Carrejo et al. Carbon Neutrality
(2026) 5:3
Page 26 of 35
Fig. 13 Carbon flux profiles for System 5: ( a ) immediate biogenic carbon release from mill combustion sources (biomass boilers, recovery boiler, and lime kiln), and ( b ) carbon storage credit from three years of temporary sequestration in the packaging product
Figure 13b illustrates the fate of the linerboard prod- uct after it leaves the mill. A three-year service life is assumed, during which the boxes are reused (e.g., for storage, distribution, or moving) before being inciner- ated. This duration represents an optimistic yet realis- tic upper-bound scenario for temporary carbon storage. During this period, the carbon remains sequestered, reducing cumulative radiative forcing. Upon incineration at year 3, a new CO 2 pulse is emitted, which is gradu- ally offset by forest regrowth. With this storage credit, the dynamic GWP bio decreases to 0.0655 kg CO 2 per kg
The warming effect of the delayed CO 2 is illustrated in Fig. 13. Figure 13a shows the instant release case: every tonne of biogenic carbon is oxidised immediately in the hog fuel boilers, the recovery boiler, and the lime kiln. All of the resulting CO 2 therefore enters the atmosphere at once, and no credit is assigned for the carbon that remains temporarily stored in finished products. Under this assumption, the dynamic GWP bio equals 0.0856 kg CO 2e per kg CO 2bio because the entire emission pulse warms the atmosphere until forest regrowth gradually offsets it.
Made with FlippingBook Online newsletter maker