Table 8.5 provides a summary of the 2030 investment cycle projects, based on project limits and improvement types. Additional detail, including PE Report summaries and updated cost information, is available in Appendix H.
Table 8.5: 2030 Investment Cycle Projects: Summary of Improvements # Project ID Facility From To Scope
Investment Cycle Activ- ities Construction
Bond Activities Costs (Escalated to Year of Expenditure)
Chapin School Rd (RM 2871)
City Limit / Aledo Road
Widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR
111
IH-20
$20,000,000
1
2
116
Westport Pkwy High Mesa Rd
Park Vista Blvd Construct a (4)-lane divided roadway with a single bridge over the creek and floodplain Construction
$92,114,100
Construct a (4)-lane divided roadway with a single bridge over the RR and (2) bridge class culverts over the floodplain Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided with a bridge over the RR
3
105 Heritage Trace Pkwy Old Decatur Rd Future Willow Springs
Construction
$68,989,916
Wagley Robertson Rd
Boulder Oak Blvd
105 Heritage Trace Pkwy
Construction
$71,073,719
4
105 Heritage Trace Pkwy at BNSF Fort Worth Sub
Construction
$84,520,017
5
Saginaw Main Street (BUS 287) Blue Sky Dr
6
107 Bonds Ranch Rd
Construction
$17,945,354
Wagley Robertson Rd
7
219
Bonds Ranch Rd Quicksilver Trl Widen from (2)-lane to (4)-lane divided roadway
Construction
$62,027,376
Construct a (2)-lane undivided roadway with a shared- use path on one side and a single bridge over the floodplain
109 Altamesa Blvd Anglin Dr
Dick Price Rd
Construction
$116,474,319
8
Table 8.6: 2030 Investment Cycle Forecasted Capacity 2030 Investment Cycle Total Bond Funding Amount $118,122,819.00 Other Source Funding $299,226,582.00 Total Funding Available $417,349,401.00 Total Funding Used $533,144,800.12 Balance $(115,795,399.12)
265