Sammamish Unified Development Code

PublicWorksandBuildings | DevelopmentStandards—InterimStreetDesignStandards

Sammamish Development Code

STREET IMPACT FEE RATES PER UNIT OF DEVELOPMENT

ITE Code 1.

ITE Land Use Category 1.

ITE Trip Rate 2.

Percent New Trips 3.

Trip Length Factor 4.

Net New Trips per Development Unit

Impact Fee per Unit @ $14,063.63

Impact Fee per Trip

942 Auto Care 944 Gas Station 945 Gas Station w/

3.38

30% 14% 14%

0.29 0.29 0.29

0.294 0.563 0.543

4.14

per Sq. Ft.

13.86 13.38

7,913.83 7,639.76

per VSP per VSP

Convenience Market

946 Gas Station w/

13.33

14%

0.29

0.541

7,611.21

per VSP

Convenience Market and Car Wash

947 Self-Serve Car Wash

5.54

14%

0.29

0.225

3,163.25

per VSP

1. Institute of Transportation Engineers, Trip Generation (7th Edition).

2. Trip generation rate per development unit, for p.m. peak hour of the adjacent street traffic (4:00 – 6:00 p.m.

Note: Sq. Ft. rate expressed per 1,000 SF.

3. Omits linked/diverted and pass-by trips, per Trip Generation Handbook: an ITE Recommended Practice, March, 2001.

4. Average trip length relative to single-family trip.

5. DU = dwelling unit, Sq. Ft. = square feet, VSP = vehicle servicing position.

If an applicant proposes a land use that is not identified above, the impact fee shall be an amount equal to $14,063.63 for each p.m. peak hour trip generated, adjusted for trip length and percentage of new trips using methods and data comparable to those in the street study.

590 | Title 21: Sammamish Development Code

Effective | January 1, 2022

Made with FlippingBook Ebook Creator