FW_MTP_Appendices 20260519

Master Transportation Plan Medium-Term Modeling Analysis

No.

Facility / Project Name Westport Pkwy

From

Description

Coded (Y/N)

To

16

IH 35W

Beach St

Reconstruct two (2) lane undivided to four (4)-lane with center turn lane. Design/Construct four (4)-lane divided roadway. Reconstruct two (2)-lane undivided to 4-lane undivided with center turn lane. Retrofit existing six (6) lane divided roadway to enhance safety and operations improvements. Design two (2)-lane undivided to 4-lane divided arterial. Reconstruct and construct 2 to 4- lane undivided with grade separation at railroad Reconstruct four (4)-lane divided with median for resurfacing. Design of reconstructed six (6)- lane divided arterial, pending study. Construct at-grade and design six (6)-lane future grade separation.

Y

17

Altamesa Blvd

Lana Circle

Forest Hill Dr

Y

18

Shelby Rd

Race St

Forest Hill Dr

Y

19

Altamesa Blvd

Wichita St

Lana Circle

Y

20

Altamesa Blvd

Forest Hill Drive

Anglin Drive

Y

21

23rd Street

Niles City Blvd

Northside Drive

Y

22

Forest Park Blvd

Fort Worth Trail/Summit Ave

IH30/Vickery Blvd

Y

23

McCart Ave

Covert Ave

Sycamore School Road

Y

24

Altamesa Blvd

at FWWR RR

Y

www.MovingaMillion.org | transportation@fortworthtexas.gov page 56

Made with FlippingBook - professional solution for displaying marketing and sales documents online