Carrejo et al. Carbon Neutrality
(2026) 5:3
Page 19 of 35
Fig. 8 Life cycle greenhouse gas emissions associated with the integration of a CCS facility into a UBSK pulp and paper mill (System 3), normalized by the gross biogenic CO₂ captured—representing the theoretical maximum carbon removal under each scenario. Results are shown for three point source scenarios: ( a ) recovery boiler only, ( b ) recovery boiler and CCS biomass boiler, and ( c ) recovery boiler, CCS biomass boiler, and P&P biomass boiler
Made with FlippingBook Online newsletter maker