Table 8.7 provides a summary of the 2034 investment cycle projects is included in this section, reflecting project limits and improvement types. More de - tailed documentation and cost information are provided in Appendix H.
Table 8.7: 2034 Investment Cycle Projects: Summary of Improvements # Project ID Facility From To Scope
Bond Activities Costs (Escalated to Year of Expenditure)
Investment Cycle Activities
Widen from (2)-lane to (4)-lane divided roadway with shared-use paths.
Design, Construction
237 Old Denton/ Riverside
Westport Pkwy Sawtimber Trl
$23,404,455.86
1
W. Bailey Boswell Rd
207 Bowman Roberts Rd
WJ Boaz Rd
Widen from (2)-lane to (3)-lane with center turn lane.
Design, ROW
$8,585,146.99
2
Meacham Blvd (East)
I-35W (South Fwy) W Fork Trinity River
Widen from (3)-lane to (4)-lane divided roadway with pedestrian and shared-use paths. Construct a (4)-lane divided roadway with shared-use paths and a single bridge over wetlands, a river, and a flood zone. Widen from (2)-lane to (3)-lane with center turn lane. Reconstruct roadway to include advanced signals, transit cue jumps, continuous shared-use paths, and intersection treatments.
3
201
N. Beach St
Design, ROW
$33,893,761.41
Design, NEPA, ROW
4
212 Amon-Carter Extension
Trinity Blvd
$112,784,754.69
Bowman Roberts Rd Eastchase Pkwy/Dottie Lynn Pkwy
Ten Mile Bridge Rd John T. White Rd
5
222
WJ Boaz Rd
Design, ROW
$34,984,441.30
East Lancaster Ave (SH180)
Design, Construction
6
202
$162,944,687.71
Table 8.8: 2034 Investment Cycle Forecasted Capacity 2034 Investment Cycle Total Bond Funding Amount $134,171,213.00 Other Source Funding $285,284,668.00 Total Funding Available $419,455,881.00 Total Funding Used $376,597,247.95 Balance $42,858,633.05
267