District of Hope Spray Park Feasibility Study

Spray Park Feasibility Study

August 5, 2026

District of Hope – Engineering Department

Version 1.0

Key Considerations: Recirculation Systems ✔ Significantly reduced water consumption

✔ Lower demand on municipal water and sewer systems ✔ Greater operational flexibility and system controls ✖ Higher construction costs ✖ More complex operation, maintenance, and regulatory requirements

Flow-Through vs. Recirculation Spray Park Systems Feature Flow-Through System

Recirculation System

Higher – potable water is used once before being discharged to the sanitary sewer.

Lower – water is continuously filtered, treated, and reused, with only periodic top-ups required. Higher capital cost due to pumps, filtration, treatment, and control equipment. Higher annual operating costs for treatment chemicals, testing, maintenance, and electricity. More complex operation requiring specialized maintenance and equipment servicing. Daily water quality testing and ongoing monitoring required to meet health regulations. Higher; typically requires split-phase or three-phase electrical service. Conserves water but requires chemical treatment and additional energy use.

Water Use

Lower capital cost due to simpler mechanical systems.

Construction Cost

Lower annual operating and maintenance costs.

Operating Cost

Simpler operation with fewer mechanical components.

Maintenance

Water Quality Testing

Minimal, as fresh potable water is continuously supplied.

Power Requirements

Low; typically a standard 120V electrical connection. Greater potable water consumption and higher sanitary sewer discharge volumes.

Environmental Considerations

Operational Complexity

Low

Moderate to High

3.3. Municipal Water & Sewer Infrastructure Capacity Although a spray park would increase demand on the District's water and sanitary sewer systems, preliminary review indicates that existing municipal infrastructure can accommodate the anticipated flows. Additional engineering analysis will be required during detailed design to confirm system capacity and identify any required upgrades.