Adopted FWMTP ES 20260609

A ranked summary of long-term projects is provided in Table ES.9 . Supporting materials, including planning-level cost assumptions and environmental screening notes, are included in Appendix H.

Table ES.9: Long-Term Projects: Ranked Priority List Rank Facility From To

Cost Esti- mate (2025) $27,719,348.86 $54,016,320.00 $66,188,072.97 $43,093,000.00 $85,083,123.00 $36,766,248.00 $10,921,342.86 $16,451,691.92 $96,526,765.99

Project ID

Scope

1

Camp Bowie Blvd Hulen St Camp Bowie Blvd Horne St

Boland St

306 Reconstruct brick pavement roadway

2 3 4 5 6 7 8 9

Wellington Rd

115

Reconstruct roadway to include pedestrian and lighting enhancements Widen from (3)-lane to (4)-lane divided roadway with pedestrian and shared-use paths Construct a (4)-lane divided roadway with shared-use paths and a single bridge over wetlands, a river, and a flood zone

Meacham Blvd

I-35W (North Fwy) N. Beach St

201

Amon Carter Blvd W Fork Trinity River Trinity Blvd

212 222 123

Bowman Roberts Rd WJ Boaz

Ten Mile Bridge Rd

Widen from (2)-lane to (3)-lane with center turn lane Reconstruct four (4)-lane divided roadway

Forest Park Blvd

IH-30 (West Fwy)

Fort Worth Trl Blue Mound

E. Bonds Ranch Rd Shire Meadow Roundabout

108 Widen from (2)-lane to (4)-lane divided roadway

E Leslie Drive

Mistletoe Blvd

Park Place

228 Construct a (2)-lane divided roadway with pedestrian/bicycle/technology pathways

Marine Creek Pkwy Old Decatur/Angle NW Loop 820

304 Reconstruct (4)-lane divided roadway

Dottie Lynn Pkwy/ Green Oaks Pkwy Interchange Westport Pkwy

Dottie Lynn Pkwy/Green Oaks Pkwy at E. Lancaster Ave (SH 180)

10

202

Construct interchange

$124,000,000.00

11

IH-35W (North Fwy) Beach St

117

Widen from (2)-lane to (4)-lane divided roadway

$56,000,072.00

Old Granbury Rd/ Sycamore School Rd

13

Bryant Irvin Rd

Summerglade St

220 Construct a (2)-lane roadway, ultimate build is (4)-lane divided roadway

$12,748,611.28

14 15 16 17 18 19

Shelby Rd Cooks Lane

Race St

Forest Hill Dr

119

Widen from (2)-lane to (4)-lane undivided roadway with a center turn lane

$28,675,640.00 $63,181,401.93 $15,936,889.41 $29,166,979.04 $42,185,649.11 $19,848,934.70 $10,689,265.55 $42,412,977.36 $175,138,929.76 $71,806,248.37

Brentwood Stair Rd Dottie Lynn Pkwy

206 Widen from (2)-lane to (4)-lane divided roadway

John T White Rd Risinger Rd Randol Mill Rd Ten Mile Bridge

Newport Rd Hemphill St

Racquet Club Dr Technology Blvd

214 Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 204 Widen from (2)-lane to (4)-lane with a at-grade RR crossing

Precinct Line Rd Racquet Club Bowman Roberts Rd FM 1220 (Boat Club Rd Rosedale Springs Ln Sycamore School Rd

209 Construct a (4)-lane divided roadway

221

Widen from (2)-lane to (3)-lane undivided roadway with a center turn lane

20

Hemphill St Risinger Rd

224 Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 204 Widen from (2)-lane to (4)-lane divided roadway with a single bridge over the RR 216 Widen from (2)-lane to (3)-lane undivided roadway with a center turn lane

21

Hemphill St

Technology Blvd

Boat Club Rd (FM 1220)

22 23

Ten Mile Bridge Rd

Samora Ct

Risinger Rd

Technology Blvd Crowley Rd (FM 731)

204 Widen from (2)-lane to (4)-lane divided roadway

xxvii

Introduction | Fort Worth Master Transportation Plan

Made with FlippingBook flipbook maker