RTT Industrial Paint Booths Installation Manual

8. Verify walls are plumb and booth is square and on floor layout marks. Tighten all mounting hardware. 9. Anchor floor channel to floor at a minimum of every 12 inches. 10. Caulk all panel joints inside the booth with the caulk provided. Do not use a silicone caulk. 11. If booth is supplied with a personnel door or product doors, apply gasket to perimeter of all door openings. Attach door hardware and adjust latches. Level door with doors off, then attach doors to hinges.

DOOR LATCH AND SEAL DETAIL

DOOR FRAME BASE DETAIL

PRODUCT DOOR DOOR SWEEP DETAIL

12.Other

tallation that may apply to your type of booth

USE 3/8"  HARDWARE TO ASSEMBLE @ EACH 5-HOLE PATTERN (NUT & BOLT)

USE 1/2"  HARDWARE TO ASSEMBLE ITEMS PICTURED (BOLT, NUT & LOCK WASHERS

FOR OPTIMAL DOOR SEAL APPLY 3/4" GASKET TO THIS SURFACE

USE 1/2"  HARDWARE TO ASSEMBLE ITEMS PICTURED (BOLT, NUT & LOCK WASHERS

INSTALL PANEL STIFFENERS ON THE OUTSIDE OF CEILING PANEL JUNCTION AS SHOWN DO NOT INSTALL IN BETWEEN