Master Transportation Plan Medium-Term Modeling Analysis
No.
Facility / Project Name Westport Pkwy
From
Description
Coded (Y/N)
To
16
IH 35W
Beach St
Reconstruct two (2) lane undivided to four (4)-lane with center turn lane. Design/Construct four (4)-lane divided roadway. Reconstruct two (2)-lane undivided to 4-lane undivided with center turn lane. Retrofit existing six (6) lane divided roadway to enhance safety and operations improvements. Design two (2)-lane undivided to 4-lane divided arterial. Reconstruct and construct 2 to 4- lane undivided with grade separation at railroad Reconstruct four (4)-lane divided with median for resurfacing. Design of reconstructed six (6)- lane divided arterial, pending study. Construct at-grade and design six (6)-lane future grade separation.
Y
17
Altamesa Blvd
Lana Circle
Forest Hill Dr
Y
18
Shelby Rd
Race St
Forest Hill Dr
Y
19
Altamesa Blvd
Wichita St
Lana Circle
Y
20
Altamesa Blvd
Forest Hill Drive
Anglin Drive
Y
21
23rd Street
Niles City Blvd
Northside Drive
Y
22
Forest Park Blvd
Fort Worth Trail/Summit Ave
IH30/Vickery Blvd
Y
23
McCart Ave
Covert Ave
Sycamore School Road
Y
24
Altamesa Blvd
at FWWR RR
Y
www.MovingaMillion.org | transportation@fortworthtexas.gov page 56
Made with FlippingBook - professional solution for displaying marketing and sales documents online