TREX SELECT ® ALUMINUM RAILING Horizontal Installation Instructions
HOW TO INSTALL HORIZONTAL SWIVEL BRACKETS » HORIZONTAL SWIVEL BRACKETS CAN BE USED UP TO A 45° ANGLE FOR TREX SELECT ALUMINUM PANEL RAILINGS. » W HEN USING HORIZONTAL SWIVEL BRACKETS IT IS VERY IMPORTANT TO LAY OUT LOCATION AND ORIENTATION OF POSTS AND SWIVEL BRACKETS BEFORE INSTALLING SWIVEL BRACKETS. » ENSURE BARREL BOLTS ON SWIVEL BRACKETS ARE TIGHT DURING AND AFTER RAILING INSTALLATION.
Attach Lower Swivel Brackets to Select Aluminum Posts
Installing Upper Swivel Brackets to Select Aluminum Posts
5
1
2
3-1/8" (7.9 cm)
1. M easure 3-1/8" from decking surface. Mark with light line. 2. C enter lower bracket on post above the marked line and attach using four #10 x 3/4" self-drilling screws (provided).
5. P lace panel into lower swivel brackets. Temporarily place the upper swivel brackets onto the top rail and mark post at underside of bracket location. If necessary, use a clamp to hold brackets on top rail.
How to Measure and Cut Bottom and Top Railings (When Required)
6
6. C enter upper bracket on post above marked line and attach using four #10 x 3/4" self-drilling screws (provided) .
3
Installing Panel to Brackets
7
3. W ith lower brackets in correct swivel location, measure distance from inside of bracket to inside of bracket. Also allow for 1-1/2" clearance on each side for panel rails to attach to brackets. Cut panel as per previous instructions. Attaching Foot Block 4. A ttach foot blocks as per previous instructions on page 2.
7. A ttach panel to brackets using two #4 x 3/4" self-drilling screws (provided).
8. A ttach bracket covers, caps, and skirts as per previous instructions on page 3.
6
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
SEALHZ-0826
Made with FlippingBook Digital Proposal Creator