Adopted FWMTP ES 20260609

Moving a Million Master Transportation Plan

City of Fort Worth Transportation and Public Works Department

Executive Summary Adopted June 9, 2026

This document was developed using a performance-based approach to transportation decision-making to support the national goals of the Federal-Aid Highway Program as required by 23 USC 150(b).

ES.1. Plan Overview ES.1.1. Preparing for Growth

Today, the City of Fort Worth maintains an extensive and multifaceted transportation network, including over 100 miles of active transportation infrastructure, with 24 miles of natural surface trails, 60 miles of paved trails, and 69.3 miles of on-street bike facilities, alongside a robust freight network spanning 524.5 miles, and a transit system with 40 miles of rail and 644.85 miles of bus routes. Additionally, the City maintains approximately 8,609 lane miles of pavement, which includes both city-owned roads and certain TxDOT- owned roadways maintained through formal maintenance agreements. As shown in Figure ES.2 , Fort Worth’s transportation infrastructure must support both its internal population and the additional 1.9 million residents in the surrounding area as neighboring counties continue to grow and rely on the City for employment, services, and entertainment. Figure ES.1 illustrates the City of Fort’s rapid growth, projecting a 38% increase in population over the next 25 years. The Greater Fort Worth region is projected to reach 4.4 million people by 2050, compounding the demands placed on a transportation network that must serve both local and regional trips.

2.9 Million PEOPLE

287

51

35

Denton

377

288

380

380

Jacksboro

WI SE

287

YOUNG

35E

Graham

114

114

2499

SRT

287

170

114

121

51

199

635

PARKER

161

820

183

Mineral Wells

360

183

180

121

Weatherford

30

PALO PINTO

280

PGBT

20

30

20

377

20

35W

360

CTP

287

51

171

1 Million PEOPLE

377

HOOD

67

JOHNSON

144

35W

Cleburne

1,200,000 1,000,000 800,000 600,000 400,000 200,000

Stephenville

SOMERVELL

1,351,120 PEOPLE

35E

HI LL

COMANCHE

~38% INCREASE

BOSQUE

0

5

10

20

Miles

978,468 PEOPLE

Great Fort Worth includes the MSA Division, Fort Worth TxDOT District, and portions of the SW Denton County and other areas that show strong travel, economic, and cultural ties to Fort Worth.

0

1980 1990 2000 2010 2020 2022 2023 2030 2045 2050 YEAR

Figure ES.1: Fort Worth’s Population Growth

Figure ES.2: Greater Fort Worth Population

ii

Fort Worth Master Transportation Plan | Introduction

ES.1.2. Defining the Master Transportation Plan The MTP is Fort Worth’s first unified, city-wide transportation policy and planning framework designed to guide the City’s mobility future through 2050, focusing on safely and efficiently connecting people to Fort Worth and beyond through the identification and prioritization of roadway network and transit systems, public realm, and street infrastructure projects. The MTP links land use and other infrastructure decisions with transportation investment, helping to: ■ A clear, data-driven capital program that translates policy direction into prioritized projects ■ More strategic funding decisions that support timely and efficient project delivery ■ Greater safety, reliability, and economic competitiveness across the transportation system ES.1.3. MTP Elements Grounded in the community’s vision and built on established policies and initiatives, MTP brings together four key City of Fort Worth mobility initiatives: Transportation Investment Program (TIP), Master Roadway Network, Active Transportation and Micromobility Network (ATMN), and Vision Zero Safety Action Plan (SAP). The following defines the purpose of each Plan Element:

MRN

The Transportation Investment Program (4- year and 10-year program) is Fort Worth’s roadmap for funding and delivering transportation capital projects. It identifies and prioritizes roadway, freight, and active transportation improvements, aligning them with bond programs, grants, and developer contributions. The TIP also sequences projects for near, mid, and long- term delivery to move priorities from planning to construction.

The Master Roadway Network (MRN) is the long- range Plan for major transportation facilities in the City of Fort Worth. The Master Roadway Network is not targeted to a specific point in the future, but is intended to accommodate the ultimate development of the City’s thoroughfare network.

The Active Transportation and Micromobility Network (ATMN) is a citywide network plan for alternative modes of transportation, including walking, cycling and using transit, as well as the needs of wheelchair users and other types of non- motorized mobility devices. Active transportation is an important element of Fort Worth’s mobility network, since it not only increases transportation choices but also supports healthy, active living.

This Vision Zero Safety Action Plan (SAP) is Fort Worth’s roadmap to reducing roadway deaths and severe injuries. It is grounded in the Safe System Approach, which aims to eliminate deaths and severe injuries by anticipating human mistakes and minimizing impacts on the human body when crashes do occur.

iii

Introduction | Fort Worth Master Transportation Plan

ES.1.4. MTP Focus Areas As shown in Figure ES.3 , the current transportation network in Fort Worth comprises four core modes – Roadway, Freight, Active Transportation, and Transit – that together provide a comprehensive multimodal network. Collectively, these modes form an integrated multimodal system that supports Fort Worth’s growth by improving connectivity, reducing congestion, and enhancing access to jobs, education, and services. Each mode serves a distinct purpose, contributing to Fort Worth’s transportation, accessibility, and economic vitality:

Roadway: Streets, arterials, and highways provide the backbone for personal and regional travel, focusing on connectivity and reducing congestion to meet growing demand. Freight: Truck and intermodal routes keep goods moving efficiently, with priority on safe last-mile access and continuous corridors linking industrial hubs and regional markets. Active Transportation: Walking, biking, and rolling options supported by sidewalks and bikeways create safe, connected, and low-stress travel choices that enhance livability and complement transit. Transit: Bus and rail services offer accessibility mobility, connecting people to jobs, schools, and essential services through reliable coverage and frequency. ACTIVE TRANSPORTATION FREIGHT TRANSIT TRANSIT ACTIVE TRANSPORTATION

ROADWAY

ACTIVE TRANSPORTATION

FREIGHT

ACTIVE TRANSPORTATION

TRANSIT

Figure ES.3: Existing Transportation Network

iv

Fort Worth Master Transportation Plan | Introduction

ES.1.5. Realizing the Plan The MTP is designed to deliver fundable and implementable projects through a data-driven approach that prioritizes safety, connectivity, and fiscal responsibility. By aligning technical analysis with financial planning and community priorities, the MTP prioritizes investments that are practical and impactful. The following outlines the foundation of this approach, our priority projects, our implementation timeline, and our financial framework, that together guide how Fort Worth will advance its mobility goals: What - Our Priority Projects The MTP identifies a comprehensive Network of multimodal transportation segments that together shape the Fort Worth transportation backbone. This network addresses safety, access, congestion relief, and system connectivity across roadway, transit, freight, and active- transportation systems. The network reflects the outcomes of technical analysis, community priorities, and coordination among City departments and regional partners. When - Our Implementation Timeline Projects are organized into fiscally constrained short-, medium-, and long-term investment tiers that align with City investment cycles, funding availability, and project readiness. The short-term tier includes projects that can advance within the next bond program; mid-term investments extend through the following decade; and long-term projects represent transformative infrastructure solutions identified for future planning horizons. This timeline aligns with other transportation agencies such as North Central Texas Council of Governments (NCTCOG) and Texas Department of Transportation (TxDOT). How Much - Our Financial Framework The Transportation Investment Program (TIP) integrates fiscal capacity with project selection criteria and policy alignment, prioritizing investments that are both impactful and financially feasible. Estimated project costs, available funding sources, and local match requirements inform each tier’s delivery schedule. Together, these elements define a data-driven framework that the City can update as priorities, funding, and conditions evolve.

Deficiencies or gaps in the network connectivity, accessibility, and safety impact people’s travel experience, development patterns, and the City’s economic competitiveness. The MTP prioritizes projects that support local and regional needs focused on:

Expanding transportation options to meet diverse community needs.

Tackling regional challenges to improve economic competitiveness and reduce traffic.

Closing network gaps caused by railroads, rivers, construction related factors and other barriers.

Rebuilding aging infrastructure to support long-term resilience.

v

Introduction | Fort Worth Master Transportation Plan

TECHNICAL ANALYSIS

COMMUNITY ENGAGEMENT

ES.2. Plan Process ES.2.1. A Community & Data- Driven Plan The MTP planning initiative began in the spring of 2024. Figure ES.4 illustrates the robust outreach effort and technical analysis that helped to explore and identify: Where We are Today, What’s Needed, Community Priorities, and Fundable and Implementable Projects and Policies. Identified projects and network recommendations were informed by technical analysis exploring: ■ Existing performance of the City’s roadway network ■ Identification of a city-wide gap and needs assessment ■ Review of proposed projects’ impact on system performance Paired with the community’s priorities, the analysis results established a program of implementation projects and policy recommendations. In total, the planning effort helped identify: +20 Gaps in Policy Areas to be Addressed

State of the System Multimodal Needs Assessment Transportation Supportive Index (TSI) Transit Propensity Index (TPI)

District Open Houses Surveys Stakeholder Meetings Bond/Comprehensive Plan Meetings

Vision Statement Themes (Priorities) Goals

Network Needs/Gaps Propensity Areas Scoring Methodology

PRIORITIZED PROJECTS LIST

Figure ES.4: Gap Analysis Process and Outcomes

20 Top Prioritized Projects per Active Transportation Modes

+75 Scored & Potential Medium- & Long-Term Improvement Projects

vi

Fort Worth Master Transportation Plan | Introduction

Vision Statement “In 2050, Fort Worth envisions a safe, reliable, and resilient transportation system that empowers all to choose from a range of options, supports economic vitality, connects communities locally and globally, and enhances quality of life. Through sustainable funding, active community engagement, and congestion management strategies, this world-class system will reflect the needs of those it serves.”

ES.2.2. Community Engagement

The process was guided by two stakeholder groups comprised of local leadership and neighborhood representatives, the MTP Community Advisory Committee (CAC), MTP Technical Advisory Committee (TAC), and Interdepartmental Advisory Committee. Feedback collected from the public and the Committees was used to define and refine the MTP goals, objectives, big ideas, and recommendations. City-wide engagement opportunities included: ■ 3 Advisory Groups Community feedback gathered through in- person and digital engagement shaped the identification of key priorities, emphasizing safety, preservation of existing infrastructure, expanded transportation options, and improved access. This input laid the foundation for the MTP Vision and Goals, which are organized around six guiding principles that define Fort Worth’s transportation vision and inform decisions on infrastructure investments, policy development, and performance metrics. ■ 30+ District Open Houses ■ 3 Community-wide Surveys ■ 20+ Community Events

Plan Goals

Safety First Implement measures to reduce crashes and eliminate fatalities and serious injuries across all modes. Fix It First Prioritize cost-effective maintenance and lifecycle planning to preserve existing assets. Human Comfort Create a convenient, connected, and environmentally considerate network that empowers choice.

Economic Competitiveness Support businesses, enhance regional and global connectivity, and promote prosperity. Technology Embrace flexible, resilient technologies to adapt to evolving transportation needs. Opportunity Build an accessible, affordable, and reliable system for all ages and abilities.

vii

Introduction | Fort Worth Master Transportation Plan

ES.3. Analysis Framework

Table ES.1: MTP Analysis Framework Analysis Type Objective

Example Projects / Actions

Key Outputs

A geospatial tool that identifies areas most suitable for investment based on land use, density, and network readiness A comprehensive review of physical and operational gaps across roadway, transit, freight, and active transportation networks Benchmarking Fort Worth’s policies against best practices to address deficiencies in safety, accessibility, and multimodal integration

ES.3.1. Analysis Objective The Multimodal Gap Analysis and Need Assessment serve as a foundational component of the MTP by identifying areas with the greatest need for strategic transportation investment, aligned with long- term development and projected regional growth. It informed targeted interventions that improve connectivity, support future growth, increase access to opportunities, and guide infrastructure prioritization. The analysis focuses on identifying multimodal transportation gaps (i.e., physical, operational, and policy-related) that affect system performance today and will influence future travel demand. The gap analysis is structured around three components, which are detailed in Table ES.1. The outputs of these analyses, as illustrated in Figure ES.5 informed the geographic focus for investment, define physical and operational needs across modes, and allowed for institutional readiness and regulatory support. Together, they produce a prioritized, multimodal project list and policy roadmap for implementation.

Composite scores for districts based on land use, density, and network readiness Identification of physical and operational gaps across roadways, freight, transit, and active transportation Benchmarking policies vs. best practices; identification of gaps in Transit-oriented Development (TOD), curbside management, climate resilience

TOD strategies, infill development, transit expansion in high-scoring areas Roadway lane additions, freight truck routes, sidewalk infill, bikeway extensions

Transportation Supportive Index (TSI)

Multimodal Gap Analysis

TOD overlay zones, dynamic curbside management, climate resilience standards

Policy Gap Analysis

Transportation Supportive Index (TSI)

Priority Investment Areas

Universe of Projects

Multimodal Gap Analysis

Unconstrained Needs Network

Near-Term Projects Medium-Term Projects Long-Term Projects

Regulatory and Programmatic Recommendations

Policy Gap Analysis

Figure ES.5: Analysis Objective Flowchart

viii

Fort Worth Master Transportation Plan | Introduction

ES.3.2. Analysis Outcomes Analysis outcomes identified areas most ready for transportation investment, allocating resources where they will have the greatest impact. This location are illustrated in Figure ES.6 and include the following: ■ Urban Core within I-820 and I-20 Belts: High population and employment density, strong multimodal connectivity, and existing transit ridership make this zone highly supportive of investment. ■ East Fort Worth near DFW Airport: Strategic location with regional connectivity, proximity to major employment centers, and potential for TOD. ■ Designated Growth Centers and Urban Villages: Areas planned for higher-density, mixed-use development that align with City land use goals and support efficient transit and active transportation networks. ■ Corridors with High Intersection Density and Street Connectivity: These areas facilitate shorter trips and active transportation, reducing reliance on single- occupancy vehicles (SOV).

Figure ES.6: TSI Composite Map

ix

Introduction | Fort Worth Master Transportation Plan

ROADWAY

FREIGHT

ACTIVE TRANSPORTATION

TRANSIT

ES.3.3. Multimodal Gap Analysis The performance gap analysis identifies deficiencies across roadway, freight, active transportation, and transit networks in Fort Worth. The following was assessed for each of the modes:

2019 - 2023

52% 2036

daily freight trips 234,457

14.11%

394 1,564

of population impacted by infrequent service

increase in average travel times by

bike related crashes

pedestrian related injuries

freight trips are on local roadways (arterial and below) 40.58%

2019 - 2023

Poor Level of Service 540 919

24.13%

freight crashes crash injuries 8,423 2,228 vehicle trips to grow by at 10 busiest at-grade rail crossings by 2036 145% of total crashes involved a freight vehicle 8.45%

15.9%

of riders impacted by below average service (on-time) performance

Roadway: Identified gaps in network connectivity to key destinations and capacity needs for future demand. Freight: Identified issues impacting freight movement, safety, efficiency, and connectivity within and between regions. Active Transportation: Identified gaps with less connectivity and inadequate infrastructure coverage for multimodal users. Transit: Identified where populations and destinations are not adequately served by the existing Trinity Metro Network. FREIGHT TRANSIT TRANSIT ACTIVE TRANSPORTATION

population in existing bikeway network catchment area (.5 mile)

miles total length in 2026

miles total length in 2036

30

% City Area / Population 67% 6.77%

% City Area

ROADWAY

ACTIVE TRANSPORTATION

busiest intersections, impact safety and travel times for

47.6% 24.55%

fall outside of existing transit service area

poor first- last mile infrastructure near transit

<35% access to sidewalks

<40% access to low-stress bicycle coverage

vehicles daily 30,000

FREIGHT

Figure ES.7: System-Wide Gaps

ACTIVE TRANSPORTATION

ROADWAY

FREIGHT

ACTIVE TRANSPORTATION

TRANSIT

New truck routes, more direct and safer (25 miles local, and 70 miles regional)

Increase lane capacity by

First-Last Mile connectivity improvements

Continuous sidewalks

69.04 Miles

The analysis identified areas where connectivity, capacity, and accessibility fall short of current and projected demand. Outcomes include spatial mapping of gaps, prioritization of high-need corridors, and development of an Unconstrained Roadway Needs Network and prioritized project list. Recommendations focus on targeted infrastructure upgrades, operational improvements, and policy interventions to support multimodal mobility and accessibility. Figures ES.7 and ES.8 provide a high- level overview of system-wide gaps and recommendations: ACTIVE TRANSPORTATION TRANSIT

new roadway 53 Miles

Service improvements (off-peak, scheduling, frequency, transfer times, routes)

first-last mile corridors 23 Miles Being better neighbors:

New or enhanced pedestrian crossings

Operational improvements at strategic intersections

High Priority Grade Separations 18

Trail or on-street bikeway extensions

Core Capacity: Focus on core throughput and citywide mobility

Transfer hub design improvements

Figure ES.8: System-Wide Recommendations

x

Fort Worth Master Transportation Plan | Introduction

ES.3.4. Policy Gap Analysis Outcomes The Policy Gap Analysis establishes a structured approach to evaluate Fort Worth’s transportation-related policies against best practices and regional benchmarks. It focuses on how existing policies support multimodal integration, safety, accessibility, and future- ready infrastructure. The framework used a comparative methodology, reviewing peer city policies across the following areas: ■ Safe Streets ■ Curbside Management ■ Transit Oriented Development (TOD) ■ Transportation Demand Management ■ Vision Zero ■ System Maintenance ■ Project Readiness Active transportation priority areas and transit connectivity opportunities will inform ongoing planning by the City and Trinity Metro. ACTIVE TRANSPORTATION & TRANSIT

Key policy priorities include strengthening safety and accessibility and adopting performance metrics to track outcomes like crash reduction, mode share, and accessibility. Future readiness requires flexible policies that anticipate emerging technologies and climate risks. Recommended actions include codifying TOD overlays, implementing transit priority measures, deploying dynamic curbside management tools, and enforcing connectivity standards to prevent fragmented development. Implementation will require targeted amendments to zoning, subdivision, and traffic ordinances, supported by regional coordination and public-private partnerships. By embedding accountability and adaptability into its policy framework, Fort Worth can position itself for sustainable growth and resilient mobility in the decades ahead.

ROADWAY & FREIGHT

Potential roadway and freight infrastructure investments to be included in the Master Roadway Network and bond program

ACTIVE TRANSPORTATION & TRANSIT

e

Active transportation priority areas and transit connectivity opportunities will inform ongoing planning by the City and Trinity Metro.

Figure ES.8: System-Wide Recommendations (cont’d)

xi

Introduction | Fort Worth Master Transportation Plan

ES.4. Project Selection & Delivery ES.4.1. Project Selection Criteria Moving from identified needs to funded investments requires a clear and transparent process. The project selection process, outlined in Figure ES.9 , identified implementable and fundable roadway, freight, active transportation infrastructure projects by broadly assessing community input and developing a data- driven unconstrained needs network. Identified projects were evaluated against six weighted criteria that balance efficiency, safety, plan alignment, and other priorities, as illustrated in Figure ES.10. The six criteria and weights were informed by MTP goals so that prioritized projects reflect and incorporate community priorities defined through this process. Through scoring and comparison, projects were translated, ranked, and prioritized into short-, medium-, and long-term programs. Past corridor studies by Transportation and Public Works were often tied to bond cycles or regional priorities, such as the East Lancaster study. The MTP introduces a broader framework, combining extensive city-wide outreach with performance-based planning. Corridors requiring reconstruction to modern standards — such as East Berry Street and McCart Avenue — are now prioritized based on data, readiness, community needs, and performance metrics.

IDENTIFY NEEDS

APPLY CRITERIA

SCORE AND COMPARE

PRIORITIZE INVESTMENTS

Unconstrained Network + Community Input

Evaluate Projects to Determine Benefits and Trade-offs

Translate Evaluation into Clear Results to Rank Projects

Group Projects into Short-Medium, and Long-Term Programs

Figure ES.9: Project Selection Process

Economic Development (10%): Supports freight reliability and access to employers and growth areas.

Travel Choice (10%) : Expands mobility options and access for all users.

System Efficiency (30%): Improves travel times, reduces congestion, and increases throughput.

Criteria Definitions & Weights

Cost Effectiveness (10%) : Identifies near-term, high-value projects feasible for implementation.

Plan Alignment (20%) : Helps projects fit within regional/local plans and community priorities.

Safety and Vision Zero (20%) : Reduces crashes and protects vulnerable users through proactive design.

Figure ES.10: Criteria Definitions and Weights

xii

Fort Worth Master Transportation Plan | Introduction

ES.4.2. Transportation Investment Program

Table ES.2: MTP vs. TIP Overview Aspect

Transportation Investment Program (TIP) Master Transportation Plan (MTP)

Focuses on near- and medium-term delivery (1–10 years) Targeted, fundable projects aligned with MTP priorities 4-year- and 10-year (investment cycles and other funding windows) Fiscally constrained; integrates bond program and other funding streams Specific projects with phasing (design, ROW, construction) Drives implementation and prioritization for investment cycles TIP maximizes bond dollars and external funds advance MTP goals

Provides long-range buildout for mobility and growth (25+ years) Systemwide framework for future corridors, modes, and policies Long-term (strategic planning horizon) Conceptual; does not assign funding sources

The TIP marks a major shift in Fort Worth’s approach to transportation planning and delivery. Historically, the City’s bond program acted as the default transportation plan, with project selection driven by available funds at a single point in time. The TIP introduces a fiscally constrained, data-driven framework that prioritizes projects across multiple funding sources rather than relying solely on bonds. The TIP maximizes the impact of every dollar by combining strategic prioritization, phased implementation, and multi-source funding alignment. Key features of the TIP include: ■ Phased Project Delivery: Recognizes that large, complex projects (e.g., grade separations) cannot be completed in one investment cycle. Instead, projects are broken into phases, including design, ROW acquisition, environmental clearance, and construction, which are spread across multiple cycles. ■ Integrated Funding Strategy: Bonds are now one of several tools, alongside regional, state, federal, and private- sector funding, to accelerate delivery and maximize return on investment.

Purpose

Scope

Time Horizon

Funding Role

High-level corridors and modal strategies

Project Detail

Guides overall transportation policy and growth patterns

Decision-Making

TIP translates MTP’s vision into actionable investments

Relationship

The TIP changes this dynamic by embedding bond-funded projects into a multi-cycle, phased delivery strategy aligned with long-range goals. Table ES.2 compares the differences between the MTP and TIP, underscoring that while the MTP provides the long-term framework for mobility and growth, the TIP focuses on near- and medium-term delivery, so that investments address both immediate needs and future priorities. Together, MTP and the TIP create a buildout and project delivery framework that balances vision with practicality, helping Fort Worth build for both today and tomorrow.

■ Realistic Expectations: Sets achievable goals for each cycle, aligning short- and medium-term improvements with long- range objectives. ■ Performance-Based Framework : Aligns the TIP with federal (23 USC 150(b)) and TxDOT (House Bill 20, 2015) performance- based planning requirements, which use measurable data to guide transportation investment decisions. This approach supports coordinated short-, mid-, and long-range planning while strengthening Fort Worth’s competitiveness for federal and state funding partnerships—critical for delivering major projects such as railroad grade separations.

xiii

Introduction | Fort Worth Master Transportation Plan

ES.4.3. Project Delivery The MTP establishes this pathway by linking travel demand network modeling with near- term investment decisions. Through the MTP process, projects move from high-level assessments of future capacity and demand into prioritized project lists, which then inform bond programs and construction schedules. This structure, as displayed in Figure ES.11 , provides a transparent framework for how concepts identified in long-range planning advance into deliverable capital projects.

In the MTP process, the TDM & Network Capacity Needs and Constrained Project Program are inputs, while Transportation Improvement Program and CIP/Bond are outputs.

Travel Demand Modeling &

(<25 yrs) Constrained Project Program

Transportation Investment Program

(<4 yrs) CIP/Bond

(Ultimate) Network Capacity Needs

(<10 yrs)

• Design and Construction •One funding mechanism, not a standalone plan •Meant to maximize and leverage diverse funding profiles •Focused on delivery and public investment impact •Funding received (check cashed)

•Capital project development and readiness •External funding secured •Ties neatly back to Bond funding cycles •Aligns with •Establish project phasing and cash flows •Schematics and NEPA NCTCOG and TxDOT project cycles

•25-year prioritized project list •TDM (horizon year) •Tied to reasonably expected funding sources •Reflects growth

•TDM (build-out) •Required capacity at full entitlement buildout •Based on zoning, adopted plans, and future development •Ultimate carrying capacity needs (max) •Focus on ROW preservation

patterns and system gaps

Figure ES.11: MTP Development to Deliver Funnel

xiv

Fort Worth Master Transportation Plan | Introduction

Table ES.3: Streets and Mobility Categories - Debt Issuance by Investment Cycle Category​ Share (%)​ 2030 ($M) 2034 ($M) Major Roadways​ 38.9%​ ~$118​ ~$134​ Neighborhood Streets​ 26.2%​ ~$80​ ~$90 Mobility (Signals,

Upon establishing the revenue baseline and incorporating financial modeling assumptions, future bond investment cycles are forecasted from that baseline to align identified project needs with reasonably expected available funds, supporting clear, actionable decision-making. Grouping investments by the City’s established investment cycles provides a practical framework for financial planning, project prioritization, and phased implementation. Table ES.3 summarizes forecasted Streets and Mobility debt issuance by category for the 2030 and 2034 investment cycles, illustrating how resources are anticipated to be allocated across major roadways, neighborhood streets, mobility, safety, bridge, and railroad priorities.

Intersections, Streetlights)​

17.7%​

~$54​

~$61​

Bridges​

8.0%​ 8.0%​ 1.2%​ 100%​

~$24​ ~$24​

~$27 ~$27​

Vision Zero​

Railroad​

~$4​

~$4​

Total Streets & Mobility​

~$304​

~$343​

xv

Introduction | Fort Worth Master Transportation Plan

ES.5. Master Roadway Network ES.5.1. Purpose & Role The Master Roadway Network establishes Fort Worth’s long-range framework for planning, preserving, and managing the future roadway system. It replaces the previous Master Thoroughfare Plan and defines how roadways are intended to function, the ROW needed to support ultimate cross-sections, and how corridors are expected to accommodate travel as Fort Worth continues to grow. Figure ES.12 details the inputs used to establish the new Master Roadway Network classifications and capacities. As the City evolves, the Master Roadway Network serves as a coordinating tool that aligns land development, transportation planning, and capital investment decisions. By identifying future roadway functions and ROW needs in advance, the network helps support near-term actions that do not limit long-term system performance. ES.5.2. Functional Classification Framework The updated Master Roadway Network integrates multiple inputs—including the existing roadway system, regional travel demand forecasts, access characteristics, and identified connectivity gaps—into a single, coordinated framework. Each mapped roadway is assigned a functional classification

Spatial join of new Roadway Network Links to 2050 TDM Network Links

Classify links using TDM attributes (DAYVOL, TO TLANE)

QC classification based on access methodology

Functional Class

Access

Capacity Lanes

60,300 40,200 55,700 37,100 35,500

6 4 6 4 4 3 4

Principal Arterials Partially of Fully Controlled / Connects to Limited Access Routes

Major Arterials

Partially or Uncontrolled / Connects to Limited Access Routes

Minor Arterials

Uncontrolled / Connects to Major or Principal Arterials

16,100

Major Collectors

Uncontrolled / Connects to Major or Minor Arterials

20,000

Figure ES.12: Functional Classification Development Framework

that reflects its intended role within the broader transportation system and establishes expectations for access, capacity, and corridor continuity. This system informs planning-level capacity assumptions, guides lane configuration decisions, and supports the consistent operation of roadway corridors across the network as development occurs.

xvi

Fort Worth Master Transportation Plan | Introduction

ES.5.3. Master Roadway Network Components The Master Roadway Network is organized as a nested hierarchy of maps and overlays that together define how Fort Worth’s roadway system is classified, designed, and managed over time. The comprehensive network establishes full citywide classification, within which City-controlled roads are identified as a distinct subset, and overlays are then applied to that subset to reflect land use context and design priorities — providing a coordinated framework that guides right-of-way preservation, cross-section design, and capital investment decisions. Figure ES.13 illustrates how these overlays shape cross-section design across Standard, Freight Priority, and Compact Development Area contexts. ES.5.4. Network Maps Figure ES.14 illustrates the comprehensive Master Roadway Network, which provides full network classification across the city and its extraterritorial jurisdiction, including TxDOT- owned facilities, US and State highways, and all City-controlled roadways. Figure ES.15 illustrates the MRN – City Roads (MRN-CR) map, which identifies the subset of City-owned and maintained roads, classifying them as Principal Arterials, Major Arterials, Minor Arterials, and Major Collectors based on their role in connecting people and goods across the city.

Figure ES.13: MRN Network Overlays

Figure ES.16 illustrates the MRN-CR Ultimate Lane Map, which defines the planned long-term lane configuration for each City-controlled corridor, establishing the baseline for right-of- way preservation, capital project development, and near-term construction decisions. The official boundaries, extents, and classifications of all network maps are maintained by TPW and available through the City of Fort Worth Open Data Portal at https://data.fortworthtexas.gov/. All static maps shown in this document are illustrative.

Figure ES.17 illustrates the network overlays, which are applied to the base network to reflect distinct travel patterns, land use, and design priorities in specific areas. Freight Priority Areas identify corridors supporting goods movement, while Compact Development Areas identify urban contexts where multimodal street design —including enhanced pedestrian and bicycle accommodations and on-street parking— is required.

xvii

Introduction | Fort Worth Master Transportation Plan

Figure ES.14: Master Roadway Network (MRN): Functional Classification

xviii

Fort Worth Master Transportation Plan | Introduction

Figure ES.15: Master Roadway Network - City Roads (MRN-CR): Functional Classification

xix

Introduction | Fort Worth Master Transportation Plan

Figure ES.16: Master Roadway Network - City Roads (MRN - CR): Ultimate Lane Map

xx

Fort Worth Master Transportation Plan | Introduction

Figure ES.17: Master Roadway Network - City Roads (MRN - CR): Network Overlays

xxi

Introduction | Fort Worth Master Transportation Plan

ES.6. Project Evaluation & Prioritization With an understanding of available funding and delivery capacity, the City next evaluated how candidate projects contribute to system performance and adopted priorities. This screening process provides a consistent basis for comparing projects across corridors and modes.

ES.6.1. Project Screening Framework Candidate projects were screened using a consistent, data-driven framework to provide a common basis for comparison across system needs and adopted priorities. The screening focused on relative contribution to key outcomes—such as congestion relief, safety, multimodal connectivity, economic access, and plan alignment.

As shown in Figure ES.18 , inputs representing existing conditions, future growth, and adopted plans were evaluated across a defined set of performance criteria, with most measures derived through GIS-based analysis to create consistency. Screening results were summarized using contribution tiers—high, moderate, low, or no contribution—to support clear comparison and inform development of the prioritized project list.

System Efficiency Projects intersecting congested LOS F corridors within areas of heavy congestion score highest; Partial overlap receives proportionate credit. Safety and Vision Zero Score based on share of project length on the HIN; ≥50% overlap scores highest. Cost Effectiveness Projects ranked relative to cost per mile; Lower-cost projects score higher. Travel Choice Connectivity score derived from gap-density analysis; Higher scores reflect greater network completion. Economic Development Direct connections to major employers or plan-defined growth areas score higher. Plan Alignment Projects included in adopted plans score higher.

Congested Corridors (2036 LOS + Visually Congested Segments)

High Contribution Top-third of non-zero scores for that criterion.

High-Injury Network (HIN)

Cost per Mile Estimates

Moderate Contribution Middle-third

Multimodal Gap Density (Connectivity Hexagons)

Low Contribution Bottom-third

Major Employers and Growth Areas

No Contribution Score of Zero or “-”

Adopted Plans (Mobility 2050, Safety Action Plan)

Figure ES.18: Project Scoring Framework

xxii

Fort Worth Master Transportation Plan | Introduction

Prioritized Roadway Projects by Planning Horizon The map (Figure ES.19) on this page illustrates the prioritized projects identified through the screening process, organized by planning horizon. Projects shown in 2026 , 2030 , and 2034 reflect near- and medium-term priorities aligned with anticipated investment cycles and delivery timelines. Projects identified as long-term address future system needs beyond the next three investment cycles. These projects are included to guide ongoing planning, preserve corridor continuity, and inform future investment decisions.

Figure ES.19: Prioritized Project Map (all time horizons)

xxiii

Introduction | Fort Worth Master Transportation Plan

Table ES.4 provides a summary of the 2026 investment cycle projects, including limits and improvement types, is provided below. Detailed cost informa- tion and PE Report documentation are included in Appendix H.

Table ES.4: 2026 Investment Cycle Projects Project ID Project Sponsor Facility From To

Investment Cycle Activities

City Funds

Other Funding

Federal Funding

Scope

Chapin School Rd (RM 2871) IH-20

City Limit / Aledo Rd SH 170 (Alliance Gtwy) Park Vista Blvd

Reconstruct and widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR Design, NEPA, ROW $5,000,000

111

TxDOT

High Mesa Rd SH 170 (Alliance Gtwy) Old Decatur Rd Wagley Robertson Rd

Construct a (4)-lane divided roadway with a single bridge over the creek and floodplain

Design, NEPA, ROW $500,000

$9,250,000

$5,000,000

116 City of Fort Worth Westport Pkwy

Construct a (4)-lane divided roadway

Design

$300,000

$4,200,000

Future Willow Springs

Construct a (4)-lane divided roadway with a single bridge over the RR and (2) bridge class culverts over the floodplain Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths

Heritage Trace Pkwy Heritage Trace Pkwy Heritage Trace Pkwy

105 City of Fort Worth

Design, NEPA, ROW $3,600,000

$3,000,000

$2,000,000

Boulder Oak Blvd

105 City of Fort Worth

Design, NEPA, ROW $5,100,000

at BNSF Forth Worth Subdivision

105 City of Fort Worth

Design, NEPA, ROW $10,000,000

$8,000,000

E Bailey Boswell Rd

Blue Mound Rd/FM 156 Cobb Park Dr

Horseman Rd US 287 (MLK Fwy)

104 City of Fort Worth

Construct a (4)-lane divided roadway

Construction Design, Construction Design, Construction

$49,700,000

$2,500,000

Reconstruct four (4)-lane divided roadway with TWLTL

112 City of Fort Worth E Berry St

$11,250,000

$14,750,000

West Risinger Rd Bonds Ranch Rd Bonds Ranch Rd Bonds Ranch Rd

204 City of Fort Worth

Crowley Rd Hemphill St Reconstruct and widen from (2)-lane to (4)-lane divided roadway with shared-use paths

$3,800,000

$8,300,000 $41,800,000

Saginaw Main St (BUS 287) Boat Club Rd (FM 1220)

107 City of Fort Worth

Blue Sky Dr Construct a (4)-lane divided with a bridge over the RR

Design, ROW

$2,500,000 $15,000,000 $29,000,000

Saginaw Main St (BUS 287)

106 City of Fort Worth

Widen from (2)-lane to (4)-lane divided roadway Design, Construction

$14,800,000

$11,380,000

Wagley Robertson Rd

107 City of Fort Worth

Blue Sky Dr

Widen from (2)-lane to (4)-lane divided roadway Design, Construction

$50,700,000

$11,958,280

Lon Stephenson Rd

0 Tarrant County

Forest Hill Dr

Bluebell Dr Widen from (2)-lane to (4)-lane divided roadway City Soft and ROW $1,030,000

FW City Limits

Everman County Line Widen from (2)-lane to (4)-lane divided roadway City Soft and ROW $50,000

0 Tarrant County

Wichita St Meacham Blvd

Blue Mound Rd

IH-35W (South Fwy) Widen from (2)-lane to (4)-lane divided roadway

Design, NEPA, ROW, Construction

103 City of Fort Worth 219 City of Fort Worth

$11,800,000

$28,000,000

Wagley Robertson Rd

Bonds Ranch Rd

Quicksilver Trl

Widen from (2)-lane to (4)-lane divided roadway Design

$3,000,000

City of Fort Worth/ Tarrant County

Construct a (2)-lane undivided roadway with a shared-use path on one side and a single bridge over the floodplain

E Altamesa Blvd

Dick Price Rd

109

Anglin Dr

Design, NEPA, ROW $2,900,000

$11,030,000 $15,000,000

xxiv

Fort Worth Master Transportation Plan | Introduction

Table ES.5 provides a summary of the 2030 investment cycle projects is provided in this section, based on project limits and improvement types. Addi- tional detail, including PE Report summaries and updated cost information, is available in Appendix H.

Table ES.5: 2030 Investment Cycle Projects Project ID Facility From To

Investment Cycle Activities

Bond Activities Costs (Escalated to YOE)

Scope

Chapin School Rd (RM 2871)

City Limit / Aledo Road

Widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR

111

IH-20

Construction

$20,000,000

116 Westport Pkwy High Mesa Rd Park Vista Blvd Construct a (4)-lane divided roadway with a single bridge over the creek and floodplain Construction

$92,114,100

Construct a (4)-lane divided roadway with a single bridge over the RR and (2) bridge class culverts over the floodplain Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided roadway with a single bridge over the RR, (2) bridge class culverts over the floodplain, and shared-use paths Construct a (4)-lane divided with a bridge over the RR

105 Heritage Trace Pkwy Old Decatur Rd Future Willow Springs

Construction

$68,989,916

Wagley Robertson Rd

Boulder Oak Blvd

105 Heritage Trace Pkwy

Construction

$71,073,719

105 Heritage Trace Pkwy at BNSF Fort Worth Sub

Construction

$84,520,017

Saginaw Main St (BUS 287)

107 Bonds Ranch Rd

Blue Sky Dr

Construction

$17,945,354

219 Wagley Robertson Rd Bonds Ranch Rd Quicksilver Trl Widen from (2)-lane to (4)-lane divided roadway

Construction

$62,027,376

Construct a (2)-lane undivided roadway with a shared-use path on one side and a single bridge over the floodplain

109 E Altamesa Blvd

Anglin Dr

Dick Price

Construction

$116,474,319

Table ES.6: 2030 Investment Cycle Forecasted Capacity 2030 Investment Cycle Total Bond Funding Amount $118,122,819.00 Other Source Funding $299,226,582.00 Total Funding Available $418,349,401.00 Total Funding Used $533,144,800.12 Balance $(115,795,399.12)

xxv

Introduction | Fort Worth Master Transportation Plan

Table ES.7 provides a summary of the 2034 investment cycle projects is included in this section, reflecting project limits and improvement types. More detailed documentation and cost information are provided in Appendix H.

Table ES.7: 2034 Investment Cycle Projects Project ID Facility From To 237 Old Denton Rd/ Riverside Dr Westport Pkwy Sawtimber Trl

Investment Cycle Activities

Bond Activities Costs (Escalated to YOE)

Scope

Widen from (2)-lane to (4)-lane divided roadway with shared- use paths Widen from (2)-lane to (3)-lane with center turn lane Widen from (3)-lane to (4)-lane divided roadway with pedestrian and shared-use paths

Design, Construction Design, ROW Design, ROW Design, NEPA, ROW Design, ROW Design, Construction

$23,404,455.86

W. Bailey Boswell Rd

207 Bowman Roberts Rd

WJ Boaz Rd

$8,585,146.99

201

Meacham Blvd I-35W (South Fwy)

N. Beach St

$33,893,761.41

W Fork Trinity River WJ Boaz Rd East Lancaster Ave (SH180)

212 Amon-Carter Extension 222 Bowman Roberts Rd

Trinity Blvd Construct a (4)-lane divided roadway with shared-use paths and a single bridge over wetlands, a river, and a flood zone

$112,784,754.69

Ten Mile Bridge Rd John T. White Rd

Widen from (2)-lane to (3)-lane with center turn lane Reconstruct roadway to include advanced signals, transit queue jumps, continuous shared-use paths, and intersection treatments

$34,984,441.30

Eastchase Pkwy/Dottie Lynn Pkwy

202

$162,944,687.71

Table ES.8: 2034 Investment Cycle Forecasted Capacity 2034 Investment Cycle Total Bond Funding Amount $134,171,213.00 Other Source Funding $285,284,668.00 Total Funding Available $419,455,881.00 Total Funding Used $376,597,247.95 Balance $42,858,633.05

xxvi

Fort Worth Master Transportation Plan | Introduction

A ranked summary of long-term projects is provided in Table ES.9 . Supporting materials, including planning-level cost assumptions and environmental screening notes, are included in Appendix H.

Table ES.9: Long-Term Projects: Ranked Priority List Rank Facility From To

Cost Esti- mate (2025) $27,719,348.86 $54,016,320.00 $66,188,072.97 $43,093,000.00 $85,083,123.00 $36,766,248.00 $10,921,342.86 $16,451,691.92 $96,526,765.99

Project ID

Scope

1

Camp Bowie Blvd Hulen St Camp Bowie Blvd Horne St

Boland St

306 Reconstruct brick pavement roadway

2 3 4 5 6 7 8 9

Wellington Rd

115

Reconstruct roadway to include pedestrian and lighting enhancements Widen from (3)-lane to (4)-lane divided roadway with pedestrian and shared-use paths Construct a (4)-lane divided roadway with shared-use paths and a single bridge over wetlands, a river, and a flood zone

Meacham Blvd

I-35W (North Fwy) N. Beach St

201

Amon Carter Blvd W Fork Trinity River Trinity Blvd

212 222 123

Bowman Roberts Rd WJ Boaz

Ten Mile Bridge Rd

Widen from (2)-lane to (3)-lane with center turn lane Reconstruct four (4)-lane divided roadway

Forest Park Blvd

IH-30 (West Fwy)

Fort Worth Trl Blue Mound

E. Bonds Ranch Rd Shire Meadow Roundabout

108 Widen from (2)-lane to (4)-lane divided roadway

E Leslie Drive

Mistletoe Blvd

Park Place

228 Construct a (2)-lane divided roadway with pedestrian/bicycle/technology pathways

Marine Creek Pkwy Old Decatur/Angle NW Loop 820

304 Reconstruct (4)-lane divided roadway

Dottie Lynn Pkwy/ Green Oaks Pkwy Interchange Westport Pkwy

Dottie Lynn Pkwy/Green Oaks Pkwy at E. Lancaster Ave (SH 180)

10

202

Construct interchange

$124,000,000.00

11

IH-35W (North Fwy) Beach St

117

Widen from (2)-lane to (4)-lane divided roadway

$56,000,072.00

Old Granbury Rd/ Sycamore School Rd

13

Bryant Irvin Rd

Summerglade St

220 Construct a (2)-lane roadway, ultimate build is (4)-lane divided roadway

$12,748,611.28

14 15 16 17 18 19

Shelby Rd Cooks Lane

Race St

Forest Hill Dr

119

Widen from (2)-lane to (4)-lane undivided roadway with a center turn lane

$28,675,640.00 $63,181,401.93 $15,936,889.41 $29,166,979.04 $42,185,649.11 $19,848,934.70 $10,689,265.55 $42,412,977.36 $175,138,929.76 $71,806,248.37

Brentwood Stair Rd Dottie Lynn Pkwy

206 Widen from (2)-lane to (4)-lane divided roadway

John T White Rd Risinger Rd Randol Mill Rd Ten Mile Bridge

Newport Rd Hemphill St

Racquet Club Dr Technology Blvd

214 Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 204 Widen from (2)-lane to (4)-lane with a at-grade RR crossing

Precinct Line Rd Racquet Club Bowman Roberts Rd FM 1220 (Boat Club Rd Rosedale Springs Ln Sycamore School Rd

209 Construct a (4)-lane divided roadway

221

Widen from (2)-lane to (3)-lane undivided roadway with a center turn lane

20

Hemphill St Risinger Rd

224 Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 204 Widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR 216 Widen from (2)-lane to (3)-lane undivided roadway with a center turn lane

21

Hemphill St

Technology Blvd

Boat Club Rd (FM 1220)

22 23

Ten Mile Bridge Rd

Samora Ct

Risinger Rd

Technology Blvd Crowley Rd (FM 731)

204 Widen from (2)-lane to (4)-lane divided roadway

xxvii

Introduction | Fort Worth Master Transportation Plan