Table ES.9: Long-Term Projects: Ranked Priority List (cont’d) Rank Facility From To Project ID

Cost Esti- mate (2025) $ 49,400,000.00 $13,756,896.00 $37,423,097.85 $112,156,245.72 $31,719,102.36 $ 61,600,000.00 $24,747,586.36 $16,756,564.04 $127,556,217.09 $77,872,254.80 $40,624,447.33 $28,788,692.00 $17,544,140.00 $58,945,880.00 $40,095,782.32 $108,091,340.00 $23,041,720.00 $67,624,392.24

Scope

Boat Club Rd (FM 1220)

24 25 26 27 28 29

WJ Boaz

Elkins School Rd

101

Widen from (2)-lane to (4)-lane divided roadway with shared-use paths

Altamesa Blvd

Wichita St

Lana Cir

120 Construct a (4)-lane divided roadway Construct a (4)-lane divided roadway 227

Chapel Creek Blvd IH 30 (West Fwy)

Barnwell Drive Eagle Pkwy

North Beach

Keller Haslet

238 Construct a (4)-lane divided roadway with shared-use paths 223 Widen from (2)-lane to (4)-lane divided roadway

Sendera Ranch Blvd Diamondback Rd Avondale Haslet Rd

Wagley Robertson Rd

East Bonds Ranch Rd US 81/287 (Decatur Cut Off) Columbus Trail/ Sycamore School Rd Bryant Irvin Rd

107

Widen from (2)-lane to (4)-lane divided roadway

30

Brewer Blvd

218 Widen from (2)-lane to (4)-lane roadway

31

Chapin Rd

Chapel Creek Blvd Wispy Trail John T. White Rd Concho Trail

309 Widen from (3)-lane to (5)-lane divided roadway and reconstruct intersection

Precinct Line Rd/Cooks Lane

32

205 Construct a (4)-lane divided roadway

23rd Street/Decatur Ave/Samuels Ave Niles City Blvd Wagley Robertson Rd Coneflower Tr

Construct roadway with a single bridge over the RR and shared-use paths and widen adjacent roadways

33 34 35 36 37 38 39 40

Brennan Ave

122 217

City Limits

Widen from (2)-lane to (3)-lane with center turn lane

E Altamesa Blvd E Altamesa Blvd Altamesa Blvd Randol Mill Rd E Altamesa Blvd E Altamesa Blvd

Forest Hill Dr

Anglin

121

Construct a (4)-lane divided roadway

at FWWRR Everman Subdivision

126 Construct a (3)-lane roadway with a TWLTL, at-grade RR crossing, and a single bridge over the creek 109 Widen from (2)-lane to (4)-lane divided roadway with shared-used paths on both sides, a raised median, and a twin bridge over the floodplain Widen from (2)-lane to (4)-lane divided roadway with shared-use paths 126 Construct a (6)-lane divided roadway with a single bridge over the creek 211

Anglin Dr

Dick Price Rd

Oakland Blvd Campus Dr

Woodhaven Blvd

Witchita St Forest Hill Dr

Lana Cir Ramey St

118

Construct a (4)-lane divided roadway

Westshore Way (Quail Ridge Rd)

41

E. Berry St

210 Construct a (3)-lane undivided roadway with shared-use path

NW Green Oaks Blvd (in Arlington)

Construct a (4)-lane divided roadway with shared-use paths and a single bridge over the wetland and a flood zone

42

John T White Rd

Racquet Club Dr

213

$89,934,842.79

43

Old Blue Mound Rd FM 156

Litsey Rd

4022 Construct a new (4)-lane divided roadway crossing I-35W, RR and electric transmission lines and through floodplain

$240,052,736.56

NW Green Oaks Blvd (in Arlington) Basswood Blvd

44 45 46 47 48 49 50

Greenbelt Rd Sandshell Blvd

Greenbelt Rd

4015 4016 4017

Construct a new (2)-lane roadway crossing through wide floodplain Construct a new (2)-lane divided roadway crossing through wide floodplain

$71,985,891.75 $71,658,176.00 $27,462,000.00 $21,329,157.20 $17,500,213.16 $16,145,000.00 $26,147,706.96 $34,137,236.35

Alliance Town Ctr

Amon Carter Blvd SH 183 (Airport Fwy) Trinity Blvd

Reconstruct (6)-lane divided roadway

Texas Longhorn Way I-35W SB FR

Old Denton Rd Founders Way Randol Mill Rd Ederville Rd Jack Newell Blvd Great Southwest Pkwy (in Grand Prairie)

4005 Construct a new (2)-lane roadway crossing of I-35W 4002 Construct a new (2)-lane roadway crossing of I-35W

Golden Triangle Blvd Little Cina Ln Anderson Blvd

Prestige Rd Winding Ln T Square St

4033 Construct a new (2)-lane roadway

4032 4052

Construct a new (2)-lane roadway crossing I-30 and through floodplain Construct a new (4)-lane divided roadway crossing through wide floodplain and electric transmission lines

51

Elliott Reeder Rd

Carson St

52

Amon Carter Blvd Trinty Blvd

4010 Construct a new (4)-lane undivided roadway

$17,292,660.00

Construct a new (2)-lane divided roadway crossing through floodplain and over I-35W

53

Summerfields Blvd

IH 35W (North Fwy) N Riverside Dr

4020

$49,134,000.00

xxviii

Fort Worth Master Transportation Plan | Introduction