FW_MTP_Appendices 20260519

Altamesa Boulevard Forest Hill Drive to Anglin Drive

PROJECT PURPOSE The project will convert a two-lane undivided roadway to a four-lane divided roadway with shared use paths to enhance mobility, safety, and accessibility. PROJECT OVERVIEW Limits : Forest Hill Dr to Anglin Dr Length : ~1 mile Proposed Cross Section: » Two 11’ travel lanes in each direction » 16’ Median » 10’ shared-use path on both sides » 94’ - 126’ right-of-way

10’ SUP

4.5’

11’ Lane

11’ Lane

16’ Median

11’ Lane

11’ Lane

4.5’

10’ SUP

ALTAMESA BLVD - TYPICAL SECTION

PROJECT BENEFITS

PROJECT COSTS $38.9 million (FY 2030 $) JURISDICTION Council District 8

Reduces traffic congestion by expanding from two lanes to four lanes with a median and enhancing regional connectivity across southern Fort Worth. Reduces safety risks with a divided roadway design, and upgraded street lighting. Incorporates dedicated shared-use paths on both sides of the roadway, promoting walkability and cycling accessibility.

Precinct 1

PROJECT CONTACT transportation@fortworthtexas.gov

www.movingamillion.org

Made with FlippingBook - professional solution for displaying marketing and sales documents online