8431 Murphy Drive Middleton, WI 53562
Telephone: 608-836-4400 Facsimile: 608-831-9279 www.intertek.com/building
TEST REPORT FOR HY-C COMPANY, LLC Report No.: 104415176MID-002AR2 Date: 11/09/21
8. Upon completion of the new test series, the heater must be re-sealed with a lab-specific seal in accordance with the 2015 Standards. (60.535(a)(2)(vii)). 9. Provide color photographs of the front, top, and side views of the resealed heater. Photos must be date stamped. 10. Submit the above documentation along with your new performance data, i.e., test report within 60 days after completion of the test(s). 11. The test report must include the EPA request to perform new tests on the heater, request to unseal the heater and EPA response granting the unsealing of the heater. The unit was inspected upon receipt and found to be in good condition. The unit was set up following the manufacturer's instructions without difficulty. Following assembly, the unit was placed on the test stand. Because this is the original test sample used for EPA emissions testing, no additional conditioning was required. The unit's chimney system and laboratory dilution tunnels were cleaned using standard wire brush chimney cleaning equipment. On September 15, 2020 the unit was set-up for testing. SECTION 5 EQUIPMENT
EQUIPMENT Data Logger
INV NUMBER
CALIBRATION DUE
MU
10/7/2020 4/7/2021 4/7/2021 1/24/2021 1/24/2021 1/13/2021 1/13/2021 12/9/2020 10/7/2020 10/7/2020 10/13/2020 5/13/2021
0.06°F 0.7 sec 0.7 sec
986
Timer Timer
1213 1212 1413 1414 1406 1407 1538
Flow Meter Flow Meter
0.020 slpm 0.020 slpm
Pressure Transducer Pressure Transducer
0.00007 inH2O 0.00007 inH2O
Hygrometer
0.74 %RH, 0.05°C
Balance
0.00023 g
713
Scale Scale
0.081 lb
8
.118 lb 22 fpm
1134 1457
Anemometer
Version: 03/13/18
Page 4 of 25
RT-L-AMER-Test-3778
Made with FlippingBook - professional solution for displaying marketing and sales documents online