Table ES.5 provides a summary of the 2030 investment cycle projects is provided in this section, based on project limits and improvement types. Addi- tional detail, including PE Report summaries and updated cost information, is available in Appendix H.

Table ES.5: 2030 Investment Cycle Projects Project ID Facility From To

Investment Cycle Activities

Bond Activities Costs (Escalated to YOE)

Scope

Chapin School Rd (RM 2871)

City Limit / Aledo Road

Widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR

111

IH-20

Construction

$20,000,000

116 Westport Pkwy High Mesa Rd Park Vista Blvd Construct a (4)-lane divided roadway with a single bridge over the creek and floodplain Construction

$92,114,100

Construct a (4)-lane divided roadway with a single bridge over the RR and (2) bridge class culverts over the floodplain Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided with a bridge over the RR

105 Heritage Trace Pkwy Old Decatur Rd Future Willow Springs

Construction

$68,989,916

Wagley Robertson Rd

Boulder Oak Blvd

105 Heritage Trace Pkwy

Construction

$71,073,719

105 Heritage Trace Pkwy at BNSF Fort Worth Sub

Construction

$84,520,017

Saginaw Main St (BUS 287)

107 Bonds Ranch Rd

Blue Sky Dr

Construction

$17,945,354

219 Wagley Robertson Rd Bonds Ranch Rd Quicksilver Trl Widen from (2)-lane to (4)-lane divided roadway

Construction

$62,027,376

Construct a (2)-lane undivided roadway with a shared-use path on one side and a single bridge over the floodplain

109 E Altamesa Blvd

Anglin Dr

Dick Price

Construction

$116,474,319

Table ES.6: 2030 Investment Cycle Forecasted Capacity 2030 Investment Cycle Total Bond Funding Amount $118,122,819.00 Other Source Funding $299,226,582.00 Total Funding Available $418,349,401.00 Total Funding Used $533,144,800.12 Balance $(115,795,399.12)