Stair Post-to-Post Rail Configurations:
Images shown above are general representations of post-to-post cocktail applications only.
NOTES: » FOR STAIR INSTALLATIONS USE A 53" STAIR POST. POST CAN BE CUT TO DESIRED HEIGHT ONCE RAILING HEIGHT IS ESTABLISHED. ENSURE ADEQUATE SPACE FOR POST CAP TO FIT PROPERLY. » WHEN INSTALLING SIGNATURE STAIR RAILINGS (ALL CONFIGURATIONS) WITH POST-TO-POST APPLICATIONS, USE OF A FOOT BLOCK IS RECOMMENDED FOR ALL SPAN LENGTHS. SEE DETAILED INSTRUCTIONS.
4a
4b
1
1. Measure between posts and cut board to length.
4c
4. Secure deck board to
top rail using required cocktail bracket specific to product line. Ensure there is a cocktail bracket at each end of the rail closest to the post (if installing Signature Mesh or Rod Rail – closest to the vertical), then space remaining cocktail
2. On underside of deck board, mark outline of bracket cover location.
3. Remove deck board from rail. Using a router bit, forstner bit, or something similar, rout out this area to allow deck board to fully set onto top rail.
brackets approximately every 24". Attach cocktail brackets with screws provided. Pre-drilling before attachment is recommended.
5. Install post caps as per product instructions.
3
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
CTAIL-RL-0826
Made with FlippingBook Annual report maker