Trex Metal Railings Cocktail Configurations

Trex® Metal Railings–Cocktail Rail Approved Configurations Installation Instructions

Horizontal Post-to-Post Rail Configurations:

Images shown above are general representations of post-to-post cocktail applications only.

NOTES: »  WHEN INSTALLING POST-TO-POST COCKTAIL RAILING, YOU MUST USE TALLER POSTS. FOR 36" RAILING HEIGHTS USE 42" POST, FOR 42" RAILING HEIGHTS USE 53" POST. FAILURE TO DO THIS WILL NOT ALLOW POST CAPS TO FIT PROPERLY ON POSTS DUE TO INSUFFICIENT CLEARANCE. »  ALL POSTS CAN BE CUT TO DESIRED HEIGHTS ONCE COCKTAIL HEIGHTS ARE ESTABLISHED (CUT POSTS BEFORE RAILING INSTALLATION), HOWEVER ENSURE TO ALLOW ENOUGH SPACE FOR POST CAPS TO FIT PROPERLY.

1

2

5b

5a

5c

1. Measure between posts and cut board to length.

5. Secure deck board to

top rail using required cocktail bracket specific to product line. Ensure there is a cocktail bracket at each end of the rail closest to the post (if installing Signature Mesh or Rod Rail – closest to the vertical), then space remaining cocktail brackets

2. Place deck board onto top rail.

3. On underside of deck board, mark outline of bracket cover location.

4. Remove deck board from rail. Using a router bit, forstner bit, or something similar, rout out this area to allow deck board to fully set onto top rail.

approximately every 24”. Attach cocktail brackets with screws provided. Pre-drilling before attachment is recommended.

6. Install post caps as per product instructions.

2

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

CTAIL-RL-0826

Made with FlippingBook Annual report maker