Spray Park Feasibility Study
August 5, 2026
District of Hope – Engineering Department
Version 1.0
Figure 8: Conceptual Servicing Strategy for Spray Park in Memorial Park
The water connection could be sourced from the 150 mm diameter watermain along Commission Street. The proposed water connection would tie into the 150 mm watermain along Commission Street, which transitions to a 50 mm diameter crossing beneath 3rd Avenue. Typical spray park services require a 50 mm connection or smaller; however, should detailed design indicate a larger service is required, this section of watermain could be upgraded accordingly. The sanitary sewer connection can be made to the existing sanitary sewer infrastructure at the intersection of 3 rd Avenue and Commission Street. To avoid disturbing the existing 200 mm asbestos concrete sewer main, it is recommended that the connection be made directly at the existing sanitary manhole. If the optional drainage service is pursued, to provide off-season drainage to the pad, the connection can be made in the same area as the water and sewer connections. If an optional storm drainage connection is included for off-season drainage, it is also recommended that the connection be made directly at the existing manhole to avoid tapping the asbestos concrete pipe.
Overall, Memorial Park can be serviced using existing municipal water and sewer infrastructure, with no significant servicing constraints identified at the feasibility stage. Final utility alignments,
Page 21
File: 5260-25
Made with FlippingBook - professional solution for displaying marketing and sales documents online