Trex Metal Railings Cocktail Configurations

Trex® Metal Railings–Cocktail Rail Approved Configurations Installation Instructions

Horizontal Continuous (Over-the-Post) Cocktail Rail Configurations:

Images shown above are general representations of continuous cocktail applications only.

NOTES: »  WHEN INSTALLING CONTINUOUS COCKTAIL RAILING, PRESSURE-TREATED POSTS AND SLEEVES MUST BE CUT TO PROPER RAILING HEIGHTS AS OUTLINED BELOW.

4b

4a

Post / Post Sleeve Cut Height 36" Rail Height 42" Rail Height

Signature® Railing Signature® Rod Railing Signature® Mesh Railing

36 1/32" (915 mm)

42 1/32" (1068 mm)

36" (914 mm) 36 1/8" (918 mm)

42" (1067 mm) 42 1/8" (1070 mm)

Select® Aluminum Railing

Enhance® Steel Railing

1

1. Place deck board onto top rail.

4. Secure deck board to

top rail using required cocktail bracket specific to product line. Ensure there is a cocktail bracket at each end of the rail closest to the post (if installing Signature Mesh otr Rod Rail – closest to the vertical), then space remaining cocktail

4c

brackets approximately every 24”. Attach cocktail brackets with screws provided. Pre-drilling before attachment is recommended.

2. On underside of deck board, mark outline of bracket cover location.

3. Remove deck board from rail. Using a router bit, forstner bit, or something similar, rout out this area to allow deck board to fully set onto top rail.

4

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

CTAIL-RL-0826

Made with FlippingBook Annual report maker