Trex Select™ Aluminum Railing Installation Instructions

TREX SELECT ™ ALUMINUM RAILING Horizontal Installation Instructions

HOW TO INSTALL HORIZONTAL SWIVEL BRACKETS/ CONTINUED

Installing Upper Swivel Brackets to Select Aluminum Posts

7

5

5. P lace panel into lower swivel brackets. Temporarily place the upper swivel brackets onto the top rail and mark post at underside of bracket location. If necessary, use a clamp to hold brackets on top rail.

Installing Panel to Brackets 7. A ttach panel to brackets using two #4 x 3/4" self-drilling screws (provided).

6. C enter upper bracket on post above marked line and attach using four #10 x 3/4" self-drilling screws (provided) .

6

8. A ttach bracket covers, caps, and skirts as per previous instructions on page 3.

6

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

SEALHZ-0426

Made with FlippingBook Digital Proposal Creator