Master Transportation Plan Medium-Term Modeling Analysis

No.

Facility / Project Name

From

Description

Coded (Y/N)

To

25

Altamesa Blvd

at FWRR

Wichita St

Construct 3-lane undivided arterial; shared use path.

Y

26

Meacham Blvd (East)

I-35W

N. Beach St

Reconstruct 4-lane divided roadway.

Y

27

Eastchase Pkwy/Dottie Lynn Pkwy

East Lancaster (SH180)

John T. White Rd

Design a retrofit of roadway to include advanced signals, transit cue jumps, continuous shared- use paths, and intersection treatments Reconstruct four (4)-lane divided with median for resurfacing. Reconstruct two (2)-lane undivided to 4-lane divided arterial Design four (4)-lane divided arterial.

N

28

Forest Park Blvd

Fort Worth Trail/Summit Ave Technology Boulevard

IH30/Vickery Blvd

Y

Scenario 2

29

Risinger Road

Crowley Rd (FM 731)

Y

30

Precinct Line Rd/Cooks Lane

John T. White Rd

Concho Trail

Y

31

Cooks Lane

Brentwood Stair Rd

Dottie Lynn Pkwy

Reconstruct two (2)-lane divided to four (4)-lane divided arterial.

Y

32

Bowman Roberts Rd

W. Bailey Boswell Rd

WJ Boaz

Design two (2)-lane existing to three 3-lane with center turn lane arterial.

Y