Master Transportation Plan Medium-Term Modeling Analysis
No.
Facility / Project Name
From
Description
Coded (Y/N)
To
25
Altamesa Blvd
at FWRR
Wichita St
Construct 3-lane undivided arterial; shared use path.
Y
26
Meacham Blvd (East)
I-35W
N. Beach St
Reconstruct 4-lane divided roadway.
Y
27
Eastchase Pkwy/Dottie Lynn Pkwy
East Lancaster (SH180)
John T. White Rd
Design a retrofit of roadway to include advanced signals, transit cue jumps, continuous shared- use paths, and intersection treatments Reconstruct four (4)-lane divided with median for resurfacing. Reconstruct two (2)-lane undivided to 4-lane divided arterial Design four (4)-lane divided arterial.
N
28
Forest Park Blvd
Fort Worth Trail/Summit Ave Technology Boulevard
IH30/Vickery Blvd
Y
Scenario 2
29
Risinger Road
Crowley Rd (FM 731)
Y
30
Precinct Line Rd/Cooks Lane
John T. White Rd
Concho Trail
Y
31
Cooks Lane
Brentwood Stair Rd
Dottie Lynn Pkwy
Reconstruct two (2)-lane divided to four (4)-lane divided arterial.
Y
32
Bowman Roberts Rd
W. Bailey Boswell Rd
WJ Boaz
Design two (2)-lane existing to three 3-lane with center turn lane arterial.
Y
www.MovingaMillion.org | transportation@fortworthtexas.gov page 57
Made with FlippingBook - professional solution for displaying marketing and sales documents online