Spray Park Feasibility Study
August 5, 2026
District of Hope – Engineering Department
Version 1.0
A unique advantage of spray park flows is their seasonal nature. Peak wet weather conditions rarely occur during the summer months when spray park usage is expected to be highest. As a result, peak rainfall inflows and peak spray park flows are unlikely to occur simultaneously, reducing the potential impact on sanitary sewer capacity. This assumption should be confirmed during a detailed design of the selected site. To further reduce impacts on the sanitary sewer system, a secondary connection to the stormwater drainage system could be incorporated into the spray park design. While this connection would not be used during normal spray park operation, it could direct precipitation runoff to the storm system during the off-season, reducing unnecessary contributions to the sanitary sewer and the District's Pollution Control Centre. A simple valve and wye assembly would allow Operations staff to redirect drainage as part of the annual winterization process. This approach should be considered during preliminary design. 3.3.4. Capacity of Potable Water Supply Both candidate sites explored in this study would draw from the District’s 87m water zone. A spray park would increase overall demand within the District's 87m water zone, resulting in modest additional reservoir drawdown during operation and a temporary reduction in available fire flows nearby. This would present itself as an additional reservoir drawdown during park operations as well as a possible reduction of available flows for fire protection in the immediate vicinity of the splash pad. Available flow in the 87m water systems varies by location but are generally acceptable for residential land-usage. Available flows in the vicinity of the Memorial Park exceed 80L/s and exceed 110L/s at 6th Avenue according to the Water Master Plan. These available fire flows do fall short of requirements for commercial and industrial land usage, which ideally require more than 150L/s for full fire protection. Flow utilized by the splash pad during operating hours could directly reduce this available fire flow by up to 18L/s in the case of a large flow-through system. Given the existing nature of these flow deficiencies, the intermittent and seasonal nature of the spray park and the availability of alternative solutions to reduce fire flow requirements, these constraints to water conveyance could be deemed acceptable. Despite these drawbacks, the 87m water zone is relatively robust, as it is supplied by three operational wellheads (wells #1, #2 and #3), and a 1587m 3 reservoir volume with sufficient head pressure supplying the zone. The wells themselves are over 50 years old and will require eventual replacement, but the replacement of pumps at well #1 and #2 in the past 10 years have extended their operational lifespans, reducing the risk to the water system. The anticipated annual water demand of approximately 12,000m³ represents roughly 1.5% of the existing annual water consumption within the 87m water zone. The Water Master plan has indicated that a small deficiency of 400m 3 exists in the 87m water zone under the design scenario of a sustained 150L/s fire flow for 2 hours. This deficiency assumes simultaneous occurrence of maximum daily water usage plus fire flows. While this is the ideal design scenario, very few locations in the 87m water zone are even capable of delivering this theoretical 150L/s fire flow requirement in the existing condition without adversely impacting pressure in the water system. Future improvements to the cross-
Page 19
File: 5260-25
Made with FlippingBook - professional solution for displaying marketing and sales documents online