Table ES.4 provides a summary of the 2026 investment cycle projects, including limits and improvement types, is provided below. Detailed cost informa- tion and PE Report documentation are included in Appendix H.
Table ES.4: 2026 Investment Cycle Projects Project ID Project Sponsor Facility From To
Investment Cycle Activities
City Funds
Other Funding
Federal Funding
Scope
Chapin School Rd (RM 2871) IH-20
City Limit / Aledo Rd SH 170 (Alliance Gtwy) Park Vista Blvd
Reconstruct and widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR Design, NEPA, ROW $5,000,000
111
TxDOT
High Mesa Rd SH 170 (Alliance Gtwy) Old Decatur Rd Wagley Robertson Rd
Construct a (4)-lane divided roadway with a single bridge over the creek and floodplain
Design, NEPA, ROW $500,000
$9,250,000
$5,000,000
116 City of Fort Worth Westport Pkwy
Construct a (4)-lane divided roadway
Design
$300,000
$4,200,000
Future Willow Springs
Construct a (4)-lane divided roadway with a single bridge over the RR and (2) bridge class culverts over the floodplain Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths
Heritage Trace Pkwy Heritage Trace Pkwy Heritage Trace Pkwy
105 City of Fort Worth
Design, NEPA, ROW $3,600,000
$3,000,000
$2,000,000
Boulder Oak Blvd
105 City of Fort Worth
Design, NEPA, ROW $5,100,000
at BNSF Forth Worth Subdivision
105 City of Fort Worth
Design, NEPA, ROW $10,000,000
$8,000,000
E Bailey Boswell Rd
Blue Mound Rd/FM 156 Cobb Park Dr
Horseman Rd US 287 (MLK Fwy)
104 City of Fort Worth
Construct a (4)-lane divided roadway
Construction Design, Construction Design, Construction
$49,700,000
$2,500,000
Reconstruct four (4)-lane divided roadway with TWLTL
112 City of Fort Worth E Berry St
$11,250,000
$14,750,000
West Risinger Rd Bonds Ranch Rd Bonds Ranch Rd Bonds Ranch Rd
204 City of Fort Worth
Crowley Rd Hemphill St Reconstruct and widen from (2)-lane to (4)-lane divided roadway with shared-use paths
$3,800,000
$8,300,000 $41,800,000
Saginaw Main St (BUS 287) Boat Club Rd (FM 1220)
107 City of Fort Worth
Blue Sky Dr Construct a (4)-lane divided with a bridge over the RR
Design, ROW
$2,500,000 $15,000,000 $29,000,000
Saginaw Main St (BUS 287)
106 City of Fort Worth
Widen from (2)-lane to (4)-lane divided roadway Design, Construction
$14,800,000
$11,380,000
Wagley Robertson Rd
107 City of Fort Worth
Blue Sky Dr
Widen from (2)-lane to (4)-lane divided roadway Design, Construction
$50,700,000
$11,958,280
Lon Stephenson Rd
0 Tarrant County
Forest Hill Dr
Bluebell Dr Widen from (2)-lane to (4)-lane divided roadway City Soft and ROW $1,030,000
FW City Limits
Everman County Line Widen from (2)-lane to (4)-lane divided roadway City Soft and ROW $50,000
0 Tarrant County
Wichita St Meacham Blvd
Blue Mound Rd
IH-35W (South Fwy) Widen from (2)-lane to (4)-lane divided roadway
Design, NEPA, ROW, Construction
103 City of Fort Worth 219 City of Fort Worth
$11,800,000
$28,000,000
Wagley Robertson Rd
Bonds Ranch Rd
Quicksilver Trl
Widen from (2)-lane to (4)-lane divided roadway Design
$3,000,000
City of Fort Worth/ Tarrant County
Construct a (2)-lane undivided roadway with a shared-use path on one side and a single bridge over the floodplain
E Altamesa Blvd
Dick Price Rd
109
Anglin Dr
Design, NEPA, ROW $2,900,000
$11,030,000 $15,000,000
xxiv
Fort Worth Master Transportation Plan | Introduction