Town Center | Signage
d. General location of buildings and site improvements and provision of open space, parking, environmental restoration and nonmotorized circulation.
be constructed to serve other properties in the area in a manner consistent with the City’s plans and standards and the adopted Town Center Infrastructure Plan.
C. Application process
2. An application for UZDP may be submitted for:
Pursuant to related standards in SDC 21.09.010.
a. The first UZDP application in each TC-A zone, a property or collection of properties that comprises at least 40 percent of the applicable TC-A zone; b. A property for which the proposed development can be achieved without compromising options for circulation, infrastructure and open space improvements on surrounding properties. The proposal must comply with the City’s adopted Town Center Infrastructure Plan and must accommodate a portion of the zone’s infrastructure, as determined by the director; or c. Properties directly adjacent to the applicable TC-A zone may be included in the UZDP area provided they are part of a plan that includes properties in the TC-A zone. A TC-B property may include up to 10 percent of a UZDP’s commercial development application for contiguous TC-A zone development. The director may place special constraints and/or increase the percentage of commercial development allowed on an applicable TC-B property to 20 percent in order to meet the intent of the Town Center Plan and this Chapter. All residential uses in a TC-B zone remain subject to the defined density and dimensions for a TC-B zone (set forth in SDC 21.07.050). Specifically, in all cases, the applicant will need to demonstrate that infrastructure and circulation systems can
1. Preapplication meeting for City staff to determine applicability of SDC 21.07.120B. 2. Application submittal per SDC 21.09.010 and SDC 21.07.120D. 3. Staff will review, send out the notice of application, provide comments, and the City will conduct an open house per SDC 21.09.010. 4. Staff will continue review as needed to ensure the UZDP meets the applicable standards.
5. Director will render decision based on SDC 21.07.120F.
6. Appeal process will be per SDC 21.09.010 Type 2 land use decision type.
D. Plan application requirements
1. The applicant must submit to the City for approval documents and a plan or plans with the following information.
a. Infrastructure plans indicating:
i. Location, configuration and type of streets as classified by the City’s street design standards;
564 | Title 21: Sammamish Development Code
Effective | January 1, 2022
Made with FlippingBook Ebook Creator