Adopted FWMTP ES 20260609

Table ES.4 provides a summary of the 2026 investment cycle projects, including limits and improvement types, is provided below. Detailed cost informa- tion and PE Report documentation are included in Appendix H.

Table ES.4: 2026 Investment Cycle Projects Project ID Project Sponsor Facility From To

Investment Cycle Activities

City Funds

Other Funding

Federal Funding

Scope

Chapin School Rd (RM 2871) IH-20

City Limit / Aledo Rd SH 170 (Alliance Gtwy) Park Vista Blvd

Reconstruct and widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR Design, NEPA, ROW $5,000,000

111

TxDOT

High Mesa Rd SH 170 (Alliance Gtwy) Old Decatur Rd Wagley Robertson Rd

Construct a (4)-lane divided roadway with a single bridge over the creek and floodplain

Design, NEPA, ROW $500,000

$9,250,000

$5,000,000

116 City of Fort Worth Westport Pkwy

Construct a (4)-lane divided roadway

Design

$300,000

$4,200,000

Future Willow Springs

Construct a (4)-lane divided roadway with a single bridge over the RR and (2) bridge class culverts over the floodplain Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths

Heritage Trace Pkwy Heritage Trace Pkwy Heritage Trace Pkwy

105 City of Fort Worth

Design, NEPA, ROW $3,600,000

$3,000,000

$2,000,000

Boulder Oak Blvd

105 City of Fort Worth

Design, NEPA, ROW $5,100,000

at BNSF Forth Worth Subdivision

105 City of Fort Worth

Design, NEPA, ROW $10,000,000

$8,000,000

E Bailey Boswell Rd

Blue Mound Rd/FM 156 Cobb Park Dr

Horseman Rd US 287 (MLK Fwy)

104 City of Fort Worth

Construct a (4)-lane divided roadway

Construction Design, Construction Design, Construction

$49,700,000

$2,500,000

Reconstruct four (4)-lane divided roadway with TWLTL

112 City of Fort Worth E Berry St

$11,250,000

$14,750,000

West Risinger Rd Bonds Ranch Rd Bonds Ranch Rd Bonds Ranch Rd

204 City of Fort Worth

Crowley Rd Hemphill St Reconstruct and widen from (2)-lane to (4)-lane divided roadway with shared-use paths

$3,800,000

$8,300,000 $41,800,000

Saginaw Main St (BUS 287) Boat Club Rd (FM 1220)

107 City of Fort Worth

Blue Sky Dr Construct a (4)-lane divided with a bridge over the RR

Design, ROW

$2,500,000 $15,000,000 $29,000,000

Saginaw Main St (BUS 287)

106 City of Fort Worth

Widen from (2)-lane to (4)-lane divided roadway Design, Construction

$14,800,000

$11,380,000

Wagley Robertson Rd

107 City of Fort Worth

Blue Sky Dr

Widen from (2)-lane to (4)-lane divided roadway Design, Construction

$50,700,000

$11,958,280

Lon Stephenson Rd

0 Tarrant County

Forest Hill Dr

Bluebell Dr Widen from (2)-lane to (4)-lane divided roadway City Soft and ROW $1,030,000

FW City Limits

Everman County Line Widen from (2)-lane to (4)-lane divided roadway City Soft and ROW $50,000

0 Tarrant County

Wichita St Meacham Blvd

Blue Mound Rd

IH-35W (South Fwy) Widen from (2)-lane to (4)-lane divided roadway

Design, NEPA, ROW, Construction

103 City of Fort Worth 219 City of Fort Worth

$11,800,000

$28,000,000

Wagley Robertson Rd

Bonds Ranch Rd

Quicksilver Trl

Widen from (2)-lane to (4)-lane divided roadway Design

$3,000,000

City of Fort Worth/ Tarrant County

Construct a (2)-lane undivided roadway with a shared-use path on one side and a single bridge over the floodplain

E Altamesa Blvd

Dick Price Rd

109

Anglin Dr

Design, NEPA, ROW $2,900,000

$11,030,000 $15,000,000