Widen from (2)-lane to (4)-lane divided roadway City Soft and ROW

$1,030,000

FW City Limits

Everman County Line Widen from (2)-lane to (4)-lane divided roadway City Soft and ROW IH-35W (South Fwy) Widen from (2)-lane to (4)-lane divided roadway Design, NEPA, ROW, Construction

13

0

TxDOT

Wichita St Meacham Blvd

$50,000

Blue Mound Rd

14 15

103 City of Fort Worth

$11,800,000

$28,000,000

City of Fort Worth City of Fort Worth

Wagley Robertson Rd E Altamesa Blvd

Bonds Ranch Rd

Quicksilver Trl Dick Price Rd

219

Widen from (2)-lane to (4)-lane divided roadway Design

$3,000,000

Construct a (2)-lane undivided roadway with a shared-use path on one side and a single bridge over the floodplain

16

109

Anglin Dr

Design, NEPA, ROW $2,900,000

$11,030,000 $15,000,000

263

Prioritized Project List & TIP | Fort Worth Master Transportation Plan