Spray Park Feasibility Study
August 5, 2026
District of Hope – Engineering Department
Version 1.0
Key Findings ✔ Existing municipal water and sewer infrastructure can support a future spray park. ✔ Additional engineering analysis will be required during detailed design to confirm long-term system capacity. ✔ Seasonal spray park operations reduce impacts because peak demand occurs during the summer rather than during wet-weather sewer events. Gravity Sewer Network Capacity Regarding sanitary sewer servicing, there is generally sufficient capacity within the gravity sewar system to accommodate additional flows from the candidate sites. Downstream of Candidate Location 2, the District's Sanitary Master Plan identifies two isolated sections of the gravity sewer network along Coquihalla Street, between 4 th and 5 th avenues, that are approaching capacity. The 200mm diameter sewers in this area are at approximately 90% capacity in existing conditions, and in future growth scenarios these mains will reach their available capacity. The addition of flows from spray park operations could approach or exceed available capacity during peak operating conditions, but a more detailed analysis of the capacity of this system should be conducted to determine the risk of surcharging the main. Peak spray park usage is expected to occur during summer afternoons, whereas peak sanitary sewer flows typically occur during wet-weather events and during the morning and evening hours. Because these peak demands are unlikely to occur simultaneously, the overall impact on sewer capacity may be reduced. Additional analysis will be required during detailed design to confirm this assumption. 3.3.1. 3.3.2. Coquihalla Lift Station Capacity Regardless of the selected location, wastewater generated by the spray park would ultimately be conveyed through the Coquihalla Lift Station. The Coquihalla Lift Station is a critical infrastructure, conveying wastewater from the downtown and Kawkawa Lake areas to the District's Pollution Control Centre (PCC). This pump station is estimated to have a total capacity of 110L/s according to the District’s Sanitary Master Plan. Existing flows entering this pump station are estimated to be approximately 80L/s at the Coquihalla pump station, at 73% of total capacity. Future growth scenarios have estimated an ultimate demand of 97 L/s, reaching 88% of capacity. Peak flows from a spray park, particularly a flow-through system, could increase flows to near or above the station's theoretical capacity during peak spray park operation. Because peak spray park usage is expected to occur during summer conditions rather than peak wet-weather events, these peak demands may not occur simultaneously. This assumption should be confirmed during a detailed design. Contribution of Rainfall to Sanitary Sewer Flows Seasonal operating patterns reduce one of the primary concerns associated with additional sanitary sewer flows. Typical sewer flows reach their peak during the wettest months of the year, when unintended infiltration and inflows enter the sanitary sewer network due to elevated groundwater levels and heavy rainfall events. Sanitary sewer design is typically governed by these Peak Wet Weather Flow (PWWF) conditions which consider the additional flow observed in sewer system following extended periods of wet weather. In Hope, the PWWF is frequently over twice the Average Dry Weather Flow (ADWF) which is more reflective of the day-to-day demands on the sewer system. 3.3.3.
Page 18
File: 5260-25
Made with FlippingBook - professional solution for displaying marketing and sales documents online