Table 8.5 provides a summary of the 2030 investment cycle projects, based on project limits and improvement types. Additional detail, including PE Report summaries and updated cost information, is available in Appendix H.

Table 8.5: 2030 Investment Cycle Projects: Summary of Improvements # Project ID Facility From To Scope

Investment Cycle Activ- ities Construction

Bond Activities Costs (Escalated to Year of Expenditure)

Chapin School Rd (RM 2871)

City Limit / Aledo Road

Widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR

111

IH-20

$20,000,000

1

2

116

Westport Pkwy High Mesa Rd

Park Vista Blvd Construct a (4)-lane divided roadway with a single bridge over the creek and floodplain Construction

$92,114,100

Construct a (4)-lane divided roadway with a single bridge over the RR and (2) bridge class culverts over the floodplain Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided with a bridge over the RR

3

105 Heritage Trace Pkwy Old Decatur Rd Future Willow Springs

Construction

$68,989,916

Wagley Robertson Rd

Boulder Oak Blvd

105 Heritage Trace Pkwy

Construction

$71,073,719

4

105 Heritage Trace Pkwy at BNSF Fort Worth Sub

Construction

$84,520,017

5

Saginaw Main Street (BUS 287) Blue Sky Dr

6

107 Bonds Ranch Rd

Construction

$17,945,354

Wagley Robertson Rd

7

219

Bonds Ranch Rd Quicksilver Trl Widen from (2)-lane to (4)-lane divided roadway

Construction

$62,027,376

Construct a (2)-lane undivided roadway with a shared- use path on one side and a single bridge over the floodplain

109 Altamesa Blvd Anglin Dr

Dick Price Rd

Construction

$116,474,319

8

Table 8.6: 2030 Investment Cycle Forecasted Capacity 2030 Investment Cycle Total Bond Funding Amount $118,122,819.00 Other Source Funding $299,226,582.00 Total Funding Available $417,349,401.00 Total Funding Used $533,144,800.12 Balance $(115,795,399.12)

265

Prioritized Project List & TIP | Fort Worth Master Transportation Plan

Made with FlippingBook Annual report maker