8.10.3. Partnerships Fort Worth’s transportation system does not operate in isolation. Realizing the investments identified in this plan requires sustained coordination with state and regional partners — most significantly the Texas Department of Transportation (TxDOT) and the Trinity Metro regional transit authority. The projects listed below represent Fort Worth’s current partnership commitments: corridors and programs where City investment, advocacy, or coordination is essential to project delivery. TxDOT Partnerships Many of Fort Worth’s most critical corridors are state-owned facilities. The City maintains an active partnership with TxDOT’s Fort Worth and Dallas Districts to advance reconstruction, safety, and capacity improvements on these roadways. Table 8.26 identifies ten priority TxDOT partnership projects totaling approximately $147 million, ranging from near-term right-of-way and design investments to longer-horizon reconstruction and interchange improvements. Projects span the full geography of the city — from the US 81/287 corridor in the north to IH 30 in the east and west — and include direct City cash contributions to bridge reconstruction, interchange construction, and corridor-wide safety improvements. The phased structure of several projects, notably RM 2871 and IH 30 E, reflects a deliberate strategy of investing in design and right- of-way preservation early to enable construction delivery by 2030–2034.

Table 8.26: 10 Priority TxDOT Partnerships # Project Description

Cost Year

US 81/287 (Decatur Cut- off)

1

$27M

Wagley Robertson

Construct a four-lane divided roadway from Basket Willow to future SB frontage road — City Let Project Contribute cash to the bridge reconstruction. Contribute cash to bridge, safety, and other roadway improvements Reconstruct and widen — ROW/Design $5M (2026); Construction $15M (2030) Reconstruct and widen two-lane undivided to four-lane divided roadway Reconstruct interchange and construct continuous frontage roads Pavement rehabilitation, curb and sidewalk reconstruction Reconstruct and realign intersection — preserve ROW and design Construct full interchange — preserve ROW and design Reconstruct and expand roadway and frontage roads/Collector Distributor with readiness for High Speed and Butler Place Access Rail

$2M

2027

Avondale Haslet Road Bridge

$10M 2030

Other corridorwide projects RM 2871 — Aledo Rd to IH 20 FM 156 — Hillshire to US 81/287

$15M 2030

2026 / 2030

2

$20M

3

$10M 2032

IH 35W/121 Mixmaster North

4

$10M 2030

US 377 — Camp Bowie (Horne to Wellington) FM 1220 at Heritage Trace IH 35W at SH 114 Interchange (Dallas District) IH 30 E — IH 35W to Cooper St IH 30 W — Loop 820 to Chisolm Trail FM 1187 East of IH 35W

5

$5M 2030

6

$10M 2031

7

$10M 2030

8

$30M

2034

9

Reconstruct and expand roadway

$10M

2034

10

Various safety breakout projects

$15M 2030

294

Fort Worth Master Transportation Plan | Prioritized Project List & TIP